-
摘要: 利用有限元法研究了扁平钢箱梁在集中荷载和均布荷栽作用下的剪力滞效应。结合扁平钢箱梁设计参数的合理取值范围, 分析了截面宽度和高度、顶板和底板厚度、纵隔板与横隔板的厚度和间距等参数对剪力滞效应的影响。根据理论分析结果, 应用回归分析法提出了扁平钢箱梁剪力滞系数的实用计算公式, 并将计算结果与有限元分析结果进行对比分析。分析结果表明: 跨宽比对剪力滞系数影响最显著, 当跨宽比由1.786增大至8.926时, 顶板与底板处的最大剪力滞系数分别由1.40、1.32减小为1.07、1.06, 减少约20%;当纵隔板厚度由10 mm增大至30 mm时, 剪力滞系数在边腹板处减小约7%, 而在其他位置变化小于1%;纵隔板间距与梁宽比由0.430增大至0.582时, 剪力滞系数增大约9%;其他参数变化对剪力滞系数的影响均可忽略。实用计算公式的计算结果与有限元分析结果的相对误差小于1%, 说明公式计算精度较高, 满足工程计算要求。Abstract: The shear lag effects of flat steel box girder under concentrated and uniform loads were studied by using finite element method.Considering the reasonable ranges of design parameters of flat steel box girder, the influences of some parameters including the width and height of cross section, the thicknesses of top and bottom slabs, the thicknesses and spacings of longitudinal and transverse diaphragms on shear lag effects were analyzed.Based on the result of theoretical analysis, the practical formula was proposed to calculate the shear lag coefficient of flat steel box girder by using mathematical regression analysis, and the calculation result of practical formula was compared with the result of finite element method.Analysis result indicates that span-width ratio has the most significant influence on shear lag effects, when the span-width ratio increases from 1.786 to 8.926, the shear lag coefficients of top and bottom slabs decrease from 1.40 and1.32 to 1.07 and 1.06, and decrease by about 20%.When the thickness of longitudinal diaphragm increases from 10 mm to 30 mm, the shear lag coefficient of side web decrease by 7%, while the coefficients at other positions change by less than 1%.When the ratio of longitudinal diaphragm spacing to girder width increases from 0.430 to 0.582, the shear lag coefficient increases by 9%.Other parameters have negligible effect on shear lag coefficient.The relative error between the results of proposed practical formula and finite element method is less than1%, which conforms the formula has higher calculation precision, and meets the need of engineering calculation.
-
表 1 桥梁信息
Table 1. Bridge informations
表 2 跨宽比影响系数
Table 2. Influence coefficients of span-width ratios
表 3 纵隔板间距与梁宽比影响系数
Table 3. Influence coefficients of ratios of longitudinal diaphragm spacing to girder width
表 4 纵隔板厚度影响系数
Table 4. Influence coefficients of longitudinal diaphragm thicknesses
-
[1] REISSNER E. Analysis of shear lag in box beams by the principle of minimum potential energy[J]. Quarterly of Applied Mathematics, 1946, 4(3): 268-278. doi: 10.1090/qam/17176 [2] MOFFATT K R, DOWLING P J. Shear lag in steel box girder bridges[J]. Structural Engineering, 1975, 53(10): 439-448. [3] LERTSIMA C, CHAISOMPHOB T, YAMAGUCHI E. Stress concentration due to shear lag in simply supported box girders[J]. Engineering Structures, 2004, 26(8): 1093-1101. doi: 10.1016/j.engstruct.2004.03.010 [4] LIN Zhi-bin, ZHAO Jian. Revisit of AASHTO effective flange-width provisions for box girders[J]. Journal of Bridge Engineering, 2011, 16(6): 881-889. doi: 10.1061/(ASCE)BE.1943-5592.0000194 [5] 郭秉山, 何玮, 闫月梅. 薄壁钢箱梁考虑加劲肋构造剪力滞效应的计算[J]. 西安科技大学学报, 2012, 32(5): 617-621. doi: 10.3969/j.issn.1672-9315.2012.05.015GUO Bing-shan, HE Wei, YAN Yue-mei. Calculation of shear lag effect on thin-walled box girder by considering arrangement of stiffening rib[J]. Journal of Xi'an University of Science and Technology, 2012, 32(5): 617-621. (in Chinese). doi: 10.3969/j.issn.1672-9315.2012.05.015 [6] 欧阳永金. 大宽跨比连续钢箱梁桥的剪力滞效应研究[J]. 世界桥梁, 2009(1): 29-32. https://www.cnki.com.cn/Article/CJFDTOTAL-GWQL200901010.htmOUYANG Yong-jin. Investigation of shear lag effect of continuous steel box girder bridge with great width-to-span ratio[J]. World Bridges, 2009(1): 29-32. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GWQL200901010.htm [7] ZHANG Hui, DESROCHES R, YANG Zi-jiang, et al. Experimental and analytical studies on a streamlined steel box girder[J]. Journal of Constructional Steel Research, 2010, 66(7): 906-914. doi: 10.1016/j.jcsr.2010.02.001 [8] 谢芬, 许红胜, 颜东煌, 等. 斜拉桥悬臂施工阶段分离式钢箱梁的剪力滞效应分析[J]. 长沙理工大学学报: 自然科学版, 2012, 9(2): 31-38. doi: 10.3969/j.issn.1672-9331.2012.02.006XIE Fen, XU Hong-sheng, YAN Dong-huang, et al. The shear lag effect research of separated steel box girder in cantilever construction stage of cable-stayed bridge[J]. Journal of Changsha University of Science and Technology: Natural Science, 2012, 9(2), 31-38. (in Chinese). doi: 10.3969/j.issn.1672-9331.2012.02.006 [9] 李元兵, 张启伟, 季云峰. 千米级斜拉桥结构静力行为试验研究[J]. 同济大学学报: 自然科学版, 2011, 39(4): 495-500, 523. doi: 10.3969/j.issn.0253-374x.2011.04.005LI Yuan-bing, ZHANG Qi-wei, JI Yun-feng. Mechanical behavior of kilometer-level cable-stayed bridge under static loads[J]. Journal of Tongji University: Natural Science, 2011, 39(4): 495-500, 523. (in Chinese). doi: 10.3969/j.issn.0253-374x.2011.04.005 [10] 沈锐利, 齐东春, 唐茂林. 杭州江东大桥静力特性全桥模型试验研究[J]. 土木工程学报, 2011, 44(1): 74-80. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC201101014.htmSHEN Rui-li, QI Dong-chun, TANG Mao-lin. Model test study of the static property of the Jiangdong Bridge in Hangzhou[J]. China Civil Engineering Journal, 2011, 44(1): 74-80. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC201101014.htm [11] 赵煜, 刘波. 大曲率连续钢箱梁桥剪力滞试验与分析[J]. 西安科技大学学报, 2006, 26(3): 311-316. doi: 10.3969/j.issn.1672-9315.2006.03.006ZHAO Yu, LIU Bo. Test and analysis of shear lag for continuous steel bridge with large curvature[J]. Journal of Xi'an University of Science and Technology, 2006, 26(3): 311-316. (in Chinese). doi: 10.3969/j.issn.1672-9315.2006.03.006 [12] 张磊, 郑宝成, 成丕富. 双反弯曲线钢箱连续梁桥剪力滞效应研究[J]. 公路工程, 2013, 38(4): 124-127, 132. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL201304030.htmZHANG Lei, ZHENG Bao-cheng, CHENG Pi-fu. Research of shear lag effect in reverse bending curved steel box continuous girder bridge[J]. Highway Engineering, 2013, 38(4): 124-127, 132. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL201304030.htm [13] 吴亚平, 赖远明, 王步云. 薄壁钢箱梁的极限强度及有效宽比分析[J]. 铁道学报, 1999, 21(3): 77-80. doi: 10.3321/j.issn:1001-8360.1999.03.017WU Ya-ping, LAI Yuan-ming, WANG Bu-yun. Strength and valid width ratio analysis of thin-walled steel box beam in limit state[J]. Journal of the China Railway Society, 1999, 21(3): 77-80. (in Chinese). doi: 10.3321/j.issn:1001-8360.1999.03.017 [14] 赵煜, 侯俊明. 钢结构箱形梁桥结构尺寸优化分析[J]. 西安公路交通大学学报, 2001, 21(2): 53-56. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200102017.htmZHAO Yu, HOU Jun-ming. The optimum analysis in designing a steel box beam[J]. Journal of Xi'an Highway University, 2001, 21(2): 53-56. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200102017.htm [15] LIU Xiao-gang, FAN Jian-sheng, NIEJian-guo, et al. Behavior of composite rigid frame bridge under bi-directional seismic excitations[J]. Journal of Traffic and Transportation Engineering: English Edition, 2014, 1(1): 62-71. doi: 10.1016/S2095-7564(15)30090-8 [16] 张太科, 周小蓉. 大跨度桥梁钢箱梁设计要素简述[J]. 中外公路. 2005, 25(4): 139-141.ZHANG Tai-ke, ZHOU Xiao-rong. Brief review on key elements of steel box girder design for long span bridges[J]. Journal of China and Foreign Highway, 2005, 25(4): 139-141. (in Chinese). [17] 彭大文, 王忠. 连续弯箱梁剪滞效应分析和实用计算法研究[J]. 中国公路学报, 1998, 11(3): 41-49. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL803.005.htmPENG Da-wen, WANG Zhong. Analysis of the shear lag effect in continuous curved box girder bridges and the research on practical calculating method[J]. China Journal of Highway and Transport, 1998, 11(3): 41-49. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL803.005.htm [18] 乔朋. 斜拉桥扁平钢箱主梁的剪力滞效应研究[D]. 西安: 长安大学, 2009.QIAO Peng. Study on shear lag effect in flat steel box girder of a cable-stayed bridge[D]. Xi'an: Chang'an University, 2009. (in Chinese).