REN Wen-feng, WANG Xing-hua, TU Peng. Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method[J]. Journal of Traffic and Transportation Engineering, 2012, 12(5): 28-36. doi: 10.19818/j.cnki.1671-1637.2012.05.004
Citation: REN Wen-feng, WANG Xing-hua, TU Peng. Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method[J]. Journal of Traffic and Transportation Engineering, 2012, 12(5): 28-36. doi: 10.19818/j.cnki.1671-1637.2012.05.004

Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method

doi: 10.19818/j.cnki.1671-1637.2012.05.004
More Information
  • Author Bio:

    REN Wen-feng(1976-), male, senior engineer, doctoral student, +86-731-82565715, wenfeng_ren@hotmail.com

    WANG Xing-hua(1957-), male, professor, PhD, +86-731-82655489, xhwang@mail.csu.edu.cn

  • Received Date: 2012-05-06

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (1168) PDF downloads(1049) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return