Depot locations for emergency bridging buses in urban rail transit
-
摘要: 为合理设置突发事件下轨道交通应急接驳公交蓄车点, 以接驳起始点为圆心, 以轨道交通运营恢复时间为半径, 构造了接驳需求点反向覆盖应急接驳公交供给点的覆盖结构; 根据接驳公交是否在预定发车时刻前到达接驳点, 提出了接驳需求和乘客等待时间延误的计算方法, 建立了以应急接驳乘客等待时间总延误最小为目标函数的反向集合覆盖选址模型, 并进行求解; 以具体轨道交通应急接驳公交蓄车点选址规划为例, 对比分析了不同预设蓄车点数约束条件下的选址方案。研究结果表明: 每种选址方案下的乘客等待时间总延误均随预设蓄车点数的增加而减少, 当预设蓄车点数为5时, 目标函数达到最小; 蓄车点位置分布受接驳起始点位置和接驳需求量的影响, 当预设蓄车点数为2时, 蓄车点选址结果具有向需求较大的城市中心区域聚拢的倾向, 当预设蓄车点数为5时, 蓄车点选址结果逐渐覆盖郊区; 考虑突发事件影响权重后, 蓄车点位置向突发事件发生频率较高的接驳起始点靠拢, 从而形成了均衡配置在城市中心区域内外部的蓄车点选址布局模式; 反向集合覆盖选址模型通过主动搜寻供给的方式, 能够在最小化应急接驳乘客等待时间总延误的条件下, 体现预设蓄车点数、接驳起始点客流量分布以及突发事件影响权重对应急接驳公交蓄车点选址结果的影响。Abstract: In order to reasonably set up the emergency bridging bus depots for urban rail transit under sudden incident, the bridging starting point was taken as the center of the circle, the operation recovery time of rail transit was taken as the radius, the bridging demand point reversely covered the emergency bridging bus supply point, and a cover structure was constructed. According to whether the bridging bus arrived at the bridging point before the scheduled departure time, the calculation methods of bridging demand and passenger waiting time delay were put forward. The reverse set coverage location model with an objective function of the minimum passenger total waiting time delay was established and solved. Taking a specific depot location for emergency bridging bus in rail transit as an example, the depot location schemes under differentnumbers of preset depots were analyzed and compared. Research result shows that the passenger total waiting time delay decreases with the increase of the number of preset depots. The objective function reaches the minimum when the number of preset depots is five. The depot location distribution is affected by the location of bridging starting point and bridging demand. When the number of preset depots is two, the depot location tends to gather at the center of the city. The depot locations tend to cover the suburb when the number of preset depots is five. After considering the impact of sudden incident weight, the depot location is close to the bridging point with high sudden incident frequency. Then, a balanced bus depot configuration inside and outside the center of the city can be formed. The reverse set coverage location model can minimize the passenger total waiting time delay of emergency bridging bus by active seeking supply, and can reflect the influences of the number of preset depots, passenger flow distribution of bridging starting point and sudden incident weight at the depot location for emergency bridging bus.
-
Key words:
- rail transit /
- emergency bridging bus /
- depot location /
- reverse set cover /
- bridging delay
-
表 1 轨道交通突发事件基础数据
Table 1. Basic data of sudden incidents of urban rail transit
表 2 不同预设蓄车点数下应急接驳公交蓄车点选址与乘客等待时间总延误
Table 2. Depot locations of emergency bridging buses and passenger total waiting time delays with different numbers of preset depots
表 3 考虑突发事件影响权重的应急接驳公交蓄车点选址和乘客等待时间总延误
Table 3. Depot locations of emergency bridging buses and passenger total waiting time delays on consideration of sudden incident weights
-
[1] PENDER B, CURRIE G, DELBOSC A, et al. Proactive recovery from rail disruptions through provision of track crossovers and bus bridging[J]. Transportation Research Record, 2012 (2275): 68-76. [2] 滕靖, 徐瑞华. 城市轨道交通突发事件下公交应急联动策略[J]. 铁道学报, 2010, 32 (5): 13-17. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201005003.htmTENG Jing, XU Rui-hua. Bus dispatching strategies in urban rail emergent events[J]. Journal of the China Railway Society, 2010, 32 (5): 13-17. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201005003.htm [3] CURRIE G, MUIR C. Understanding passenger perceptions and behaviors during unplanned rail disruptions[J]. Transportation Research Procedia, 2017, 25: 4396-4402. [4] 彭文爱. 城市轨道交通运营突发事件客流疏散研究[D]. 南京: 南京理工大学 , 2013.PENG Wen-ai. Passenger evacuation study of railway emergent event[D]. Nanjing: Nanjing University of Science and Technology, 2013. (in Chinese). [5] KEPAPTSOGLOU K, KARLAFTTIS M G. The bus bridging problem in metro operations: conceptual framework, models and algorithms[J]. Public Transport, 2009, 1 (4): 275-297. doi: 10.1007/s12469-010-0017-6 [6] KEPAPTSOGLOU K, KARLAFTTIS M G, BITSIKAS T. Bus-to-depot allocation: models and decision support system[J]. Journal of Transportation Engineering, 2009, 136 (7): 600-605. [7] JIN J G, TEO K M, SUN L. Disruption response planning for an urban mass rapid transit network[C]∥TRB. The Transportation Research Board 92th Annual Meeting. Washington DC: TRB, 2013: 1-17. [8] JIN J G, TEO K M, ODONI A R. Optimizing bus bridging services in response to disruptions of urban transit rail networks[J]. Transportation Science, 2015, 50 (3): 790-804. [9] HU Hua, GAO Yun-feng, YU Jie, et al. Planning bus bridging evacuation during rail transit operation disruption[J]. Journal of Urban Planning and Development, 2016, 142 (4): 04016015-1-9. doi: 10.1061/(ASCE)UP.1943-5444.0000335 [10] YANG Jing-feng, JIN Jian-gang, WU Jian-jun, et al. Optimizing passenger flow control and bus-bridging service for commuting metro lines[J]. Computer-Aided Civil and Infrastructure Engineering, 2017, 32 (6): 458-473. doi: 10.1111/mice.12265 [11] GU W, YU J, JI Y X, et al. Plan-based flexible bus bridging operation strategy[J]. Transportation Research Part C: Emerging Technologies, 2018, 91: 209-229. doi: 10.1016/j.trc.2018.03.015 [12] SUN Jian-hui, HU Hua, LIU Zhi-gang. A bus bridging optimization model for single point operational disruption of urban rail transit[J]. Advances in Natural and Applied Sciences, 2017, 11 (4): 388-394. [13] YANG Y, DING H X, CHEN F, et al. An approach for evaluating connectivity of interrupted rail networks with bus bridging services[J]. Advances in Mechanical Engineering, 2018, 10 (3): 1-12. [14] PENDER B, CURRIE G, SHIWAKOTI, et al. New methods and perspectives in bus bridging theory and practice[C]∥TRB. The Transportation Research Board 96th Annual Meeting. Washington DC: TRB, 2017: 1-19. [15] PENDER B, GRAHAM C, ALEXA D, et al. Impact of bus depot location on the provision of rail replacement services[C]∥ATRF. Proceedings of 2013Australasian Transport Research Forum. Brisbane: ATRF, 2013: 1-10. [16] BARBAROS C T, RICHARD L F, TIMOTHY J L. Location on networks: a survey. PartⅠ: the p-center and p-median problems[J]. Management Science, 1983, 29 (4): 482-497. doi: 10.1287/mnsc.29.4.482 [17] OWEN H S, DASKIN M S. Strategic facility location: a review[J]. European Journal of Operational Research, 1988, 111 (3): 423-447. [18] HALE T S, MOBERG C R. Location science research: a review[J]. Annals of Operations Research, 2003, 123 (1-4): 21-35. [19] RE VELLA C S, EISELT H A. Location analysis: a synthesis and survey[J]. European Journal of Operational Research, 2005, 165 (1): 1-19. doi: 10.1016/j.ejor.2003.11.032 [20] 杨丰梅, 华国伟, 邓猛, 等. 选址问题研究的若干进展[J]. 运筹与管理, 2005, 14 (6): 1-7. https://www.cnki.com.cn/Article/CJFDTOTAL-YCGL200506000.htmYANG Feng-mei, HUA Guo-wei, DENG Meng, et al. Some advances of the researches on location problems[J]. Operations Research and Management Science, 2005, 14 (6): 1-7. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-YCGL200506000.htm [21] 王非, 徐渝, 李毅学. 离散设施选址问题研究综述[J]. 运筹与管理, 2006, 15 (5): 64-69. https://www.cnki.com.cn/Article/CJFDTOTAL-YCGL200605012.htmWANG Fei, XU Yu, LI Yi-xue. Review on facility location models[J]. Operations Research and Management Science, 2006, 15 (5): 64-69. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-YCGL200605012.htm [22] 乔联宝. 覆盖类选址问题分类及研究综述[J]. 物流科技, 2015 (3): 59-66. https://www.cnki.com.cn/Article/CJFDTOTAL-LTKJ201503021.htmQIAO Lian-bao. Classification and review on the covering facility location problem[J]. Logistics Sci-Tech, 2015 (3): 59-66. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-LTKJ201503021.htm [23] PIRKUL H, SCHILLING D. The capacitated maximal covering location problem with backup service[J]. Annals of Operations Research, 1989, 18 (1): 141-154. doi: 10.1007/BF02097800 [24] PIRKUL H, SCHILLING D A. The maximal covering location problem with capacities on total workload[J]. Management Science, 1991, 37 (2): 233-248. doi: 10.1287/mnsc.37.2.233 [25] HOGAN K, RE VELLE C. Concepts and applications of backup coverage[J]. Management Science, 1986, 32 (11): 1434-1444. doi: 10.1287/mnsc.32.11.1434 [26] CURRENT J, O'KELLY M. Locating emergency warning sirens[J]. Decision Sciences, 1992, 23 (1): 221-234. doi: 10.1111/j.1540-5915.1992.tb00385.x [27] BALL M O, LIN F L. A reliability model applied to emergency service vehicle location[J]. Operations Research, 1993, 41 (1): 18-36. doi: 10.1287/opre.41.1.18 [28] SORENSEN P, CHURCH R. Integrating expected coverage and local reliability for emergency medical services location problems[J]. Socio-Economic Planning Sciences, 2010, 44 (1): 8-18. doi: 10.1016/j.seps.2009.04.002 -