部分填充混凝土的端承式预制拼装钢桥墩抗震性能研究

吴庆雄 郑其鑫 袁辉辉 秦志清 张硕

吴庆雄, 郑其鑫, 袁辉辉, 秦志清, 张硕. 部分填充混凝土的端承式预制拼装钢桥墩抗震性能研究[J]. 交通运输工程学报, 2026, 26(5): 179-192. doi: 10.19818/j.cnki.1671-1637.2026.034
引用本文: 吴庆雄, 郑其鑫, 袁辉辉, 秦志清, 张硕. 部分填充混凝土的端承式预制拼装钢桥墩抗震性能研究[J]. 交通运输工程学报, 2026, 26(5): 179-192. doi: 10.19818/j.cnki.1671-1637.2026.034
WU Qing-xiong, ZHENG Qi-xin, YUAN Hui-hui, QIN Zhi-qing, ZHANG Shuo. Research on seismic performance of end-bearing prefabricated steel bridge piers with partially filled concrete[J]. Journal of Traffic and Transportation Engineering, 2026, 26(5): 179-192. doi: 10.19818/j.cnki.1671-1637.2026.034
Citation: WU Qing-xiong, ZHENG Qi-xin, YUAN Hui-hui, QIN Zhi-qing, ZHANG Shuo. Research on seismic performance of end-bearing prefabricated steel bridge piers with partially filled concrete[J]. Journal of Traffic and Transportation Engineering, 2026, 26(5): 179-192. doi: 10.19818/j.cnki.1671-1637.2026.034

部分填充混凝土的端承式预制拼装钢桥墩抗震性能研究

doi: 10.19818/j.cnki.1671-1637.2026.034
基金项目: 

国家自然科学基金项目 52578183

国家自然科学基金项目 51978169

福建省交通运输科技发展计划项目 202211

详细信息
    作者简介:

    吴庆雄(1973-),男,福建南靖人,研究员,工学博士,E-mail:wuqingx@fzu.edu.cn

    通讯作者:

    袁辉辉(1985-),男,福建柘荣人,研究员,博士生导师,工学博士,E-mail:yuanhh@fzu.edu.cn

  • 中图分类号: U443.22

Research on seismic performance of end-bearing prefabricated steel bridge piers with partially filled concrete

Funds: 

National Natural Science Foundation of China 52578183

National Natural Science Foundation of China 51978169

Fujian Provincial Transportation Science and Technology Development Plan Project 202211

More Information
    Corresponding author: YUAN Hui-hui, research fellow, PhD, E-mail: yuanhh@fzu.edu.cn
Article Text (Baidu Translation)
  • 摘要:

    为探究端承式部分填充混凝土的预制拼装钢桥墩(PS-PFC)的抗震性能,在已有研究的基础上,以混凝土填充率为参数,增加了2个填充率分别为0和50%的大比例试件的拟静力试验,并通过ABAQUS进行了该类桥墩的有限元模拟与拓展参数分析。试验结果表明:端承式PS-PFC到达极限状态时的共同破坏形态表现为柱底钢板的弯曲变形和锚杆的拉伸变形,此外,未填充混凝土的桥墩还出现了柱底加劲肋上方钢管的鼓曲和撕裂,这说明部分填充混凝土能有效遏制钢管局部屈曲的发生;该类桥墩的滞回曲线呈较为饱满的捏拢状,具有良好的抗震性能;当填充率由0增加至25%时,桥墩的弹性刚度增加了9.5%,水平承载力增加了17.1%,继续增加填充率至50%,试件的刚度和承载力未见明显变化;与未填充混凝土的桥墩相比,填充率为25%和50%的桥墩的累积滞回耗能增加了约88%,并表现出更强的抗强度退化和刚度退化的能力;有限元模拟结果与试验结果吻合较好,桥墩的抗震性能随混凝土填充率的增大有所提升,然而当填充率增加到一定程度时,继续填充混凝土对桥墩水平承载力的影响并不显著;提出的端承式PS-PFC弹性刚度、水平承载力和最优混凝土填充率的理论计算方法,计算结果与试验结果和有限元模拟结果吻合良好。

     

  • 图  1  试件尺寸与柱脚三维构造(单位:mm)

    Figure  1.  Dimensions of specimens and three-dimensional construction of the column base (unit: mm)

    图  2  试件安装与加载

    Figure  2.  Installation and loading of specimens

    图  3  加载装置与测点布置(单位:mm)

    Figure  3.  Test setup and measurement points arrangement (unit: mm)

    图  4  试件破坏形态

    Figure  4.  Failure modes of specimens

    图  5  各试件关键截面钢管应变-荷载曲线

    Figure  5.  Strain-load curves of steel tube of key sections of specimens

    图  6  各试件滞回曲线和骨架曲线

    Figure  6.  Hysteretic curves and skeleton curves of specimens

    图  7  滞回耗能能力对比

    Figure  7.  Comparison of hysteretic energy dissipation capacities

    图  8  刚度退化对比

    Figure  8.  Comparison of stiffness degradations

    图  9  强度退化对比

    Figure  9.  Comparison of strength degradations

    图  10  有限元模型

    Figure  10.  Finite element model

    图  11  有限元模型的验证

    Figure  11.  Validation of finite element models

    图  12  混凝土填充率参数分析骨架曲线对比

    Figure  12.  Comparison of skeleton curves for parametric analysis of concrete filling ratio

    图  13  端承式PS-PFC等效抗弯刚度计算

    Figure  13.  Equivalent bending stiffness calculation of end-bearing PS-PFC

    图  14  空钢管截面受力计算

    Figure  14.  Force calculation for empty steel tube section

    图  15  柱底截面受力计算

    Figure  15.  Force calculation for column base section

    表  1  试件主要参数

    Table  1.   Main parameters of specimens

    试件编号 L/mm D/mm t/mm n Lc/mm η/%
    DC-0 3 000 500 10 0.15 0 0
    DC-25[19] 3 000 500 10 0.15 750 25
    DC-50 3 000 500 10 0.15 1 500 50
    下载: 导出CSV

    表  2  钢材力学性能

    Table  2.   Mechanical properties of steel

    材料 Es/GPa υ fy/MPa fu/MPa
    钢管 206 0.30 425 610
    锚杆 215 0.29 420 625
    管内纵筋 198 0.30 342 516
    下载: 导出CSV

    表  3  混凝土力学性能

    Table  3.   Mechanical properties of concrete

    强度等级 Ec/GPa fcu/MPa υ
    C50 34.6 52.5 0.22
    下载: 导出CSV

    表  4  试验与有限元模拟的骨架曲线特征值对比

    Table  4.   Comparison of characteristic values of skeleton curves between test and FEM simulation

    试件编号 DC-0 DC-25 DC-50
    加载方向 正向 负向 均值 正向 负向 均值 正向 负向 均值
    Ka 试验值/(kN·mm-1 6.83 10.38 8.61 9.56 9.30 9.43 9.31 9.60 9.46
    有限元结果/(kN·mm-1 7.64 8.20 7.92 9.48 10.04 9.76 10.62 11.34 10.98
    误差/% 11.9 -21.0 -8.0 -0.8 8.0 3.5 14.1 18.1 16.1
    Py 试验值/kN 208.0 261.5 234.8 271.0 295.9 283.5 274.0 288.1 281.1
    有限元结果/kN 245.0 244.2 244.6 269.2 268.2 268.7 275.8 269.7 272.8
    误差/% 17.8 -6.6 4.2 -0.7 -9.4 -5.2 0.7 -6.4 -3.0
    δy 试验值/mm 48.0 47.7 47.9 47.4 48.1 47.8 47.8 47.2 47.5
    有限元结果/mm 49.8 48.3 49.1 48.0 48.0 48.0 49.6 47.2 48.4
    误差/% 3.7 1.3 2.5 1.3 -0.2 0.5 3.8 0.0 1.9
    Ky 试验值/(kN·mm-1 4.33 5.48 4.91 5.72 6.15 5.93 5.73 6.10 5.92
    有限元结果/(kN·mm-1 4.92 5.06 4.99 5.61 5.59 5.60 5.56 5.71 5.64
    误差/% 13.5 -7.8 1.6 -1.9 -9.2 -5.7 -3.0 -6.4 -4.7
    Pm 试验值/kN 280.5 315.4 298.0 331.4 366.4 348.9 360.8 377.6 369.2
    有限元结果/kN 275.9 274.9 275.4 328.0 323.2 325.6 328.7 324.1 326.4
    误差/% -1.6 -12.8 -7.6 -1.0 -11.8 -6.7 -8.9 -14.2 -11.6
    δm 试验值/mm 92.2 95.8 94.0 119.3 120.1 119.7 119.0 119.8 119.4
    有限元结果/mm 96.0 96.0 96.0 96.0 96.0 96.0 96.0 96.0 96.0
    误差/% 4.1 0.2 2.1 -19.5 -20.1 -19.8 -19.3 -19.9 -19.6
    下载: 导出CSV

    表  5  缩尺尺度下试验结果、理论计算结果与有限元结果对比

    Table  5.   Comparison of test results, theoretical calculation results and finite element results at reduced scale

    填充率/% Ka,T/(kN·mm-1 Ka,FEM/(kN·mm-1 Ka,C/(kN·mm-1 Ka,T/Ka,C Ka,FEM/Ka,C Pm,T/kN Pm,FEM/kN Pm,C/kN Pm,T/Pm,C Pm,FEM/Pm,C
    0 8.61 7.92 7.77 1.11 1.02 298.0 275.4 295.9 1.01 0.93
    5 8.01 8.20 0.98 285.0 295.9 0.96
    15 9.08 9.07 1.00 304.8 321.1 0.95
    25 9.43 9.76 9.92 0.95 0.98 348.9 325.6 342.5 1.02 0.95
    50 9.46 10.98 11.74 0.81 0.94 369.2 326.4 343.5 1.07 0.95
    75 11.87 12.77 0.93 327.7 343.8 0.95
    下载: 导出CSV

    表  6  实桥尺度下理论计算结果与有限元结果对比

    Table  6.   Comparison between theoretical calculation results and finite element results at prototype scale

    填充率/% Ka,FEM/(kN·mm-1 Ka,C/(kN·mm-1 Ka,FEM/Ka,C Pm,FEM/kN Pm,C/kN Pm,FEM/Pm,C
    0 26.12 23.31 1.12 2 050.4 2 214.0 0.93
    5 26.17 24.60 1.06 2 308.2 2 514.4 0.92
    15 29.72 27.21 1.09 2 315.3 2 520.0 0.92
    25 31.47 29.77 1.06 2 324.2 2 524.4 0.92
    50 34.58 35.22 0.98 2 347.3 2 531.2 0.93
    75 36.66 38.30 0.96 2 350.0 2 533.8 0.93
    下载: 导出CSV
  • [1] 葛继平, 闫兴非, 王志强. 灌浆套筒和预应力筋连接的预制拼装桥墩的抗震性能[J]. 交通运输工程学报, 2018, 18(2): 42-52. doi: 10.19818/j.cnki.1671-1637.2018.02.005

    GE Ji-ping, YAN Xing-fei, WANG Zhi-qiang. Seismic performance of prefabricated assembled pier with grouted sleeve and prestressed reinforcements[J]. Journal of Traffic and Transportation Engineering, 2018, 18(2): 42-52. doi: 10.19818/j.cnki.1671-1637.2018.02.005
    [2] 袁万城, 钟海强, 党新志, 等. 装配式桥墩连接形式抗震性能研究进展[J]. 东南大学学报(自然科学版), 2022, 53(3): 609-622.

    YUAN Wan-cheng, ZHONG Hai-qiang, DANG Xin-zhi, et al. Research progress on seismic performance of precast piers with different connection forms[J]. Journal of Southeast University (Natural Science Edition), 2022, 53(3): 609-622.
    [3] 林上顺, 林永捷, 夏樟华, 等. 现浇ECC和预制榫卯混合连接装配式RC桥墩抗震性能[J]. 交通运输工程学报, 2023, 23(5): 104-117. doi: 10.19818/j.cnki.1671-1637.2023.05.006

    LIN Shang-shun, LIN Yong-jie, XIA Zhang-hua, et al. Anti-seismic performance of cast-in-place ECC and prefabricated mortise-tenon hybrid connection assembled RC bridge piers[J]. Journal of Traffic and Transportation Engineering, 2023, 23(5): 104-117. doi: 10.19818/j.cnki.1671-1637.2023.05.006
    [4] TAZARV M, SHRESTHA G, SAIIDI M S. State-of-the-art review and design of grouted duct connections for precast bridge columns[J]. Structures, 2021, 30: 895-909. doi: 10.1016/j.istruc.2020.12.091
    [5] ZHANG G D, HAN Q, XU K, et al. Experimental investigation of seismic behavior of UHPC-filled socket precast bridge column-foundation connection with shear keys[J]. Engineering Structures, 2021, 228: 111527. doi: 10.1016/j.engstruct.2020.111527
    [6] 王春生, 翟慕赛, 王雨竹. 钢桥疲劳研究进展[J]. 交通运输工程学报, 2024, 24(1): 9-42. doi: 10.19818/j.cnki.1671-1637.2024.01.002

    WANG Chun-sheng, ZHAI Mu-sai, WANG Yu-zhu. Research progresses on fatigue in steel bridges[J]. Journal of Traffic and Transportation Engineering, 2024, 24(1): 9-42. doi: 10.19818/j.cnki.1671-1637.2024.01.002
    [7] 王春生, 王一伟, 张静雯, 等. 长寿命耐候钢桥锈层稳定性原位测试与评价[J]. 交通运输工程学报, 2025, 25(4): 161-178. doi: 10.19818/j.cnki.1671-1637.2025.04.012

    WANG Chun-sheng, WANG Yi-wei, ZHANG Jing-wen, et al. In-situ testing and evaluation of rust layer stability in long lasting weathering steel bridges[J]. Journal of Traffic and Transportation Engineering, 2025, 25(4): 161-178. doi: 10.19818/j.cnki.1671-1637.2025.04.012
    [8] 孙东德, 杨勇, 马银科, 等. 可更换加劲肋角钢自复位柱脚抗震性能试验研究[J]. 建筑结构学报, 2023, 44(5): 195-208.

    SUN Dong-de, YANG Yong, MA Yin-ke, et al. Experimental study on seismic performance of self-centering column base with replaceable steel stiffener angle[J]. Journal of Building Structures, 2023, 44(5): 195-208.
    [9] GAN D, ZHANG Y J, ZHOU X H, et al. Investigation of cyclic behavior of partially concrete-filled steel tubular columns[J]. Engineering Structures, 2024, 300: 117175. doi: 10.1016/j.engstruct.2023.117175
    [10] 王占飞, 隋伟宁, 赵中华, 等. 带有横隔板补强的部分填充圆形钢管混凝土桥墩柱抗震性能研究[J]. 建筑结构学报, 2013, 34(增1): 233-239.

    WANG Zhan-fei, SUI Wei-ning, ZHAO Zhong-hua, et al. Study on seismic performance of partially concrete-filled steel circular bridge piers with transverse diaphragm[J]. Journal of Building Structures, 2013, 34(S1): 233-239.
    [11] 崔瑶, 李浩, 刘浩, 等. 外露式钢柱脚受剪性能试验研究[J]. 建筑结构学报, 2017, 38(7): 51-58.

    CUI Yao, LI Hao, LIU Hao, et al. Experimental study on shear behavior of exposed column base[J]. Journal of Building Structures, 2017, 38(7): 51-58.
    [12] 崔瑶, 刘浩, 李浩, 等. 外露式钢柱脚抗震性能试验研究[J]. 建筑结构学报, 2018, 39(7): 115-122.

    CUI Yao, LIU Hao, LI Hao, et al. Experimental study on seismic behavior of exposed steel column base[J]. Journal of Building Structures, 2018, 39(7): 115-122.
    [13] 崔瑶, 李浩, 刘浩, 等. 外露式钢柱脚恢复力特性分析[J]. 工程力学, 2018, 35(7): 232-242.

    CUI Yao, LI Hao, LIU Hao, et al. Hysteretic resistance mechanism of exposed steel column bases[J]. Engineering Mechanics, 2018, 35(7): 232-242.
    [14] CUI Y, WANG F Z, YANG C C, et al. Using composite yield mechanism to mitigate seismic damage to exposed steel column base connections[J]. Engineering Structures, 2021, 232: 111877. doi: 10.1016/j.engstruct.2021.111877
    [15] LIM W Y, LEE D, YOU Y C. Exposed column-base plate strong-axis connections for small-size steel construction[J]. Journal of Constructional Steel Research, 2017, 137: 286-296. doi: 10.1016/j.jcsr.2017.06.018
    [16] LIM W Y, LEE D, YOU Y C. Cyclic loading tests on exposed column-base plate weak-axis connections of small-size steel structures[J]. Engineering Structures, 2017, 153: 653-664. doi: 10.1016/j.engstruct.2017.10.066
    [17] QIAO Q Y, ZHANG W W, MOU B, et al. Seismic behavior of exposed concrete filled steel tube column bases with embedded reinforcing bars: Experimental investigation[J]. Thin-Walled Structures, 2019, 136: 367-381. doi: 10.1016/j.tws.2018.12.039
    [18] CHEN Z H, XU J H, ZHOU T, et al. Seismic research on column base joint of L-shaped CFST columns under cyclic loading[J]. Structures, 2022, 45: 1212-1224. doi: 10.1016/j.istruc.2022.09.095
    [19] 吴庆雄, 郑其鑫, 袁辉辉, 等. 柱脚形式不同的部分填充混凝土装配式钢桥墩抗震性能研究[J]. 土木工程学报, 2026, 59(4): 122-138.

    WU Qing-xiong, ZHENG Qi-xin, YUAN Hui-hui, et al. Research on seismic performance of prefabricated steel bridge piers with partially filled concrete in different column foot forms[J]. China Civil Engineering Journal, 2026, 59(4): 122-138.
    [20] 张兴疆, 甘丹, 何明胜. 水平力作用下部分填充方钢管混凝土柱的最优填充率分析[J]. 建筑钢结构进展, 2023, 25(2): 32-41.

    ZHANG Xing-jiang, GAN Dan, HE Ming-sheng. Analysis of optimal filling ratio of partially concrete-filled square steel tubular columns under lateral force[J]. Progress in Steel Building Structures, 2023, 25(2): 32-41.
    [21] 王占飞, 隋伟宁, 李帼昌, 等. 水平往复荷载作用下部分填充混凝土圆形钢桥墩柱的力学性能[J]. 中国公路学报, 2015, 28(1): 62-70.

    WANG Zhan-fei, SUI Wei-ning, LI Guo-chang, et al. Mechanical behavior of partially concrete-filled steel circular bridge piers under cyclic lateral load[J]. China Journal of Highway and Transport, 2015, 28(1): 62-70.
    [22] 王占飞, 张霞, 李帼昌. 基于延性性能圆形钢桥墩內填混凝土补强填充高度的简易计算方法[J]. 沈阳建筑大学学报(自然科学版), 2016, 32(5): 827-837.

    WANG Zhan-fei, ZHANG Xia, LI Guo-chang. A simple method to calculate the concrete-filled height of steel tubular bridge piers with concrete-filled based on the ductility performance[J]. Journal of Shenyang Jianzhu University (Natural Science), 2016, 32(5): 827-837.
    [23] 袁辉辉, 唐艺航, 吴庆雄, 等. 部分填充混凝土薄壁带肋箱型钢桥墩拟动力试验[J]. 河海大学学报(自然科学版), 2016, 44(6): 504-511.

    YUAN Hui-hui, TANG Yi-hang, WU Qing-xiong, et al. Pseudo-dynamic test study of partially concrete-filled steel bridge piers with thin-walled ribbed box sections[J]. Journal of Hohai University (Natural Sciences), 2016, 44(6): 504-511.
    [24] 徐艳, 王臻, 陈智钊. 部分充填钢管混凝土独柱墩的最小混凝土充填率[J]. 同济大学学报(自然科学版), 2021, 49(11): 1546-1555.

    XU Yan, WANG Zhen, CHEN Zhi-zhao. Minimum concrete filling rate of single partially concrete-filled steel tubular piers[J]. Journal of Tongji University (Natural Science), 2021, 49(11): 1546-1555.
  • 加载中
图(15) / 表(6)
计量
  • 文章访问数:  76
  • HTML全文浏览量:  36
  • PDF下载量:  15
  • 被引次数: 0
出版历程
  • 收稿日期:  2025-04-11
  • 录用日期:  2025-08-25
  • 修回日期:  2025-07-30
  • 刊出日期:  2026-05-28

目录

    /

    返回文章
    返回