| Citation: | LU Zhi-qiang, LIANG Liang. Modeling and property analysis of operation scheduling problem at container terminal[J]. Journal of Traffic and Transportation Engineering, 2009, 9(4): 98-102. doi: 10.19818/j.cnki.1671-1637.2009.04.019 |
| [1] |
VIS I F A, DE KOSTER R. Transshipment of containers ata container terminal: an overview[J]. European Journal ofOperational Research, 2003, 147(1): 1-16. doi: 10.1016/S0377-2217(02)00293-X
|
| [2] |
PETERKOFSKY RI, DAGANZO C F. Abranch and boundsolution method for the crane scheduling problem[J]. Trans-portation Research Part B, 1990, 24(3): 159-172.
|
| [3] |
DAGANZO C F. The crane scheduling problem[J]. Trans-portation Research Part B, 1989, 23(3): 159-175. doi: 10.1016/0191-2615(89)90001-5
|
| [4] |
KI M K H, KI M K Y. An opti mal routing algorithmfor atransfer crane in port container terminals[J]. TransportationScience, 1999, 33(1): 17-33.
|
| [5] |
KI M K H, PARK Y M. Acrane scheduling method for portcontainer terminals[J]. European Journal of OperationalResearch, 2004, 156(3): 752-768. doi: 10.1016/S0377-2217(03)00133-4
|
| [6] |
BISH E K. A multiple-crane-constrained scheduling problemin a container terminal[J]. European Journal of OperationalResearch, 2003, 144(1): 83-107. doi: 10.1016/S0377-2217(01)00382-4
|
| [7] |
KNOLL A, BESSOULE J J, SARGUEIL F, et al. Routingstraddle carriers for the loading operation of containers usinga beam search algorithm[J]. Computers and IndustrialEngineering, 1999, 36(1): 109-136.
|
| [8] |
CHEN L, BOSTEL N, DEJAX P, et al. Atabu search algo-rithm for the integrated scheduling problem of containerhandling systems in a mariti me terminal[J]. EuropeanJournal of Operational Research, 2007, 181(1): 40-58. doi: 10.1016/j.ejor.2006.06.033
|
| [9] |
ZHANGJie-shu. On the si mulation model for port produc-tion scheduling[J]. Journal of Shanghai Mariti me University, 2005, 26(2): 42-46. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SHHY200502013.htm
|
| [10] |
ZHANG Hai-lin, JI ANG Zhi-bin, XU Hong. A si mulationstudy of container terminal scheduling system[J]. Journal ofShanghai Jiaotong University, 2006, 40(6): 1024-1030. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SHJT200606032.htm
|
| [11] |
ZENG Qing-cheng, YANG Zhong-zhen. Abi-level program-ming model and its algorithm for operation scheduling in containerter minals[J]. Journal of Harbin Engineering University, 2007, 28(3): 277-281. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HEBG200703006.htm
|