WANG Jian-qiang, YANG Yun-feng, XI Jiang-peng, XI En-chong. Decision-making method of optimal reconstruction time for expressway[J]. Journal of Traffic and Transportation Engineering, 2010, 10(1): 106-111. doi: 10.19818/j.cnki.1671-1637.2010.01.019
Citation: WANG Jian-qiang, YANG Yun-feng, XI Jiang-peng, XI En-chong. Decision-making method of optimal reconstruction time for expressway[J]. Journal of Traffic and Transportation Engineering, 2010, 10(1): 106-111. doi: 10.19818/j.cnki.1671-1637.2010.01.019

Decision-making method of optimal reconstruction time for expressway

doi: 10.19818/j.cnki.1671-1637.2010.01.019
More Information
  • Author Bio:

    WANG Jian-qiang(1966-), male, senior engineer, doctoral student, + 86-29- 87833001, jqiangw@126.com

    XI En-chong(1946-), male, professor, + 86-29-82336196, xiench@chd.edu.cn

  • Received Date: 2009-11-13
  • Publish Date: 2010-02-25
  • In order to increase expressway capacity and improve expressway service level, a decision-making method of optimal reconstruction time for expressway was proposed. The statistics data of traffic from expressway toll stations were analyzed, and the traffic volumes of future years were predicted by using trend extrapolation method, multinomial regression method and growth factor method. According to the service level of expressway computed with the traffic volumes, the optimal reconstruction time was confirmed when the actual traffic volume equalled to the design traffic volume. Computational result shows that the service level of Xi'an-Baoji expressway is 1.0 in 2011, which is actual optimal reconstruction time, so the decision-making method is reliable.

     

  • loading
  • [1]
    谭满春, 徐建闽, 毛宗源. 高速公路交通流的建模与入口匝道最优控制[J]. 中国公路学报, 2000, 13(4): 83-85. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htm

    TAN Man-chun, XU Jian-min, MAO Zong-yuan. Traffic flow modelling and on-ramp optimal control in freeway[J]. China Journal of Highway and Transport, 2000, 13(4): 83-85. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htm
    [2]
    周刚, 常成利. 高速公路收费站通行能力研究[J]. 公路交通科技, 2001, 18(3): 56-59. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htm

    ZHOU Gang, CHANG Cheng-li. Expressway tollgate capacity study[J]. Journal of Highway and Transportation Research and Development, 2001, 18(3): 56-59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htm
    [3]
    裴玉龙, 程国柱. 基于交通仿真的拓宽交叉口服务通行能力研究[J]. 交通与计算机, 2003, 21(5): 70-73. https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htm

    PEI Yu-long, CHENG Guo-zhu. Research on service capacity of widened intersection based on traffic simulation[J]. Computer and Communications, 2003, 21(5): 70-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htm
    [4]
    亓会杰. 高速公路改扩建期间施工路段通行能力研究[D]. 西安: 长安大学, 2009.

    QI Hui-jie. Study on the traffic capacity of the construction section during expressway reconstruction[D]. Xi'an: Chang'an University, 2009. (in Chinese)
    [5]
    王海燕, 项乔君, 陆键, 等. 高速公路出入口OD矩阵推算方法[J]. 公路交通科技, 2005, 22(2): 108-110, 115. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htm

    WANG Hai-yan, XIANG Qiao-jun, LU Jian, et al. Method of expressway ramp OD matrix calculation[J]. Journal of Highway and Transportation Research and Development, 2005, 22(2): 108-110, 115. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htm
    [6]
    夏阳. 改扩建高速公路交通量预测方法研究[D]. 武汉: 武汉理工大学, 2006.

    XIA Yang. A study on the traffic volume forecasting methods of reconstruction and extension freeway[D]. Wuhan: Wuhan University of Technology, 2006. (in Chinese)
    [7]
    王剑, 张生瑞, 李华. 基于系统最优的高速公路改扩建交通分流模型[J]. 长安大学学报: 自然科学版, 2008, 28(5): 95-98. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htm

    WANG Jian, ZHANG Sheng-rui, LI Hua. Traffic divergence model of freeway during reconstruction based on system optimization[J]. Journal of Chang'an University: Natural Science Edition, 2008, 28(5): 95-98. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htm
    [8]
    张剑龙. 高速公路改扩建工程保通方案研究[D]. 长沙: 湖南大学, 2007.

    ZHANG Jian-long. A study on plan of maintaining traffic moving during freeway reconstruction[D]. Changsha: Hunan University, 2007. (in Chinese)
    [9]
    刘万明. 高速铁路最佳建设时机研究[J]. 数量经济技术经济研究, 2002(8): 29-32. https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htm

    LIU Wan-ming. Study of the best time of high-speed railway reconstruction[J]. Journal of Quantitative and Technical Economics, 2002(8): 29-32. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (903) PDF downloads(759) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return