Decision-making method of optimal reconstruction time for expressway
-
摘要: 为了提高高速公路的通行能力, 改善高速公路的服务水平, 提出选择高速公路改扩建最佳时机的决策方法。分析了高速公路收费站的交通量统计数据, 利用趋势外推法、多元线性回归法和增长系数法预测出高速公路未来年的交通量, 根据预测交通量计算的服务水平构建出改扩建时机决策的触发点机制。当某年高速公路实际发生交通量与道路设计交通量相等时, 该年为高速公路改扩建的最佳时机。计算结果表明: 2011年西宝高速公路服务水平为1.0, 此年应进行改扩建, 这与西宝高速公路实际改扩建时机吻合, 因此, 改扩建时机决策方法可靠。Abstract: In order to increase expressway capacity and improve expressway service level, a decision-making method of optimal reconstruction time for expressway was proposed. The statistics data of traffic from expressway toll stations were analyzed, and the traffic volumes of future years were predicted by using trend extrapolation method, multinomial regression method and growth factor method. According to the service level of expressway computed with the traffic volumes, the optimal reconstruction time was confirmed when the actual traffic volume equalled to the design traffic volume. Computational result shows that the service level of Xi'an-Baoji expressway is 1.0 in 2011, which is actual optimal reconstruction time, so the decision-making method is reliable.
-
表 1 设计小时交通量系数K30
Table 1. Design hourly traffic volume factor K30
表 2 15 min高峰小时系数f15
Table 2. 15 min peak hour factor f15
表 3 理想条件下的通行能力
Table 3. Traffic capacities under ideal condition
表 4 修正系数ΔVw
Table 4. Revised factor ΔVw
表 5 修正系数ΔVN
Table 5. Revised factor ΔVN
表 6 2004~2008年交通量
Table 6. Traffic flows in 2004~2008
表 7 2009~2013年交通量
Table 7. Traffic flows in 2009~2013
表 8 2009~2013年路段交通量
Table 8. Link traffic flows in 2009~2013
表 9 高速公路服务水平分级
Table 9. Ranks of service levels of expressway
表 10 2009~2013年服务水平
Table 10. Service levels in 2009~2013
-
[1] 谭满春, 徐建闽, 毛宗源. 高速公路交通流的建模与入口匝道最优控制[J]. 中国公路学报, 2000, 13(4): 83-85. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htmTAN Man-chun, XU Jian-min, MAO Zong-yuan. Traffic flow modelling and on-ramp optimal control in freeway[J]. China Journal of Highway and Transport, 2000, 13(4): 83-85. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htm [2] 周刚, 常成利. 高速公路收费站通行能力研究[J]. 公路交通科技, 2001, 18(3): 56-59. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htmZHOU Gang, CHANG Cheng-li. Expressway tollgate capacity study[J]. Journal of Highway and Transportation Research and Development, 2001, 18(3): 56-59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htm [3] 裴玉龙, 程国柱. 基于交通仿真的拓宽交叉口服务通行能力研究[J]. 交通与计算机, 2003, 21(5): 70-73. https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htmPEI Yu-long, CHENG Guo-zhu. Research on service capacity of widened intersection based on traffic simulation[J]. Computer and Communications, 2003, 21(5): 70-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htm [4] 亓会杰. 高速公路改扩建期间施工路段通行能力研究[D]. 西安: 长安大学, 2009.QI Hui-jie. Study on the traffic capacity of the construction section during expressway reconstruction[D]. Xi'an: Chang'an University, 2009. (in Chinese) [5] 王海燕, 项乔君, 陆键, 等. 高速公路出入口OD矩阵推算方法[J]. 公路交通科技, 2005, 22(2): 108-110, 115. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htmWANG Hai-yan, XIANG Qiao-jun, LU Jian, et al. Method of expressway ramp OD matrix calculation[J]. Journal of Highway and Transportation Research and Development, 2005, 22(2): 108-110, 115. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htm [6] 夏阳. 改扩建高速公路交通量预测方法研究[D]. 武汉: 武汉理工大学, 2006.XIA Yang. A study on the traffic volume forecasting methods of reconstruction and extension freeway[D]. Wuhan: Wuhan University of Technology, 2006. (in Chinese) [7] 王剑, 张生瑞, 李华. 基于系统最优的高速公路改扩建交通分流模型[J]. 长安大学学报: 自然科学版, 2008, 28(5): 95-98. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htmWANG Jian, ZHANG Sheng-rui, LI Hua. Traffic divergence model of freeway during reconstruction based on system optimization[J]. Journal of Chang'an University: Natural Science Edition, 2008, 28(5): 95-98. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htm [8] 张剑龙. 高速公路改扩建工程保通方案研究[D]. 长沙: 湖南大学, 2007.ZHANG Jian-long. A study on plan of maintaining traffic moving during freeway reconstruction[D]. Changsha: Hunan University, 2007. (in Chinese) [9] 刘万明. 高速铁路最佳建设时机研究[J]. 数量经济技术经济研究, 2002(8): 29-32. https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htmLIU Wan-ming. Study of the best time of high-speed railway reconstruction[J]. Journal of Quantitative and Technical Economics, 2002(8): 29-32. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htm -