Citation: | PAN Deng, MEI Meng, ZHENG Ying-ping. Laws of high-speed train operation speed acting on line capacity[J]. Journal of Traffic and Transportation Engineering, 2015, 15(6): 68-74. doi: 10.19818/j.cnki.1671-1637.2015.06.009 |
[1] |
赵春雷. 双线自动闭塞区段提高通过能力和旅客列车速度的研究[J]. 铁道学报, 1997, 19(1): 13-19. doi: 10.3321/j.issn:1001-8360.1997.01.003
ZHAO Chun-lei. A study on raising carrying capacity and passenger train speed on double-track automatic block line[J]. Journal of the China Railway Society, 1997, 19(1): 13-19. (in Chinese). doi: 10.3321/j.issn:1001-8360.1997.01.003
|
[2] |
田长海, 赵丽珍, 何邦模, 等. 既有繁忙干线列车提速运输组织的研究[J]. 中国铁道科学, 1998, 19(4): 1-10.
TIAN Chang-hai, ZHAO Li-zhen, HE Bang-mo, et al. Research on transportation organization in the case of raising train speed on existing busy lines[J]. China Railway Science, 1998, 19(4): 1-10. (in Chinese).
|
[3] |
张济民, 吴汶麒, 张树京. 准移动闭塞列车安全间隔时间的计算[J]. 铁道学报, 1999, 21(3): 6-10. doi: 10.3321/j.issn:1001-8360.1999.03.002
ZHANG Ji-min, WU Wen-qi, ZHANG Shu-jing. Calculation of time interval between two trains in moving-block signal system[J]. Journal of the China Railway Society, 1999, 21(3): 6-10. (in Chinese). doi: 10.3321/j.issn:1001-8360.1999.03.002
|
[4] |
汤奇志, 朱家荷, 赵春雷, 等. 既有线提速200km·h-1的线路区间通过能力分析[J]. 中国铁道科学, 2005, 26(5): 123-127. doi: 10.3321/j.issn:1001-4632.2005.05.025
TANG Qi-zhi, ZHU Jia-he, ZHAO Chun-lei, et al. Analysis and computation of the carrying capacity in the section of existing line speed increase to 200 km·h-1[J]. China Railway Science, 2005, 26(5): 123-127. (in Chinese). doi: 10.3321/j.issn:1001-4632.2005.05.025
|
[5] |
罗丽云, 吴汶麒. 城市轨道交通移动闭塞列车安全间隔时间分析[J]. 中国铁道科学, 2005, 26(1): 119-123. doi: 10.3321/j.issn:1001-4632.2005.01.022
LUO Li-yun, WU Wen-qi. Analysis on the safety time interval of train with movable block system in urban rail transit[J]. China Railway Science, 2005, 26(1): 119-123. (in Chinese). doi: 10.3321/j.issn:1001-4632.2005.01.022
|
[6] |
苏顺虎, 田长海, 陈治亚. 客运专线通过能力的分析计算[J]. 中国铁道科学, 2008, 29(5): 119-124.
SU Shun-hu, TIAN Chang-hai, CHEN Zhi-ya. Analysis and calculation of the carrying capacity on passenger dedicated lines[J]. China Railway Science, 2008, 29(5): 119-124. (in Chinese).
|
[7] |
王俊峰. 客运专线不同列车控制系统共线对通过能力的影响[J]. 北京交通大学学报, 2010, 34(6): 1-4. doi: 10.3969/j.issn.1673-0291.2010.06.001
WANG Jun-feng. Traffic ability impact analysis about different train control system on the same passenger dedicated line[J]. Journal of Beijing Jiaotong University, 2010, 34(6): 1-4. (in Chinese). doi: 10.3969/j.issn.1673-0291.2010.06.001
|
[8] |
张岳松, 田长海, 姜昕良, 等. 高速铁路列车间隔时间的计算方法[J]. 中国铁道科学, 2013, 34(5): 120-125. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201305020.htm
ZHANG Yue-song, TIAN Chang-hai, JIANG Xin-liang, et al. Calculation method for train headway of high speed railway[J]. China Railway Science, 2013, 34(5): 120-125. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201305020.htm
|
[9] |
PEARSON L V. Moving block railway signalling[D]. Loughborough: Loughborough University, 1973.
|
[10] |
ABRIL M, BARBER F, INGOLOTTI L, et al. An assessment of railway capacity[J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(5): 774-806. doi: 10.1016/j.tre.2007.04.001
|
[11] |
RAMUNAS V, GAILIENE I, PODAGELIS I. Increment of railway line capacity[C]∥Vilnius Gediminas Technical University Publishing House. 8th International Conference on Environmental Engineering. Vilnius: Vilnius Gediminas Technical University Publishing House, 2011: 1193-1199.
|
[12] |
HUNYADI B. Capacity evaluation for ERTMS level 2operation on HS2[R]. Berlin: Bombardier Transportation, 2011.
|
[13] |
GONZALEZ J, RODRIGUEZ C, BLANGNER J, et al. Increase of metro line capacity by optimisation of track circuit length and location: in a distance to go system[J]. Journal of Advanced Transportation, 2010, 44(2): 53-71. doi: 10.1002/atr.109
|
[14] |
LAI Y C, WANG S H. Development of analytical capacity models for conventional railways with advanced signaling systems[J]. Journal of Transportation Engineering, 2012, 138(7): 961-974.
|
[15] |
MUSSONE L, CALVO R W. An analytical approach to calculate the capacity of a railway system[J]. European Journal of Operational Research, 2013, 228(1): 11-23.
|
[16] |
GOVERDE R M P, CORMAN F, D'ARIANO A. Railway line capacity consumption of different railway signalling systems under scheduled and disturbed conditions[J]. Journal of Rail Transport Planning and Management, 2013, 3(3): 78-94.
|
[17] |
汤波, 雷定猷, 张英贵, 等. 铁路车站咽喉通过能力计算方法[J]. 交通运输工程学报, 2010, 10(6): 69-74. http://transport.chd.edu.cn/article/id/201006012
TANG Bo, LEI Ding-you, ZHANG Ying-gui, et al. Calculating method of carrying capacity for railway station bottleneck[J]. Journal of Traffic and Transportation Engineering, 2010, 10(6): 69-74. (in Chinese). http://transport.chd.edu.cn/article/id/201006012
|
[18] |
潘登, 郑应平. 基于安全车距实时标定的列车间隔动态控制[J]. 交通运输工程学报, 2014, 14(1): 112-118. http://transport.chd.edu.cn/article/id/201401015
PAN Deng, ZHENG Ying-ping. Dynamic control of train interval based on real-time calibration of safe headway[J]. Journal of Traffic and Transportation Engineering, 2014, 14(1): 112-118. (in Chinese). http://transport.chd.edu.cn/article/id/201401015
|
[19] |
潘登, 梅萌, 郑应平. 高速列车跟驰运行控制策略与安全车距的互动演化[J]. 交通运输工程学报, 2014, 14(5): 90-100. http://transport.chd.edu.cn/article/id/201405012
PAN Deng, MEI Meng, ZHENG Ying-ping. Interactive evolution between safe headway and control strategy of highspeed trains during following operation[J]. Journal of Traffic and Transportation Engineering, 2014, 14(5): 90-100. (in Chinese). http://transport.chd.edu.cn/article/id/201405012
|
[20] |
彭其渊, 文超, 闫海峰. 提速战略对我国铁路运输发展的带动作用[J]. 西南交通大学学报, 2008, 43(6): 685-691.
PENG Qi-yuan, WEN Chao, YAN Hai-feng. Driving effects of speed increase on development of railway transportation in China[J]. Journal of Southwest Jiaotong University, 2008, 43(6): 685-691. (in Chinese).
|