| Citation: | YIN Jia-nan, HU Ming-hua, ZHAO Zheng. Simulation model and algorithm of multi-runway airport gate assignment[J]. Journal of Traffic and Transportation Engineering, 2010, 10(5): 71-76. doi: 10.19818/j.cnki.1671-1637.2010.05.013 |
| [1] |
SOLAK S, CLARKE J P B, JOHNSON E L. Airport terminal capacity planning[J]. Transportation Research Part B: Methodological, 2009, 43(6): 659-676. doi: 10.1016/j.trb.2009.01.002
|
| [2] |
CHEN Xin, LU Xun, ZHUJin-fu. Model and algorithmfor airport gate assignment problem[J]. Journal ofTraffic and Transportation Engineering, 2006, 6(4): 88-90. (in Chinese) doi: 10.3321/j.issn:1671-1637.2006.04.020
|
| [3] |
YAN S Y, TANG C H. Aheuristic approachfor airport gate assignments for stochastic flight delays[J]. European Journal ofOperational Research, 2007, 180(2): 547-567. doi: 10.1016/j.ejor.2006.05.002
|
| [4] |
DI NG H, LI M A, RODRIGUES B, et al. The over-con-strained airport gate assignment problem[J]. Computers and Operations Research, 2005, 32(7): 1867-1880. doi: 10.1016/j.cor.2003.12.003
|
| [5] |
CHANG Gang. Research on aircraft stands assignment and optimizationin civil airport[D]. Xi an: Northwestern Poly-technical University, 2006. (in Chinese)
|
| [6] |
YAN S Y, HUO C M. Optimization of multiple objective gate assignments[J]. Transportation Research Part A: Policy and Practice, 2001, 35(5): 413-432. doi: 10.1016/S0965-8564(99)00065-8
|
| [7] |
WENJun, SUN Hong, XU Jie, et al. Study of the gate assignment in airport based onfixedjob scheduling algorithm[J]. Systems Engineering, 2004, 22(7): 102-106. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GCXT200407024.htm
|
| [8] |
DEBBAGE K G. Airport runway slots limits to growth[J]. Annals of Tourism Research, 2002, 29(4): 933-951. doi: 10.1016/S0160-7383(02)00004-X
|
| [9] |
MADAS M A, ZOGRAFOS K G. Airport slot allocation: frominstruments to strategies[J]. Journal of AirTransport Management, 2006, 12(2): 53-62. doi: 10.1016/j.jairtraman.2005.08.001
|
| [10] |
WANG Yan-jun, HU Ming-hua, SU Wei. Dynamic taxi way routing algorithm based on conflict avoidance[J]. Journal of Southwest Jiaotong University, 2009, 44(6): 933-939. (in Chinese) doi: 10.3969/j.issn.0258-2724.2009.06.023
|
| [11] |
JANIC M. Modelling the capacity of closely-spaced parallel runways usinginnovative approach procedures[J]. Transpor-tation Research Part C: Emerging Technologies, 2008, 16(6): 704-730. doi: 10.1016/j.trc.2008.01.003
|
| [12] |
TIAN Yong, FUJian-jun, WANG Yan-jun. Research on airport gound capacity evaluation[J]. Journal of Nanjing University of Aeronautics and Astronautics, 2006, 38(5): 619-622. (in Chinese) doi: 10.3969/j.issn.1005-2615.2006.05.018
|
| [13] |
MADAS M A, ZOGRAFOS K G. Airport capacity vs. de-mand: mismatch or mismanagement-[J]. Transportation Research Part A: Policy and Practice, 2008, 42(1): 203-226. doi: 10.1016/j.tra.2007.08.002
|
| [14] |
SI MI NICEANU RI, CI ARDO G. Formal verification of the NASArunway safety monitor[J]. Electronic Notes in The-oretical Computer Science, 2005, 128(6): 179-194.
|
| [15] |
SI NGH G K, MEIER C. Preventing runway incursions and conflicts[J]. Aerospace Science and Technology, 2004, 8(7): 653-670.
|