WANG Yao-hui, MA Rong-guo. Fuzzy evaluation of BT financing risk for infrastructure building[J]. Journal of Traffic and Transportation Engineering, 2009, 9(3): 103-107. doi: 10.19818/j.cnki.1671-1637.2009.03.020
Citation: WANG Yao-hui, MA Rong-guo. Fuzzy evaluation of BT financing risk for infrastructure building[J]. Journal of Traffic and Transportation Engineering, 2009, 9(3): 103-107. doi: 10.19818/j.cnki.1671-1637.2009.03.020

Fuzzy evaluation of BT financing risk for infrastructure building

doi: 10.19818/j.cnki.1671-1637.2009.03.020
More Information
  • Author Bio:

    WANG Yao-hui(1972-), male, senior economist, doctoral student, +86-10-51891068, xtgcwyh@yahoo.com.cn

    MA Rong-guo(1955-), male, professor, +86-29-82334615, mrg@chd.edu.cn

  • Received Date: 2009-02-12
  • Publish Date: 2009-06-25
  • The characteristics and classification of BT financing risks for infrastructure building were analyzed.A evaluation index system and a fuzzy-compositive evaluation model were set up.A method was put forward to confirm membership function.The BT project risk of Bigui Road and Ronggui Underground Road in Foshan City was evaluated by using the evaluation method.Evaluation result shows that the maximal membership degree of the project is 0.712 7, its risk belongs to the comment of the minimum risk, the test coefficient of validity principle for maximal membership degree is 2.728, which is more than 1, so the evaluation method is feasible.

     

  • loading
  • [1]
    LAMP TI. Asectoral reviewof risks associated with majorinfrastructure projects[J]. International Journal of ProjectManagement, 1999, 17(2): 77-87.
    [2]
    GRI MSEY D, LEWIS M K. Evaluating the risks of publicprivate partnerships for infrastucture projects[J]. InternationalJournal of Project Management, 2002, 20(2): 107-118.
    [3]
    周江华. 采用BT模式进行项目运作相关问题的探讨[J]. 铁道工程学报, 2005(4): 73-77. https://www.cnki.com.cn/Article/CJFDTOTAL-TDGC200504022.htm

    ZHOUJiang-hua. Exploration on issue of operating projectby adopting BT model[J]. Journal of Rail way EngineeringSociety, 2005(4): 73-77. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDGC200504022.htm
    [4]
    何寿奎. 基础设施项目BT模式投资建设招标管理探讨[J]. 建筑经济, 2005(4): 68-70. https://www.cnki.com.cn/Article/CJFDTOTAL-JZJJ200504017.htm

    HE Shou-kui. Discussion of BT mode for infrostructure investand its invite bid management[J]. Construction Economy, 2005(4): 68-70. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JZJJ200504017.htm
    [5]
    周磊, 周正康. 市政项目的BT融资风险的防范与控制研究[J]. 现代管理科学, 2004(9): 108-109. https://www.cnki.com.cn/Article/CJFDTOTAL-XDGL200409046.htm

    ZHOU Lei, ZHOU Zheng-kang. Study on risk preventionand control of BT financing mode for public works[J]. Modern Management Science, 2004(9): 108-109. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XDGL200409046.htm
    [6]
    张淼. 我国风险投资的决策方法研究[D]. 长春: 吉林大学, 2008.

    ZHANG Miao. Study on decision method of risk invest inChina[D]. Changchun: Jilin University, 2008. (in Chinese)
    [7]
    郭文明, 相景丽, 肖凯生. 群组AHP权重系数的确定[J]. 华北工学院学报, 2000, 21(2): 110-113. https://www.cnki.com.cn/Article/CJFDTOTAL-HBGG200002004.htm

    GUO Wen-ming, XI ANGJing-li, XI AO Kai-sheng. Determi-nation of weight coefficients in group AHP[J]. Journal ofNorth China Institute of Technology, 2000, 21(2): 110-113. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HBGG200002004.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (390) PDF downloads(257) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return