PAN Deng, MEI Meng, ZHENG Ying-ping. Laws of high-speed train operation speed acting on line capacity[J]. Journal of Traffic and Transportation Engineering, 2015, 15(6): 68-74. doi: 10.19818/j.cnki.1671-1637.2015.06.009
Citation: PAN Deng, MEI Meng, ZHENG Ying-ping. Laws of high-speed train operation speed acting on line capacity[J]. Journal of Traffic and Transportation Engineering, 2015, 15(6): 68-74. doi: 10.19818/j.cnki.1671-1637.2015.06.009

Laws of high-speed train operation speed acting on line capacity

doi: 10.19818/j.cnki.1671-1637.2015.06.009
More Information
  • Author Bio:

    PAN Deng(1969-), male, associate professor, PhD, +86-21-69589241, pandengreal@sina.com

  • Received Date: 2015-07-10
  • Publish Date: 2015-06-25
  • The mathematical models of quasi-moving block system and moving block system were used to calculate total vehicle distance, train interval time and line capacity. When brake accelerations were -0.63, -0.75, -0.85 and-0.90 m·s-2 respectively, the simulation experiments were carried out to analyze the laws of high-speed train operation speed acting on line capacity.Analysis result shows that safe headway is proportional to initial speed when train decreases speed to stop.Train interval time and line capacity are closely related to safe headway, train operation speed and initial parameter values.The minimum of train interval time and the maximum of line capacity exist accordingly.The smaller braking acceleration is, the smaller train interval is, and the greater line capacity is.Train interval time can be controlled in 3 min, and line capacity can reach over 1 000 trains a day.Train interval time of quasi-moving block system is longer than that of moving block system, and its line capacity is less than that of moving block system.Considering the feasibility of engineering application makes the line capacity gap between quasi-moving block system and moving block system to further expand.

     

  • loading
  • [1]
    赵春雷. 双线自动闭塞区段提高通过能力和旅客列车速度的研究[J]. 铁道学报, 1997, 19(1): 13-19. doi: 10.3321/j.issn:1001-8360.1997.01.003

    ZHAO Chun-lei. A study on raising carrying capacity and passenger train speed on double-track automatic block line[J]. Journal of the China Railway Society, 1997, 19(1): 13-19. (in Chinese). doi: 10.3321/j.issn:1001-8360.1997.01.003
    [2]
    田长海, 赵丽珍, 何邦模, 等. 既有繁忙干线列车提速运输组织的研究[J]. 中国铁道科学, 1998, 19(4): 1-10.

    TIAN Chang-hai, ZHAO Li-zhen, HE Bang-mo, et al. Research on transportation organization in the case of raising train speed on existing busy lines[J]. China Railway Science, 1998, 19(4): 1-10. (in Chinese).
    [3]
    张济民, 吴汶麒, 张树京. 准移动闭塞列车安全间隔时间的计算[J]. 铁道学报, 1999, 21(3): 6-10. doi: 10.3321/j.issn:1001-8360.1999.03.002

    ZHANG Ji-min, WU Wen-qi, ZHANG Shu-jing. Calculation of time interval between two trains in moving-block signal system[J]. Journal of the China Railway Society, 1999, 21(3): 6-10. (in Chinese). doi: 10.3321/j.issn:1001-8360.1999.03.002
    [4]
    汤奇志, 朱家荷, 赵春雷, 等. 既有线提速200km·h-1的线路区间通过能力分析[J]. 中国铁道科学, 2005, 26(5): 123-127. doi: 10.3321/j.issn:1001-4632.2005.05.025

    TANG Qi-zhi, ZHU Jia-he, ZHAO Chun-lei, et al. Analysis and computation of the carrying capacity in the section of existing line speed increase to 200 km·h-1[J]. China Railway Science, 2005, 26(5): 123-127. (in Chinese). doi: 10.3321/j.issn:1001-4632.2005.05.025
    [5]
    罗丽云, 吴汶麒. 城市轨道交通移动闭塞列车安全间隔时间分析[J]. 中国铁道科学, 2005, 26(1): 119-123. doi: 10.3321/j.issn:1001-4632.2005.01.022

    LUO Li-yun, WU Wen-qi. Analysis on the safety time interval of train with movable block system in urban rail transit[J]. China Railway Science, 2005, 26(1): 119-123. (in Chinese). doi: 10.3321/j.issn:1001-4632.2005.01.022
    [6]
    苏顺虎, 田长海, 陈治亚. 客运专线通过能力的分析计算[J]. 中国铁道科学, 2008, 29(5): 119-124.

    SU Shun-hu, TIAN Chang-hai, CHEN Zhi-ya. Analysis and calculation of the carrying capacity on passenger dedicated lines[J]. China Railway Science, 2008, 29(5): 119-124. (in Chinese).
    [7]
    王俊峰. 客运专线不同列车控制系统共线对通过能力的影响[J]. 北京交通大学学报, 2010, 34(6): 1-4. doi: 10.3969/j.issn.1673-0291.2010.06.001

    WANG Jun-feng. Traffic ability impact analysis about different train control system on the same passenger dedicated line[J]. Journal of Beijing Jiaotong University, 2010, 34(6): 1-4. (in Chinese). doi: 10.3969/j.issn.1673-0291.2010.06.001
    [8]
    张岳松, 田长海, 姜昕良, 等. 高速铁路列车间隔时间的计算方法[J]. 中国铁道科学, 2013, 34(5): 120-125. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201305020.htm

    ZHANG Yue-song, TIAN Chang-hai, JIANG Xin-liang, et al. Calculation method for train headway of high speed railway[J]. China Railway Science, 2013, 34(5): 120-125. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201305020.htm
    [9]
    PEARSON L V. Moving block railway signalling[D]. Loughborough: Loughborough University, 1973.
    [10]
    ABRIL M, BARBER F, INGOLOTTI L, et al. An assessment of railway capacity[J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(5): 774-806. doi: 10.1016/j.tre.2007.04.001
    [11]
    RAMUNAS V, GAILIENE I, PODAGELIS I. Increment of railway line capacity[C]∥Vilnius Gediminas Technical University Publishing House. 8th International Conference on Environmental Engineering. Vilnius: Vilnius Gediminas Technical University Publishing House, 2011: 1193-1199.
    [12]
    HUNYADI B. Capacity evaluation for ERTMS level 2operation on HS2[R]. Berlin: Bombardier Transportation, 2011.
    [13]
    GONZALEZ J, RODRIGUEZ C, BLANGNER J, et al. Increase of metro line capacity by optimisation of track circuit length and location: in a distance to go system[J]. Journal of Advanced Transportation, 2010, 44(2): 53-71. doi: 10.1002/atr.109
    [14]
    LAI Y C, WANG S H. Development of analytical capacity models for conventional railways with advanced signaling systems[J]. Journal of Transportation Engineering, 2012, 138(7): 961-974.
    [15]
    MUSSONE L, CALVO R W. An analytical approach to calculate the capacity of a railway system[J]. European Journal of Operational Research, 2013, 228(1): 11-23.
    [16]
    GOVERDE R M P, CORMAN F, D'ARIANO A. Railway line capacity consumption of different railway signalling systems under scheduled and disturbed conditions[J]. Journal of Rail Transport Planning and Management, 2013, 3(3): 78-94.
    [17]
    汤波, 雷定猷, 张英贵, 等. 铁路车站咽喉通过能力计算方法[J]. 交通运输工程学报, 2010, 10(6): 69-74. http://transport.chd.edu.cn/article/id/201006012

    TANG Bo, LEI Ding-you, ZHANG Ying-gui, et al. Calculating method of carrying capacity for railway station bottleneck[J]. Journal of Traffic and Transportation Engineering, 2010, 10(6): 69-74. (in Chinese). http://transport.chd.edu.cn/article/id/201006012
    [18]
    潘登, 郑应平. 基于安全车距实时标定的列车间隔动态控制[J]. 交通运输工程学报, 2014, 14(1): 112-118. http://transport.chd.edu.cn/article/id/201401015

    PAN Deng, ZHENG Ying-ping. Dynamic control of train interval based on real-time calibration of safe headway[J]. Journal of Traffic and Transportation Engineering, 2014, 14(1): 112-118. (in Chinese). http://transport.chd.edu.cn/article/id/201401015
    [19]
    潘登, 梅萌, 郑应平. 高速列车跟驰运行控制策略与安全车距的互动演化[J]. 交通运输工程学报, 2014, 14(5): 90-100. http://transport.chd.edu.cn/article/id/201405012

    PAN Deng, MEI Meng, ZHENG Ying-ping. Interactive evolution between safe headway and control strategy of highspeed trains during following operation[J]. Journal of Traffic and Transportation Engineering, 2014, 14(5): 90-100. (in Chinese). http://transport.chd.edu.cn/article/id/201405012
    [20]
    彭其渊, 文超, 闫海峰. 提速战略对我国铁路运输发展的带动作用[J]. 西南交通大学学报, 2008, 43(6): 685-691.

    PENG Qi-yuan, WEN Chao, YAN Hai-feng. Driving effects of speed increase on development of railway transportation in China[J]. Journal of Southwest Jiaotong University, 2008, 43(6): 685-691. (in Chinese).
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (723) PDF downloads(569) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return