Citation: | HU Da-lin, CHEN Ding-shi, ZHAO Xiao-you, GONG Jian-ping, LI Ying. Construction control of cantilever casting of long span reinforced concrete arch bridge[J]. Journal of Traffic and Transportation Engineering, 2016, 16(1): 25-36. doi: 10.19818/j.cnki.1671-1637.2016.01.004 |
[1] |
PEREZ-FADÓN S, HERRERO J E, SÁNCHEZ J J. Los Tilos Arch on La Palma Island[C]//CHEN Bao-chun, WEI Jian-gang. Proceedings of the 6th International Conference on Arch Bridges. Zagreb: SECON-HDGK, 2010: 143-150.
|
[2] |
RADIĆ J, ŠAVOR Z, PRPIĆ V, et al. Design and construction of the Maslenica Highway Bridge[C]//RADIĆ J, CHEN Bao-chun. Proceedings of the 1st Chinese-Croatian Joint Colloquium on Long Arch Bridges. Zagreb: SECON-HDGK, 2008: 229-240.
|
[3] |
ŠAVOR Z, MUJKANOVIĆ N, HRELJA G, et al. Construction of Krka River Arch Bridge near Skradin[C]//CHEN Bao-chun, RADIĆ J. Proceedings of the 2nd Chinese-Croatian Joint Colloquium on Construction of Arch Bridges. Zagreb: SECON-HDGK, 2009: 323-332.
|
[4] |
许有胜, 陈宝春. 南非布洛克兰斯拱桥[J]. 中外公路, 2005, 25(4): 109-112. https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200504035.htm
XU You-sheng, CHEN Bao-chun. Bloukrans Bridge of South Africa[J]. Journal of China and Foreign Highway, 2005, 25(4): 109-112. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200504035.htm
|
[5] |
JORDET E A, JACKOBSEN S E. The Svinesund Bridge[J]. Structural Concrete, 2007, 8(4): 201-209. doi: 10.1680/stco.2007.8.4.201
|
[6] |
ZANETELL D. The Colorado River Bridge at Hoover Dam―overview[J]. HPC Bridge Views, 2010(6): 1-11.
|
[7] |
ŠAVOR Z, BLEIZIFFER J. Long span concrete arch bridges of Europe[C]//RADIĆ J, CHEN Bao-chun. Proceedings of the 1st Chinese-Croatian Joint Colloquium on Long Arch Bridges. Zagreb: SECON-HDGK, 2008: 171-180.
|
[8] |
ŠAVOR Z, MUJKANNOVIC' N, HRELJA G. Design and construction of Krka River Arch Bridge[C]//RADIĆ J, CHEN Bao-chun. Proceedings of the 1st Chinese-Croatian Joint Colloquium on Long Arch Bridges. Zagreb: SECON-HDGK, 2008: 217-228.
|
[9] |
CHEN Bao-chun. Recent development and future trends of arch bridges[C]//RADIĆ J, KUŠTER M, ŠAVOR Z. Proceedings of the 7th International Conference on Arch Bridges. Zagreb: SECON-CSSE, 2013: 29-46.
|
[10] |
RADIĆ J, KUŠTER M. Aesthetics and sustainability of arch bridges[C]//RADIĆ J, KU kETR M, ŠAVOR Z. Proceedings of the 7th International Conference on Arch Bridges. Zagreb: SECON-CSSE, 2013: 13-28.
|
[11] |
WÖLFEL R V. The bridge over the Wilde Gera Valley, the longest-spanning road arch bridge in Germany[C]//RADIĆ J, KUŠTER M, ŠAVOR Z. Proceedings of the 7th International Conference on Arch Bridges. Zagreb: SECON-CSSE, 2013: 409-416.
|
[12] |
WÖLFEL R V. The arch bridges of the high-speed-railway across the Thuringian Forest: different erection methods[C]//RADIĆ J, KUŠTER M, ŠAVOR Z. Proceedings of the 7th International Conference on Arch Bridges. Zagreb: SECON-CSSE, 2013: 47-60.
|
[13] |
CHEN Bao-chun. Long span arch bridges in China[C]∥RADIĆ J, CHEN Bao-chun. Proceedings of the 1st Chinese-Croatian Joint Colloquium on Long Arch Bridges. Zagreb: SECON-HDGK, 2008: 119-134.
|
[14] |
CHEN Bao-chun, LIN Ye. An overview of long span concrete arch bridges in China[C]∥RADIĆ J, CHEN Bao-chun. Proceedings of the 1st Chinese-Croatian Joint Colloquium on Long Arch Bridges. Zagreb: SECON-HDGK, 2008: 163-170.
|
[15] |
XU Yong, CHEN Lie, XIE Hai-qing, et al. Design of the Beipanjiang Bridge on the high-speed railway between Shanghai and Kunming[C]∥RADIĆ J, CHEN Bao-chun. Proceedings of the 3rd Chinese-Croatian Joint Colloquium on Sustainable Arch Bridges. Zagreb: SECON-CSSE, 2011: 71-82.
|
[16] |
XU Yong, CHEN Ke-jian, REN Wei, et al. Design of Nanpanjiang Grand Bridge on high-speed railway from Kunming to Nanning[C]∥RADIĆ J, CHEN Bao-chun. Proceedings of the 3rd Chinese-Croatian Joint Colloquium on Sustainable Arch Bridges. Zagreb: SECON-CSSE, 2011: 83-90.
|
[17] |
陈宝春, 叶琳. 我国混凝土拱桥现状调查与发展方向分析[J]. 中外公路, 2008, 28(2): 89-96. https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200802027.htm
CHEN Bao-chun, YE Lin. Investigation and analysis on the present situation and development direction of concrete arch bridges in China[J]. Journal of China and Foreign Highway, 2008, 28(2): 89-96. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200802027.htm
|
[18] |
叶琳. 混凝土拱桥斜拉悬臂浇筑施工技术[J]. 福建建筑, 2012, 171(9): 61-64. https://www.cnki.com.cn/Article/CJFDTOTAL-FJJZ201209020.htm
YE Lin. Cable cantilever casting construction technology of concrete arch bridge[J]. Fujian Architecture and Construction, 2012, 171(9): 61-64. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-FJJZ201209020.htm
|
[19] |
陈宝春. 拱桥技术的回顾与展望[J]. 福州大学学报: 自然科学版, 2009, 37(1): 94-106. https://www.cnki.com.cn/Article/CJFDTOTAL-FZDZ200901019.htm
CHEN Bao-chun. View and review of arch bridge technology[J]. Journal of Fuzhou University: Natural Science Edition, 2009, 37(1): 94-106. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-FZDZ200901019.htm
|
[20] |
廖旭, 聂东, 张佐安, 等. 白沙沟大桥拱圈悬浇施工[J]. 公路, 2007(9): 49-54. https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL200709010.htm
LIAO Xu, NIE Dong, ZHANG Zuo-an, et al. Cantilever casting construction techniques of arch ring of Baishagou Bridge[J]. Highway, 2007(9): 49-54. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL200709010.htm
|
[21] |
TIAN Zhong-chu, PENG Wen-ping, ZHANG Jian-ren. Cable force control in the construction of arch bridges using inclined cable-stayed buckle and cantilever method[C]//RADIĆ J, KUŠTER M, ŠAVOR Z. Proceedings of the 7th International Conference on Arch Bridges. Zagreb: SECON-CSSE, 2013: 547-554.
|
[22] |
李晓斌, 蒲黔辉, 杨永清, 等. 钢筋混凝土拱桥悬臂浇注施工模型试验设计与索力优化[J]. 公路, 2007(7): 7-11. https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL200707004.htm
LI Xiao-bin, PU Qian-hui, YANG Yong-qing, et al. Model design and optimization of cable force for cantilevering cast construction of reinforced concrete arch bridge[J]. Highway, 2007(7): 7-11. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL200707004.htm
|
[23] |
亓路宽, 陈占力, 宋建永, 等. 拱桥悬浇扣挂施工中最大悬臂状态下的索力调整[J]. 公路交通科技, 2007, 24(7): 82-85. https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200707018.htm
QI Lu-kuan, CHEN Zhan-li, SONG Jian-yong, et al. Optimization of cable forces before joining during cantilever construction for arch bridge[J]. Journal of Highway and Transportation Research and Development, 2007, 24(7): 82-85. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK200707018.htm
|
[24] |
周叶军, 周厚斌, 张大伟. 基于ANSYS的悬臂浇筑拱桥施工扣索索力优化[J]. 四川建筑, 2009, 29(1): 211-213. https://www.cnki.com.cn/Article/CJFDTOTAL-SCJI200901094.htm
ZHOU Ye-jun, ZHOU Hou-bin, ZHANG Da-wei. Cable force optimization for reinforced concrete arch bridge with cantilever cast method based on ANSYS[J]. Sichuan Architecture, 2009, 29(1): 211-213. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SCJI200901094.htm
|
[25] |
周叶军. 悬臂浇筑钢筋混凝土拱桥最优扣索索力计算方法研究[D]. 成都: 西南交通大学, 2008.
ZHOU Ye-jun. Study on calculation method of optimal stayed-buckle cable force for reinforced concrete arch bridge with cantilever cast method[D]. Chengdu: Southwest Jiaotong University, 2008. (in Chinese)
|
[26] |
张应奎. 太平湖大桥缆索吊装研究[D]. 合肥: 合肥工业大学, 2006.
ZHANG Ying-kui. Study on cable erection construction of Taiping Lake Large Bridge[D]. Hefei: Hefei University of Technology, 2006. (in Chinese)
|
[27] |
乔玉英. 定长扣索法在大跨径钢管混凝土拱桥拱肋安装中的应用[D]. 重庆: 重庆交通学院, 2003.
QIAO Yu-ying. The application of limit length of cable method in long-span concrete filled steel tubular arch bridge's rib assembling[D]. Chongqing: Chongqing Jiaotong University, 2003. (in Chinese)
|
[28] |
蔡净. 定长扣索法安装拱桁架节段控制索力计算[J]. 中南公路工程, 2003, 28(3): 16-17, 26. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL200303004.htm
CAI Jing. Calculation of force in control cable for arch segment erection with one-time jacking cable method[J]. Central South Highway Engineering, 2003, 28(3): 16-17, 26. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL200303004.htm
|
[29] |
牛润明, 安蕊梅, 邓海. 钢管混凝土拱桥施工关键技术及稳定性分析[J]. 筑路机械与施工机械化, 2013, 30(3): 67-69. https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201303042.htm
NIU Run-ming, AN Rui-mei, DENG Hai. Key construction technique and stability analysis of concrete-filled steel tube arch bridge[J]. Road Machinery and Construction Mechanization, 2013, 30(3): 67-69. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201303042.htm
|