Citation: | LU Kai, ZHENG Shu-jian, XU Jian-min, LI Lin. Green wave coordinated control optimization models oriented to different bidirectional bandwidth demands[J]. Journal of Traffic and Transportation Engineering, 2011, 11(5): 101-108. doi: 10.19818/j.cnki.1671-1637.2011.05.016 |
[1] |
MORGANJ T, LITTLEJ D C. Synchronizing traffic signals for maxi mal bandwidth[J]. Operations Research, 1964, 12(6): 896-912. doi: 10.1287/opre.12.6.896
|
[2] |
LITTLE J D C. The synchronization of traffic signals by mixed-integer linear programming[J]. Operations Research, 1966, 14(4): 568-594. doi: 10.1287/opre.14.4.568
|
[3] |
LITTLE J D C, KELSON M D, GARTNER N H. MAX-BAND: a versatile program for setting signals on arteries and triangular networks[R]. Cambridge: Massachusetts Institute of Technology, 1981.
|
[4] |
MESSER CJ, WHITSONR H, DUDEKC L, et al. A variable-sequence multiphase progression optimization program[J]. High-way Research Record, 1973(445): 24-33.
|
[5] |
CHANG E C P, MESSER C J. Arterial signal timing optimization using passer Ⅱ-90-program user's manual[R]. Austin: Texas A & M University System, 1991.
|
[6] |
CHAUDHARY N A, MESSER C J. Passer Ⅳ-96, version 2.1, user/reference manual[R]. Austin: Texas A & M University System, 1996.
|
[7] |
GARTNER N H, ASSMANN S F, LASAGA F, et al. MULTIBAND—a variable-bandwidth arterial progression scheme[J]. Transportation Research Record, 1990(1287): 212-222.
|
[8] |
GARTNER N H, ASSMANN S F, LASAGA F, et al. AMULTIBAND approachto arterial traffic signal optimization[J]. Transportation Research Part B: Methodological, 1991, 25(1): 55-74. doi: 10.1016/0191-2615(91)90013-9
|
[9] |
STAMATI ADIS C, GARTNER N H. MULTIBAND-96: aprogram for variable-bandwidth progression optimization of multiarterial traffic networks[J]. Transportation Research Record, 1996(1554): 9-17.
|
[10] |
GARTNER N H, STAMATI ADIS C. Arterial-based control of traffic flow in urban grid networks[J]. Mathematical and Computer Modelling, 2002, 35(5): 657-671.
|
[11] |
卢凯, 徐建闽, 叶瑞敏. 经典干道协调控制信号配时数解算法的改进[J]. 公路交通科技, 2009, 26(1): 120-124, 129. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200901023.htm
LU Kai, XU Jian-min, YE Rui-min. Improvement of classical algebraic method of signal timing for arterial road coordinate control[J]. Journal of Highway and Transportation Research and Development, 2009, 26(1): 120-124, 129. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200901023.htm
|
[12] |
LU Shou-feng, LI U Xi-min, DAI Shi-qiang. Revised MAX-BAND model for bandwidth optimization of traffic flow dispersion[C]∥IEEE. 2008 ISECS International Colloquiumon Computing, Communication, Control, and Management. Guangzhou: IEEE, 2008: 85-89.
|
[13] |
王殿海, 李凤, 宋现敏. 干线协调控制中公共周期优化方法研究[J]. 交通信息与安全, 2009, 27(5): 10-13, 23. https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200905004.htm
WANG Dian-hai, LI Feng, SONG Xian-min. Public cycleoptimal method at arterial signal progression[J]. Journal of Transport Information and Safety, 2009, 27(5): 10-13, 23. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JTJS200905004.htm
|
[14] |
陈宁宁, 何兆成, 余志. 考虑动态红灯排队消散时间的改进MAXBAND模型[J]. 武汉理工大学学报: 交通科学与工程版, 2009, 33(5): 843-847. doi: 10.3963/j.issn.1006-2823.2009.05.008
CHEN Ning-ning, HE Zhao-cheng, YU Zhi. Revised MAX-BAND model considered variable queue clearance time[J]. Journal of Wuhan University of Technology: Transportation Science & Engineering, 2009, 33(5): 843-847. (in Chinese) doi: 10.3963/j.issn.1006-2823.2009.05.008
|
[15] |
卢凯, 徐建闽, 李轶舜. 进口单独放行方式下的干道双向绿波协调控制数解算法[J]. 中国公路学报, 2010, 23(3): 95-101. doi: 10.3969/j.issn.1001-7372.2010.03.015
LU Kai, XU Jian-min, LI Yi-shun. Algebraic method of arterial road coordinate control for bidirectional green wave under signal design mode of one-phase-one-approach[J]. China Journal of Highway and Transport, 2010, 23(3): 95-101. (in Chinese) doi: 10.3969/j.issn.1001-7372.2010.03.015
|
[16] |
卢凯, 徐建闽, 陈思溢, 等. 通用干道双向绿波协调控制模型及其优化求解[J]. 控制理论与应用, 2011, 28(4): 551-555. https://www.cnki.com.cn/Article/CJFDTOTAL-KZLY201104018.htm
LU Kai, XUJian-min, CHEN Si-yi, et al. A general modelof bidirectional green wave for coordinate control of arterial road and its opti mization solution[J]. Control Theory & Applications, 2011, 28(4): 551-555. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-KZLY201104018.htm
|