Management-control capability evaluation model of radio block center based on improved ANP
-
摘要: 分析了影响无线闭塞中心(RBC)管控能力的多种因素, 研究了不同因素间的关系, 应用网络层次分析法(ANP)建立了RBC管控能力评价模型。为了降低评价中人为主观性影响与提高评价结果的可信性, 在ANP评价过程引入了专家均值置信法, 建立了ANP评价模型。以京沪高铁和郑西高铁下行区段第1个RBC(RBC-JH1、RBC-ZX1)的实际布置为例, 使用SD软件求解模型, 获得了RBC管控能力影响因素的定量排序。研究结果表明: 管辖范围、控制车站数、非周期数据处理、注册受控列车数量、单个RBC最大控车容量、周期数据处理、车站复杂度、无线信道传输延时的权重分别为0.167、0.095、0.092、0.090、0.086、0.072、0.064、0.058, 它们对RBC管控能力的影响较大, 在实际RBC布置中, 需要优先考虑这些因素; 得到了RBC-JH1的权重为0.037, RBC-ZX1的权重为0.039, 结合需要优先考虑的因素, 建议RBC-JH1的管辖范围可以扩展至中继站6。改进ANP评价模型对无线闭塞中心管控能力评价的适用性较好, 结合已有的RBC布置数量计算公式, 可确定一条线路RBC管控范围和布置数量。Abstract: Various factors affecting the management-control capability of radio block center(RBC)were analyzed.The relationship among the factors was researched.The evaluation model of management and control capability of RBC was built by analytic network process(ANP).In order to reduce the influence of subjectivity and improve the credibility of evaluation results, the experts mean assessment was introduced to ANP evaluation process.Taking the real layouts of the first RBCs(RBC-JH1, RBC-ZX1)in the down direction of Jinghu and Zhengxi High-Speed Railways as example, the ANP evaluation model was built, and SD software was used to solve the model.The quantitative ordering of various influence factors was obtained.Analysis result indicates that the covered line area, control station number, non-cycle data dealing, the number of registered control trains, the maximum control train number of a single RBC, cycle data dealing, station complexity and the transmission delay time of wireless channel are key influence factors, their weights are 0.167, 0.095, 0.092, 0.090, 0.086, 0.072, 0.064 and 0.058, respectively.In the real RBC layout, the key influence factors should be given the priority because they have larger influence on the control capability of RBC.The weight of RBC-JH1is0.037, and the weight of RBC-ZX1 is 0.039.Considering the priority influence factors, the jurisdiction of BC-JH1 can be extended to the sixth relay station.The applicability of improved ANP evaluation model is proved in evaluating the RBC management and control capability.Combination with the calculation formula of RBC layout number, the management-control range and layout number of RBC in a railway line can be determined.
-
表 1 两因素权重比较
Table 1. Comparison of weights between two factors
表 2 RBCs布置
Table 2. Layout of RBCs
表 3 RBC维护适应性
Table 3. Maintenance adaptabilities of RBCs
表 4 影响因素的关系
Table 4. Relationship of influence factors
表 5 未加权超矩阵
Table 5. Unweighted super matrix
表 6 簇组权重
Table 6. Weights of clusters
表 7 加权超矩阵
Table 7. Weighted super matrix
表 8 极限加权超矩阵
Table 8. Limit weighted super matrix
表 9 京沪高铁基础线路数据
Table 9. Basic line data of Jinghu High-Speed Railway
-
[1] 沈志凌. 高速铁路CTCS-3列控系统无线闭塞中心设备数量计算原则和方法的研究[J]. 铁道标准设计, 2009(增1): 136-137, 150. https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS2009S1044.htmSHEN Zhi-ling. Research on the principle and method of radio block center number of high-speed railway CTCS-3 train control system[J]. Railway Standard Design, 2009(S1): 136-137, 150. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS2009S1044.htm [2] 石先明. 高速铁路CTCS-3级列控系统无线闭塞中心工程设计[J]. 中国铁路, 2009(11): 1-6. https://www.cnki.com.cn/Article/CJFDTOTAL-TLZG200911002.htmSHI Xian-ming. Engineering design of radio block center in CTCS-3 train control system for high-speed railway[J]. Chinese Railways, 2009(11): 1-6. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TLZG200911002.htm [3] 赵宇坤. CTCS-3级列控系统RBC设置及容量计算方法研究[D]. 兰州: 兰州交通大学, 2011.ZHAO Yu-kun. Research of calculation method for RBC setting and capacity in CTCS-3[D]. Lanzhou: Lanzhou Jiaotong University, 2011. (in Chinese) [4] 任伟, 熊鹰, 张树龙. 基于网络分析法的舰舰导弹性能评估方法研究[J]. 舰船电子工程, 2012, 32(10): 26-28. https://www.cnki.com.cn/Article/CJFDTOTAL-JCGC201210009.htmREN Wei, XIONG Ying, ZHANG Shu-long. An approach to performance evaluation of surface to surface missile based on analytic network process[J]. Ship Electronic Engineering, 2012, 32(10): 26-28. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JCGC201210009.htm [5] 石福丽, 方志刚, 杨峰, 等. 基于仿真的潜艇装备作战能力ANP幂指数评估方法[J]. 国防科技大学学报, 2011, 33(4): 168-174. https://www.cnki.com.cn/Article/CJFDTOTAL-GFKJ201104033.htmSHI Fu-li, FANG Zhi-gang, YANG Feng, et al. ANP power index evaluation method for operational capability of submarine equipment based on simulation[J]. Journal of National University of Defense Technology, 2011, 33(4): 168-174. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GFKJ201104033.htm [6] 王海涌, 张玮玥, 王晓明, 等. 基于ANP和VPRS的高速列车舒适性综合评价指标权重分析[J]. 铁道学报, 2014, 36(6): 15-20. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201406005.htmWANG Hai-yong, ZHANG Wei-yue, WANG Xiao-ming, et al. ANP and VPRS based analysis on index weight for comprehensive evaluation of comfort of high-speed train[J]. Journal of the China Railway Society, 2014, 36(6): 15-20. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201406005.htm [7] 李金超, 李金颖, 牛东晓, 等. 基于ANP的电网企业运营能力评价模型研究[J]. 电力系统保护与控制, 2011, 39(19): 37-43. https://www.cnki.com.cn/Article/CJFDTOTAL-JDQW201119010.htmLI Jin-chao, LI Jin-ying, NIU Dong-xiao, et al. Study on the evaluation model for the power grid corporation operation ability based on ANP[J]. Power System Protection and Control, 2011, 39(19): 37-43. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JDQW201119010.htm [8] 赵高强, 郭森, 李泓泽, 等. 基于ANP-GCDM模型的风电项目经济外部性评价[J]. 华北电力大学学报, 2012, 39(4): 59-64, 71. https://www.cnki.com.cn/Article/CJFDTOTAL-HBDL201204013.htmZHAO Gao-qiang, GUO Sen, LI Hong-ze, et al. Evaluation on economic externality of wind power project based on ANP-GCDM[J]. Journal of North China Electric Power University, 2012, 39(4): 59-64, 71. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HBDL201204013.htm [9] 王效俐, 张默. 物流服务供应链突发事件合作补救能力评价模型[J]. 同济大学学报: 自然科学版, 2014, 42(1): 159-166. https://www.cnki.com.cn/Article/CJFDTOTAL-TJDZ201401026.htmWANG Xiao-li, ZHANG Mo. Cooperation recovery capability evaluation model of logistics service supply chain in emergency[J]. Journal of Tongji University: Natural Science, 2014, 42(1): 159-166. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TJDZ201401026.htm [10] 陈志祥. 基于ANP理论的供需协调绩效评价模型与算法[J]. 计算机集成制造系统, 2004, 10(3): 286-291. https://www.cnki.com.cn/Article/CJFDTOTAL-JSJJ200403008.htmCHEN Zhi-xiang. Model and algorithms of supply and demand coordination performance measurement based on ANP theory[J]. Computer Integrated Manufacturing Systems, 2004, 10(3): 286-291. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSJJ200403008.htm [11] SAATY T L. Fundamentals of the analytic network process-dependence and feedback in decision-making with a single network[J]. Journal of Systems Science and Systems Engineering, 2004, 13(2): 129-157. [12] 田小革, 林杜, 吴孙德. 基于模糊复合物元法的水泥路面性能评价[J]. 交通运输工程学报, 2010, 10(2): 26-29, 35. http://transport.chd.edu.cn/article/id/201002005TIAN Xiao-ge, LIN Du, WU Sun-de. Performance evaluation of Portland cement concrete pavement based on fuzzy complex matter element method[J]. Journal of Traffic and Transportation Engineering, 2010, 10(2): 26-29, 35. (in Chinese) http://transport.chd.edu.cn/article/id/201002005 [13] WANG Ying-ming, LIU Jun, ELHAG T M S. An intergrated AHP-DEA methodology for bridge risk assessment[J]. Computers and Industrial Engineering, 2008, 54(3): 513-525. [14] 武荣桢, 翟栋栋, 郗恩崇, 等. 城市公共交通服务满意度评价模型[J]. 交通运输工程学报, 2009, 9(4): 65-70. http://transport.chd.edu.cn/article/id/200904013WU Rong-zhen, ZHAI Dong-dong, XI En-chong, et al. Evaluation model of satisfaction degree for urban public transit service[J]. Journal of Traffic and Transportation Engineering, 2009, 9(4): 65-70. (in Chinese) http://transport.chd.edu.cn/article/id/200904013 [15] UYAN M. MSW landfill site selection by combining AHP with GIS for Konya, Turkey[J]. Environmental Earth Sciences, 2014, 71(4): 1629-1639. [16] BARTON R R, NELSON B L, XIE Wei. Quantifying input uncertainty via simulation confidence intervals[J]. INFORMS Journal on Computing, 2014, 26(1): 74-87. [17] 陈建球, 唐涛. 基于改进FAHP方法的列车运行控制系统仿真可信度研究[J]. 铁道学报, 2014, 36(3): 59-66. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201403012.htmCHEN Jian-qiu, TANG Tao. Research on simulation credibility of train operation control system based on improved FAHP method[J]. Journal of the China Railway Society, 2014, 36(3): 59-66. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201403012.htm [18] 苟晨曦, 蔡伯根, 唐涛, 等. 无线闭塞中心测试案例生成方法[J]. 交通运输工程学报, 2011, 11(4): 114-122. http://transport.chd.edu.cn/article/id/201104018GOU Chen-xi, CAI Bai-gen, TANG Tao, et al. Test case generation method of radio block center[J]. Journal of Traffic and Transportation Engineering, 2011, 11(4): 114-122. (in Chinese) http://transport.chd.edu.cn/article/id/201104018 [19] 吕继东, 唐涛, 贾昊. 客运专线CTCS-3级列控系统无线闭塞中心的建模与验证[J]. 铁道学报, 2010, 32(6): 34-42. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201006009.htmLU Ji-dong, TANG Tao, JIA Hao. Modeling and verification of radio block center of CTCS-3 train control system for dedicated passengers lines[J]. Journal of the China Railway Society, 2010, 32(6): 34-42. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201006009.htm [20] 牛儒, 曹源, 唐涛. ETCS-2级列控系统RBC交接协议的形式化分析[J]. 铁道学报, 2009, 31(4): 52-58. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB200904012.htmNIU Ru, CAO Yuan, TANG Tao. Formal modelling and analysis of RBC handover protocol for ETCS level 2 using stochastic Petri nets[J]. Journal of the China Railway Society, 2009, 31(4): 52-58. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB200904012.htm [21] 马小玲, 张友鹏, 杜求茂, 等. 计算机联锁系统的可靠性和安全性比较[J]. 铁路计算机应用, 2009, 18(6): 46-49. https://www.cnki.com.cn/Article/CJFDTOTAL-TLJS200906015.htmMA Xiao-ling, ZHANG You-peng, DU Qiu-mao, et al. Comparing of reliability and security with computer-based interlocking system multiplying model[J]. Railway Computer Application, 2009, 18(6): 46-49. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TLJS200906015.htm [22] 梁楠, 王海峰. 基于SPN的CTCS-3级列控系统RBC实时性能分析[J]. 铁道学报, 2011, 33(2): 67-71. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201102017.htmLIANG Nan, WANG Hai-feng. Real-time performance analysis of RBC system for CTCS lever 3 using stochastic Petri networks[J]. Journal of the China Railway Society, 2011, 33(2): 67-71. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201102017.htm