Citation: | WANG Jian-qiang, YANG Yun-feng, XI Jiang-peng, XI En-chong. Decision-making method of optimal reconstruction time for expressway[J]. Journal of Traffic and Transportation Engineering, 2010, 10(1): 106-111. doi: 10.19818/j.cnki.1671-1637.2010.01.019 |
[1] |
谭满春, 徐建闽, 毛宗源. 高速公路交通流的建模与入口匝道最优控制[J]. 中国公路学报, 2000, 13(4): 83-85. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htm
TAN Man-chun, XU Jian-min, MAO Zong-yuan. Traffic flow modelling and on-ramp optimal control in freeway[J]. China Journal of Highway and Transport, 2000, 13(4): 83-85. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200004018.htm
|
[2] |
周刚, 常成利. 高速公路收费站通行能力研究[J]. 公路交通科技, 2001, 18(3): 56-59. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htm
ZHOU Gang, CHANG Cheng-li. Expressway tollgate capacity study[J]. Journal of Highway and Transportation Research and Development, 2001, 18(3): 56-59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK202111013.htm
|
[3] |
裴玉龙, 程国柱. 基于交通仿真的拓宽交叉口服务通行能力研究[J]. 交通与计算机, 2003, 21(5): 70-73. https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htm
PEI Yu-long, CHENG Guo-zhu. Research on service capacity of widened intersection based on traffic simulation[J]. Computer and Communications, 2003, 21(5): 70-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200305020.htm
|
[4] |
亓会杰. 高速公路改扩建期间施工路段通行能力研究[D]. 西安: 长安大学, 2009.
QI Hui-jie. Study on the traffic capacity of the construction section during expressway reconstruction[D]. Xi'an: Chang'an University, 2009. (in Chinese)
|
[5] |
王海燕, 项乔君, 陆键, 等. 高速公路出入口OD矩阵推算方法[J]. 公路交通科技, 2005, 22(2): 108-110, 115. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htm
WANG Hai-yan, XIANG Qiao-jun, LU Jian, et al. Method of expressway ramp OD matrix calculation[J]. Journal of Highway and Transportation Research and Development, 2005, 22(2): 108-110, 115. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200502029.htm
|
[6] |
夏阳. 改扩建高速公路交通量预测方法研究[D]. 武汉: 武汉理工大学, 2006.
XIA Yang. A study on the traffic volume forecasting methods of reconstruction and extension freeway[D]. Wuhan: Wuhan University of Technology, 2006. (in Chinese)
|
[7] |
王剑, 张生瑞, 李华. 基于系统最优的高速公路改扩建交通分流模型[J]. 长安大学学报: 自然科学版, 2008, 28(5): 95-98. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htm
WANG Jian, ZHANG Sheng-rui, LI Hua. Traffic divergence model of freeway during reconstruction based on system optimization[J]. Journal of Chang'an University: Natural Science Edition, 2008, 28(5): 95-98. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200805023.htm
|
[8] |
张剑龙. 高速公路改扩建工程保通方案研究[D]. 长沙: 湖南大学, 2007.
ZHANG Jian-long. A study on plan of maintaining traffic moving during freeway reconstruction[D]. Changsha: Hunan University, 2007. (in Chinese)
|
[9] |
刘万明. 高速铁路最佳建设时机研究[J]. 数量经济技术经济研究, 2002(8): 29-32. https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htm
LIU Wan-ming. Study of the best time of high-speed railway reconstruction[J]. Journal of Quantitative and Technical Economics, 2002(8): 29-32. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SLJY200208007.htm
|