HAN Wan-shui, WANG Tao, LI Yong-qing, LI Yan-wei, HUANG Ping-ming. Practical updating method of finite element model for long-span steel truss suspension bridge[J]. Journal of Traffic and Transportation Engineering, 2011, 11(5): 18-27. doi: 10.19818/j.cnki.1671-1637.2011.05.004
Citation: HAN Wan-shui, WANG Tao, LI Yong-qing, LI Yan-wei, HUANG Ping-ming. Practical updating method of finite element model for long-span steel truss suspension bridge[J]. Journal of Traffic and Transportation Engineering, 2011, 11(5): 18-27. doi: 10.19818/j.cnki.1671-1637.2011.05.004

Practical updating method of finite element model for long-span steel truss suspension bridge

doi: 10.19818/j.cnki.1671-1637.2011.05.004
More Information
  • Author Bio:

    HAN Wan-shui (1977-), male, associate professor, PhD, +86-29-82336336, hws-freedom@163.com

  • Received Date: 2011-07-12
  • Publish Date: 2011-10-25
  • Based on the engineering background of the super long-span steel truss suspension bridge over Sidu River Deep-Cutting Gorge on Hu-Rong National Highway, the influences of suspension bridge structural nonlinear and gravity stiffness were comprehensively considered, an updating programme of bridge model was developed by using APDL of ANSYS, and the synchronous calculation on finite element analysis and model updating was realized.The influence degrees of different optimization algorithms, different objective functions and different constraint conditions on model updating effects were compared, the influences of measured suspender forces and expansion joint rigidity parameters were analyzed, and a practical updating method, which could fully reflect the structural properties of suspension bridge, was proposed.In the method, the frequency residual was taken as objective function, the frequency, modal parameters and other static information were taken as constraint conditions, and the zero order optimization was carried out.Calculation result shows that the deviations between the computed and measured responses of structural static and dynamic forces for the updating model decrease significantly, the static deformation errors are controlled within 8%, the frequency errors are controlled within 5%, the parameter variations of the model are reasonable, the physical meanings of the parameters are ensured, so the benchmark finite element model of super large bridge over Sidu River is obtained and feasible.

     

  • loading
  • [1]
    刘健新, 李加武. 中国西部地区桥梁风工程研究[J]. 建筑科学与工程学报, 2005, 22 (4): 32-39. doi: 10.3321/j.issn:1673-2049.2005.04.007

    LI UJian-xin, LI Jia-wu. Study of wind project of bridge inwestern area of China[J]. Journal of Architecture and Civil Engineering, 2005, 22 (4): 32-39. (in Chinese) doi: 10.3321/j.issn:1673-2049.2005.04.007
    [2]
    李兆霞, 李爱群, 陈鸿天, 等. 大跨桥梁结构以健康监测和状态评估为目标的有限元模拟[J]. 东南大学学报: 自然科学版, 2003, 33 (5): 562-572. doi: 10.3321/j.issn:1001-0505.2003.05.007

    LI Zhao-xia, LI Ai-qun, CHEN Hong-tian, et al. Finite element modeling for health monitoring and condition assessment of long-span bridges[J]. Journal of Southeast University: Natural Science Edition, 2003, 33 (5): 562-572. (in Chinese) doi: 10.3321/j.issn:1001-0505.2003.05.007
    [3]
    宗周红, 夏樟华. 联合模态柔度和静力位移的桥梁有限元模型修正方法[J]. 中国公路学报, 2008, 21 (6): 43-49. doi: 10.3321/j.issn:1001-7372.2008.06.008

    ZONG Zhou-hong, XIA Zhang-hua. Finite element model updating method of bridge combined modal flexibility and static displacement[J]. China Journal of Highway and Transport, 2008, 21 (6): 43-49. (in Chinese) doi: 10.3321/j.issn:1001-7372.2008.06.008
    [4]
    任伟新, 陈华斌. 基于响应面的桥梁有限元模型修正[J]. 土木工程学报, 2008, 41 (12): 73-78. doi: 10.3321/j.issn:1000-131X.2008.12.012

    REN Wei-xin, CHEN Hua-bin. Response-surface based onfinite element model updating of bridge structures[J]. ChinaCivil Engineering Journal, 2008, 41 (12): 73-78. (in Chinese) doi: 10.3321/j.issn:1000-131X.2008.12.012
    [5]
    JAISHI B, REN Wei-xin. Structural finite element model updating using ambient vibration test results[J]. Journal of Structural Engineering, 2005, 131 (4): 617-628. doi: 10.1061/(ASCE)0733-9445(2005)131:4(617)
    [6]
    ESTES A C, ASCE M, FRANGOPOL D M, et al. Updating bridge reliability based on bridge management systems visualin spection results[J]. Journal of Bridge Engineering, 2003, 8 (6): 374-382. doi: 10.1061/(ASCE)1084-0702(2003)8:6(374)
    [7]
    BROWNJOHNJ M W, MOYO P, DMENZETTER P, et al. Assessment of highway bridge upgrading by dynamic testing and finite-element model updating[J]. Journal of Bridge Engineering, 2003, 8 (3): 162-172. doi: 10.1061/(ASCE)1084-0702(2003)8:3(162)
    [8]
    BROWNJOHNJ M W, XI A Pin-qi. Dynamic assessment ofcurved cable-stayed bridge by model updating[J]. Journal of Structural Engineering, 2000, 126 (2): 252-260. doi: 10.1061/(ASCE)0733-9445(2000)126:2(252)
    [9]
    ZHANG Q W, CHANG T Y P, CHANG C C. Finite-elementmodel updating for the Kap Shui Mun Cable-Stayed Bridge[J]. Journal of Bridge Engineering, 2001, 6 (4): 285-293.
    [10]
    姚昌荣, 李亚东. 基于静动力测试数据的斜拉桥模型修正[J]. 铁道学报, 2008, 30 (3): 65-70. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB200803014.htm

    YAO Chang-rong, LI Ya-dong. Updating of cable-stayed bridges model based on static and dynamictest data[J]. Journal of the China Railway Society, 2008, 30 (3): 65-70. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB200803014.htm
    [11]
    郭彤, 李爱群, 费庆国, 等. 零阶与一阶优化算法在悬索桥模型修正中的应用对比分析[J]. 振动与冲击, 2007, 26 (4): 35-38, 68, 167-168. https://www.cnki.com.cn/Article/CJFDTOTAL-ZDCJ200704008.htm

    GUO Tong, LI Ai-qun, FEI Qing-guo, et al. Application comparison between zero-order and first-order optimization methods in model updating of suspension bridges[J]. Journal of Vibration and Shock, 2007, 26 (4): 35-38, 68, 167-168. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZDCJ200704008.htm
    [12]
    李枝军, 李爱群, 韩晓林. 润扬大桥悬索桥动力特性分析与实测变异性研究[J]. 土木工程学报, 2010, 43 (4): 92-98. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC201004017.htm

    LI Zhi-jun, LI Ai-qun, HAN Xiao-lin. Dynamic analysis and experimental study of variations of the dynamic parameters of the Runyang Suspension Bridge[J]. China Civil Engineering Journal, 2010, 43 (4): 92-98. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC201004017.htm
    [13]
    李永庆. 基于静动力有限元模型修正的梁格法车桥耦合振动程序开发及试验验证[D]. 西安: 长安大学, 2010.

    LI Yong-qing. Programdevelopment and experi mental validation of vehicle-bridge coupling vibration with grillage method based on static and dynamic finite element model updating[D]. Xian: Changan University, 2010. (in Chinese)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (615) PDF downloads(385) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return