| Citation: | CHENG Gao, ZHOU Guang-jin, LI Wei, MENG Xiang-jian, WEN Qiang, KANG Wei, WEN Bo-hua, LIU Yong-jian. Force transfer performance of chambers in steel-concrete joint section of railway composite beam cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2026, 26(9): 155-174. doi: 10.19818/j.cnki.1671-1637.2026.174 |
To investigate the force transfer mechanism and mechanical properties of these joint sections, a single-cell chamber of a joint section from a railway composite cable-stayed bridge was selected as the research object. By eliminating the front bearing plate and embedded steel beam section from the preliminary design of the actual bridge, a theoretical formula for shear transfer length was derived. Based on this theoretical formula, a single-cell test model with a scale ratio of 1∶2.5 was designed and constructed. The stress distribution, load-bearing capacity, and force transfer characteristics of the joint section under axial compression conditions were analyzed. A finite element model was established to investigate the force transfer mechanism, load-bearing performance, and accuracy of the shear transfer length formula under varying parameters. Results indicate that two equal shear transfer lengths exist within the joint section, determined solely by the axial compression stiffness of steel and concrete, along with the stiffness of the continuous spring layer at the interface. The model's load-bearing capacity reaches six times the equivalent bearing capacity. The measured surface stress distribution and axial force transfer ratio exhibit rapid changes at both ends while stabilizing in the middle. Shear connectors at both ends demonstrate high utilization rates, with measured shear transfer length values deviating no more than 5% from theoretical values. According to the influence analysis of force transfer mechanism parameters, the variation patterns of force transfer ratios and relative slip under different parameters align with experimental measurements, with the force transfer mechanism remaining fundamentally consistent. The finite element values for shear transfer length exhibit less than 20% deviation from theoretical values. Changes in bearing plate thickness and joint section length have no effect on shear transfer length. The factors influencing shear transfer length are chamber width, chamber height, perforated steel plate thickness, and others, ranking from greatest to least in impact. The difference in connection group utilization rate across varying joint section lengths can reach 15%. The utilization rate influence ranking of relative slip and connection group is as follows: joint section length, chamber width, chamber height, and others. In design, the joint section length should be appropriately selected. Additionally, the density of shear connectors at both ends can be increased while the number in the middle can be reduced to enhance utilization rate.
| [1] |
CAI Jian-ye. Design of steel-concrete joint segment for cable-stayed bridge with hybrid girder[J]. Railway Standard Design, 2014, 58(1): 68-71.
|
| [2] |
LUO Shi-dong. Railway steel box hybrid composite girder cable-stayed bridge[M]. Beijing: China Railway Publishing House, 2017: 1-469.
|
| [3] |
KANG Wei, LI Wei, WEN Qiang, et al. Mechanical performance of steel-concrete joint section in railway double-box hybrid girder cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2025, 25(3): 114-129. doi: 10.19818/j.cnki.1671-1637.2025.03.007
|
| [4] |
DENG Ji-hua, HE Zi-an, HE Jun, et al. Exact finite element method for time-dependent analysis of steel-concrete composite beams considering shear deformation[J]. Journal of Traffic and Transportation Engineering, 2026, 26(5): 111-124. doi: 10.19818/j.cnki.1671-1637.2026.095
|
| [5] |
YANG Shi-li, SHI Zhou, PU Qian-hui, et al. Mechanical behavior of steel-concrete joint section in high-speed railway twin-box hybrid girder cable-stayed bridge[J]. Journal of the China Railway Society, 2022, 44(10): 150-160.
|
| [6] |
WANG Xiao-fei. Finite element analysis of steel-concrete joint section in long-span four-track railway hybrid girder cable-stayed bridge[J]. Railway Standard Design, 2018, 62(11): 82-87.
|
| [7] |
ZHANG Qing-hua, LI Qiao, TANG Liang. Failure mechanism and ultimate bearing capacity of shear keys in steel-concrete joint section of bridge pylons[J]. China Journal of Highway and Transport, 2007(1): 85-90.
|
| [8] |
ZHANG Qing-hua, LI Qiao, BU Yi-zhi. Load transfer mechanism of PBL shear connector group (Ⅰ): Theoretical model[J]. China Civil Engineering Journal, 2011, 44(4): 71-77.
|
| [9] |
ZHANG Qing-hua, LI Qiao, BU Yi-zhi. Load transfer mechanism of PBL shear connector group (Ⅱ): Ultimate bearing capacity[J]. China Civil Engineering Journal, 2011, 44(5): 101-108.
|
| [10] |
HU Feng-qiang, WAN Hong-long, LYU Li-ming. Parameter design and mechanical performance analysis of steel cells in steel-concrete joint section of composite girder cable-stayed bridge[J]. Journal of Nanchang University (Engineering & Technology), 2014, 36(1): 31-34.
|
| [11] |
ZHANG Xi-gang, WU Wen-ming, LIU Gao. Mechanical model and simplified calculation method for steel-concrete joint without cells and with bearing plate[J]. Journal of Highway and Transportation Research and Development, 2013, 30(10): 49-53.
|
| [12] |
ZHANG Guang-hui, CHEN Cong, LIU Yu-qing. Collaborative mechanism of cells and bearing plate in hybrid girder joint[J]. Journal of Tongji University (Natural Science), 2017, 45(5): 658-663.
|
| [13] |
LI Y, LIU Y, WANG F, et al. Load transfer mechanism of hybrid pylon joint with cells and bearing plates[J]. Advances in Civil Engineering, 2018, 2018(12): 6289721.
|
| [14] |
WU Yan-bin, HUANG Fang-lin. Analysis of load transfer mechanism of steel-concrete joint section in main girder of Hongshui River Bridge[J]. Bridge Construction, 2018, 48(4): 56-61.
|
| [15] |
QIN Feng-jiang, ZHOU Xu-hong, LIANG Bo-wen, et al. Model test of steel-concrete joint section in main girder of long-span self-anchored suspension bridge[J]. China Journal of Highway and Transport, 2018, 31(9): 52-64.
|
| [16] |
TANG Xi-biao, WANG Ya-fei, WU Xian-zhi, et al. Model test of steel-concrete joint section in hybrid girder cable-stayed bridge[J]. Bridge Construction, 2019, 49(S1): 92-97.
|
| [17] |
ZOU Y, ZHENG K, ZHOU J, et al. Mechanical behavior of perfobond connector group in steel-concrete joint of hybrid bridge[J]. Structures, 2021, 30: 925-936. doi: 10.1016/j.istruc.2021.01.046
|
| [18] |
GU Y, NIE X, LIU Y, et al. Experimental and numerical study of steel-to-concrete joint section in hybrid cable-stayed bridges[J]. Journal of Constructional Steel Research, 2021, 187: 1-14.
|
| [19] |
ZHOU Y, PU Q, SHI Z, et al. Experimental and numerical parametric study of the mechanical properties in a steel-concrete joint section[J]. International Journal of Civil Engineering, 2022, 20(12): 1431-1446. doi: 10.1007/s40999-022-00753-w
|
| [20] |
SHI Zhou, JIA Wen-tao, NING Bo-wei, et al. Mechanical performance of steel-concrete joint section in main girder of long-span high-speed railway cable-stayed bridge[J]. Journal of the China Railway Society, 2023, 45(3): 37-46.
|
| [21] |
ZHAO L, PU G, YUAN Y, et al. Mechanical behaviour of steel-concrete joint in hybrid girder cable-stayed bridge[J]. Structures, 2023, 57: 1-21.
|
| [22] |
YUAN Hui-hui, HUANG Zhen-zhen, WU Qing-xiong, et al. Experiment and analysis of load transfer mechanism of steel-concrete joint section in large-span hybrid continuous box girder bridge[J]. Journal of Hunan University (Natural Sciences), 2023, 50(7): 44-56.
|
| [23] |
CHENG Gao, ZHANG Zhi-heng, XIE Liang, et al. Interfacial load transfer mechanism of concrete-filled steel tube based on field test of truss bridge[J]. Journal of Traffic and Transportation Engineering, 2022, 22(6): 158-168. doi: 10.19818/j.cnki.1671-1637.2022.06.010
|
| [24] |
CHENG Gao, ZHANG Zhi-heng, CHEN Hao, et al. Interfacial load transfer characteristics of rectangular concrete-filled steel tube under non-simultaneous compression[J]. China Journal of Highway and Transport, 2023, 36(2): 179-189.
|
| [25] |
LI Qiao, WU Huan-ling, TANG Liang, et al. Study on the internal force distribution law of steel-concrete combined sections of the Nanjing Yangtze River Third Bridge tower[C]//People's Communications Press. 2005 National Bridge Academic Conference of the China Highway Society Bridge and Structural Engineering Branch. Ningbo: People's Communications Press, 2005: 818-823.
|
| [26] |
XIAO Lin, YE Hua-wen, WEI Xing, et al. Mechanical behavior and load transfer mechanism of steel-concrete joint section in cable-stayed bridge pylon[J]. China Civil Engineering Journal, 2014, 47(3): 88-96.
|
| [27] |
CHEN De-bao, LIN Zhi-ping, SU Qing-tian, et al. Structural optimization and experiment of steel-concrete joint section in hybrid girder rigid-frame bridge[J]. Engineering Mechanics, 2023, 40(8): 149-160.
|
| [28] |
LI Xiao-gang, TONG Gen-shu. Load transfer in concrete-filled steel tubular columns considering slip stiffness[J]. Engineering Mechanics, 2017, 34(11): 89-101.
|
| [29] |
DONG H, CHEN X, CAO W, et al. Bond behavior of high-strength recycled aggregate concrete-filled large square steel tubes with different connectors[J]. Engineering Structures, 2020, 211: 1-13.
|
| [30] |
CHEN Kang-ming, ZHU Jun-xiang, GAO Jia-hao, et al. Review on the mechanical performance of the negative moment zone of steel-concrete continuous composite beam bridges[J/OL]. Journal of Traffic and Transportation Engineering, 2026-08-17.
|
| [31] |
LIU Yong-jian, LIU Jun-ping, CHI Jian-jun. Test of shear bond-slip mechanical behavior at interface of concrete-filled steel tube[J]. Journal of Guangxi University (Natural Science Edition), 2010, 35(1): 17-23.
|
| [32] |
ZHANG Jing-feng, LI Xiao-zhen, XIAO Lin, et al. Numerical simulation analysis of mechanical behavior of steel-concrete joint section in hybrid girder cable-stayed bridge[J]. Journal of Southwest Jiaotong University, 2014(4): 619-625, 699.
|
| [33] |
LI Xiao-zhen, XIAO Lin, HUANG Ling, et al. Static behavior of steel-concrete joint section in hybrid girder cable-stayed bridge[J]. Journal of Harbin Institute of Technology, 2013, 45(6): 75-82.
|
| [34] |
CHEN Fan, YANG Kai, LEI Meng, et al. Influence of steel cell top plate on load transfer mechanism of joint section in cable-stayed bridge[J]. World Bridges, 2021, 49(6): 52-56.
|
| [35] |
HAN Jian-qiu, GU Yi-wei, SHANG Cheng-yu, et al. Influence of steel cell top plate on mechanical performance of joint section in cable-stayed bridge[J]. Bridge Construction, 2020, 50(4): 61-65.
|
| [36] |
SHEN Xin-pu, ZHUANG Zhuo, YOU Xiao-chuan, et al. Finite element analysis and applications based on ABAQUS[M]. Beijing: Tsinghua University Press, 2009: 1-575.
|