Multi-level fuzzy comprehensive evaluation method of lead performance for high-speed railway
-
摘要: 提出了高铁引线绩效评价的指标体系, 构造了多层次模糊综合评价模型。对模糊因素进行了量化, 对指标权值进行了合理分配, 建立了指标的隶属度函数与模糊关系矩阵, 并对判断矩阵进行了一致性检验, 运用最大隶属度有效原则进行项目有效性评价。评价结果表明: 方案A的综合评价值最大, 为11.214, 表明方案A最优, 符合实际, 因此, 评价模型可靠。Abstract: The evaluation index system of lead performance for high-speed railway was put forward, and a multi-level fuzzy comprehensive evaluation model was established.In the model, the fuzzy factors were quantized, the index weights were rationally distributed, and the fuzzy relationship matrices and membership functions of the indexes were set up.The consistency of comparison matrix was checked, and the validity of the lead project was evaluated by using the effective principle of maximum membership degree.Evaluation result shows that the comprehensive evaluation value of the lead scheme A is 11.214, is maximum, which accords with actual decision-making project, so the lead scheme A is better, and the model is credible.
-
表 1 1~9标度的含义
Table 1. Meanings of scale 1-9
表 2 一级判断矩阵
Table 2. First grade judgment matrix
表 3 指标B1的判断矩阵
Table 3. Judyment matrix of index B1
表 4 指标B2的判断矩阵
Table 4. Judgment matrix of index B2
表 5 指标B3的判断矩阵
Table 5. Judgment matrix of index B3
表 6 指标B4的判断矩阵
Table 6. Judgment matrix of index B4
表 7 规划方案
Table 7. Planning schemes
-
[1] 包国宪, 董静. 政府绩效评价在西方的实践及启示[J]. 兰州大学学报: 社会科学版, 2006, 34(5): 20-26. doi: 10.3969/j.issn.1000-2804.2006.05.007BAO Guo-xian, DONG Jing. Assessment of government competency: practice in the West and its significance for China[J]. Journal of Lanzhou University: Social Sciences, 2006, 34(5): 20-26. (in Chinese) doi: 10.3969/j.issn.1000-2804.2006.05.007 [2] 冯鸿雁. 财政支出绩效评价体系构建及其应用研究[D]. 天津: 天津大学, 2004.FENG Hong-yan. Research on construction and application of the performance assessment system of fiscal expenditure[D]. Tianjin: Tianjin University, 2004. (in Chinese) [3] 熊崇俊, 宁宣熙, 潘颖莉. 中国综合交通各运输方式协调发展评价研究[J]. 系统工程, 2006, 24(6): 1-7. https://www.cnki.com.cn/Article/CJFDTOTAL-GCXT200606000.htmXIONG Chong-jun, NING Xuan-xi, PAN Ying-li. Evaluation of coordinated development between Chinese comprehensive transportation modes[J]. Systems Engineering, 2006, 24(6): 1-7. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GCXT200606000.htm [4] 梁国华. 公路建设项目社会效益分析与评价[D]. 西安: 长安大学, 2003.LIANG Guo-hua. The analysis and evaluation of highway project social benefit[D]. Xian'an: Chang'an University, 2003. (in Chinese) [5] 张淼. 我国风险投资的决策方法研究[D]. 长春: 吉林大学, 2008.ZHANG Miao. Research on decision-making approach of China's venture capital[D]. Changchun: Jilin University, 2008. (in Chinese) [6] 郭文明, 相景丽, 肖凯生. 群组AHP权重系数的确定[J]. 华北工学院学报, 2000, 21(2): 110-113. https://www.cnki.com.cn/Article/CJFDTOTAL-HBGG200002004.htmGUO Wen-ming, XIANG Jing-li, XIAO Kai-sheng. Determination of weight coefficients in group AHP[J]. Journal of North China Institute of Technology, 2000, 21(2): 110-113. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HBGG200002004.htm [7] 刘进生, 李书钢. 群体判断矩阵的建立及权重计算[J]. 太原工业大学学报, 1995, 26(1): 91-94. https://www.cnki.com.cn/Article/CJFDTOTAL-TYGY501.016.htmLIU Jin-sheng, LI Shu-gang. The construction of group judgment matrices and the calculation of weights[J]. Journal of Taiyuan University of Technology, 1995, 26(1): 91-94. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TYGY501.016.htm [8] 沈毅, 吴丽娜, 王红瑞, 等. 环境影响后评价的进展及主要问题[J]. 长安大学学报: 自然科学版, 2005, 25(1): 56-59. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200501014.htmSHEN Yi, WU Li-na, WANG Hong-rui, et al. Post-projectanalysis in environmental impact: development and main problems[J]. Journal of Chang'an University: Natural Science Edition, 2005, 25(1): 56-59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200501014.htm [9] 叶耀军, 王首军, 魏磊, 等. 矩阵最大特征值的近似求法[J]. 河南农业大学学报, 2001, 35(增1): 69-71. https://www.cnki.com.cn/Article/CJFDTOTAL-NNXB2001S1022.htmYE Yao-jun, WANG Shou-jun, WEI Lei, et al. Approximate computation on the maximum eigenvalue of matrix[J]. Journal of Henan Agricultural University, 2001, 35(Z1): 69-71. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-NNXB2001S1022.htm [10] 毛介英. 大型铁路客运站综合交通衔接规划研究[D]. 成都: 西南交通大学, 2010.MAO Jie-ying. Research on comprehensive transport connecting planning of large scale passengers railway station[D]. Chengdu: Southwest Jiaotong University, 2010. (in Chinese) [11] 张建平. 在综合运输系统中建设中国铁路[J]. 交通运输系统工程与信息, 2006, 6(1): 15-18, 21. https://www.cnki.com.cn/Article/CJFDTOTAL-YSXT200601006.htmZHANG Jian-ping. Building China railway in comprehensive transportation system[J]. Journal of Transportation Systems Engineering and Information Technology, 2006, 6(1): 15-18, 21. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSXT200601006.htm [12] 赵春昶, 陶丽, 潘瑞. 模糊综合评价在管理决策中的应用[J]. 沈阳建筑工程学院学报: 自然科学版, 2001, 17(4): 318-320. https://www.cnki.com.cn/Article/CJFDTOTAL-SYJZ200104023.htmZHAO Chun-chang, TAO Li, PAN Rui. Application of fuzzy synthetic evaluation on polity decision[J]. Journal of Shenyang Architecture and Civil Engineering Insititute: Natural Science, 2001, 17(4): 318-320. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SYJZ200104023.htm [13] 陈耀辉, 孙春燕. 模糊综合评判法中的最大隶属原则有效度[J]. 重庆师范学院学报: 自然科学版, 2001, 18(1): 45-47. https://www.cnki.com.cn/Article/CJFDTOTAL-CQSF200101011.htmCHEN Yao-hui, SUN Chun-yan. A study of the validity of the maximum subordination principle for the fuzzy comprehensive evaluation method[J]. Journal of Chongqing Normal University: Natural Science Edition, 2001, 18(1): 45-47. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CQSF200101011.htm