Citation: | SHEN Yao-ming, LIN Bo-liang, XUE Jin-bo, WANG Zhong-kai, MENG Yu-fei, XU Zhi-quan. Optimization method of long cycle high-level maintenance plan for high-speed EMUs[J]. Journal of Traffic and Transportation Engineering, 2022, 22(4): 396-407. doi: 10.19818/j.cnki.1671-1637.2022.04.030 |
[1] |
LIN Bo-liang, WU Jian-ping, LIN Rui-xi, et al. Optimization of high-level preventive maintenance scheduling for high-speed trains[J]. Reliability Engineering and System Safety, 2019, 183: 261-275. doi: 10.1016/j.ress.2018.11.028
|
[2] |
武建平, 何君礼, 林柏梁, 等. 动车组高级修计划优化模型及算法研究[J]. 铁道学报, 2019, 41(7): 1-9. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201907003.htm
WU Jian-ping, HE Jun-li, LIN Bo-liang, et al. An optimization model and algorithm for EMU train high-level maintenance planning[J]. Journal of the China Railway Society, 2019, 41(7): 1-9. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201907003.htm
|
[3] |
WU Jian-ping, LIN Bo-liang, WANG Jia-xi, et al. A network-based method for the EMU train high-level maintenance planning problem[J]. Applied Sciences, 2017, 8(2): 1-18.
|
[4] |
王忠凯, 史天运, 林柏梁, 等. 动车组高级检修车间调度问题的优化模型及算法[J]. 中国铁道科学, 2016, 37(6): 82-89. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201606012.htm
WANG Zhong-kai, SHI Tian-yun, LIN Bo-liang, et al. Optimization model and algorithm for overhaul job shop scheduling of electric multiple unit[J]. China Railway Science, 2016, 37(6): 82-89. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201606012.htm
|
[5] |
赵晓明. 动车组高级修检修停时优化研究[J]. 中国铁路, 2020(10): 62-65. https://www.cnki.com.cn/Article/CJFDTOTAL-TLZG202010011.htm
ZHAO Xiao-ming. Study of optimization of stopping time for high-level maintenance and inspection of EMUs[J]. China Railway, 2020(10): 62-65. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TLZG202010011.htm
|
[6] |
王利锋. 大规模动车组高级修工艺设计研究[J]. 高速铁路技术, 2018, 9(6): 49-52. https://www.cnki.com.cn/Article/CJFDTOTAL-GSTL201806010.htm
WANG Li-feng. Research on advanced maintenance technology design for large-scale EMUs[J]. High Speed Railway Technology, 2018, 9(6): 49-52. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GSTL201806010.htm
|
[7] |
吴晨恺, 陈进, 林凤涛. 基于等效锥度的动车组三级修间隔周期研究[J]. 城市轨道交通研究, 2018, 21(10): 48-51. https://www.cnki.com.cn/Article/CJFDTOTAL-GDJT201810014.htm
WU Chen-kai, CHEN Jin, LIN Feng-tao. On interval extension in third degree repair of CRH based on equivalent conicity[J]. Urban Mass Transit, 2018, 21(10): 48-51. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GDJT201810014.htm
|
[8] |
王忠凯. 动车组运用检修计划优化方法的研究[D]. 北京: 中国铁道科学研究院, 2012.
WANG Zhong-kai. Research on the optimization of operation and maintenance schemes of EMUs[D]. Beijing: China Academy of Railway Sciences Co., Ltd., 2012. (in Chinese)
|
[9] |
李建. 动车组运用与检修计划综合优化方法研究[D]. 北京: 北京交通大学, 2017.
LI Jian. Research on integrated method for optimizing the assignment and maintenance plan of electrical multiple units[D]. Beijing: Beijing Jiaotong University, 2017. (in Chinese)
|
[10] |
王家喜. 动车所检修作业计划优化方法研究[D]. 北京: 北京交通大学, 2018.
WANG Jia-xi. A study on the optimization method of maintenance operation plan in depots of electric multiple units[D]. Beijing: Beijing Jiaotong University, 2018. (in Chinese)
|
[11] |
MARÓTI G, KROON L. Maintenance routing for train units: the transition model[J]. Transportation Science, 2005, 39(4): 518-525. doi: 10.1287/trsc.1050.0116
|
[12] |
MARÓTI G, KROON L. Maintenance routing for train units: the interchange model[J]. Computers and Operations Research, 2007, 34(4): 1121-1140. doi: 10.1016/j.cor.2005.05.026
|
[13] |
CADARSO L, MARÍN A. Improving robustness of rolling stock circulations in rapid transit networks[J]. Computer and Operation Research, 2014, 51(3): 146-159.
|
[14] |
ALBERTI A R, CAVALCANTE C, SCARF P, et al. Modelling inspection and replacement quality for a protection system[J]. Reliability Engineering and System Safety, 2018, 176: 145-153.
|
[15] |
BERRADE M, SCARF P, CAVALCANTE C, et al. Imperfect inspection and replacement of a system with a defective state: a cost and reliability analysis[J]. Reliability Engineering and System Safety, 2013, 120: 80-87. doi: 10.1016/j.ress.2013.02.024
|
[16] |
WANG Xiao-lin, HE Kang-zhe, HE Zhen, et al. Cost analysis of a piece-wise renewing free replacement warranty policy[J]. Computers and Industrial Engineering, 2019, 135: 1047-1062.
|
[17] |
WANG Jin-ting, ZHU Sheng, DU Si-miao. Analysis of a two-dimensional stair-case warranty policy with preventive maintenance[J]. IMA Journal of Management Mathematics, 2020(1): 1-17.
|
[18] |
CAVALCANTE C, SCARF P, BERRADE M. Imperfect inspection of a system with unrevealed failure and an unrevealed defective state[J]. IEEE Transactions on Reliability, 2019, 68(2): 764-775.
|
[19] |
DRIESSEN J, PENG H, VAN HOUTUM G. Maintenance optimization under non-constant probabilities of imperfect inspections[J]. Reliability Engineeringand System Safety, 2017, 165: 115-123.
|
[20] |
ALBERTI A R, CAVALCANTE C. A two-scale maintenance policy for protection systems subject to shocks when meeting demands[J]. Reliability Engineering and System Safety, 2020, 204: 107118.
|
[21] |
WANG Xiao-lin, LI Li-shuai, XIE Min. An unpunctual preventive maintenance policy under two-dimensional warranty[J]. European Journal of Operational Research, 2020, 282(1): 304-318.
|
[22] |
SU Chun, WANG Xiao-lin. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty[J]. Reliability Engineering and System Safety, 2016, 155: 169-178.
|
[23] |
PENG Shi-zhe, JIANG Wei, ZHAO Wen-hui. A preventive maintenance policy with usage-dependent failure rate thresholds under two-dimensional warranties[J]. ⅡSE Transactions, 2021, 53(11): 1231-1243.
|
[24] |
YANG Li, YE Zhi-sheng, LEE C G, et al. A two-phase preventive maintenance policy considering imperfect repair and postponed replacement[J]. European Journal of Operational Research, 2019, 274(3): 966-977.
|
[25] |
GRIGORIEV A, KLUNDERT J, SPIEKSMA F. Modeling and solving the periodic maintenance problem[J]. European Journal of Operational Research, 2006, 172(3): 783-797.
|
[26] |
MOUDANI W E, MORA-CAMINO F. A dynamic approach for aircraft assignment and maintenance scheduling by airlines[J]. Journal of Air Transport Management, 2000, 6(4): 233-237.
|
[27] |
SRIRAM C, HAGHANI A. An optimization model for aircraft maintenance scheduling and re-assignment[J]. Transportation Research Part A: Policy and Practice, 2003, 37(1): 29-48.
|
[28] |
KEYSAN G, NEMHAUSER G L, SAVELSBERGH M W. Tactical and operational planning of scheduled maintenance for per-seat, on-demand air transportation[J]. Transportation Science, 2010, 44(3): 291-306.
|
[29] |
DERIS S, OMATU S, OHTA H, et al. Ship maintenance scheduling by genetic algorithm and constraint-based reasoning[J]. European Journal of Operational Research, 1999, 112(3): 489-502.
|
[30] |
GO H, KIM J, LEE D. Operation and preventive maintenance scheduling for containerships: mathematical model and solution algorithm[J]. European Journal of Operational Research, 2013, 229(3): 626-636.
|
[31] |
于毅, 刘红, 阮继华. 基于层次分析法优化船舶维修计划[J]. 江苏船舶, 2001, 18(4): 14-16. https://www.cnki.com.cn/Article/CJFDTOTAL-JSCB200104003.htm
YU Yi, LIU Hong, RUAN Ji-hua. Optimizing ship maintenance plans based on analytic hierarchy process method[J]. Jiangsu Ship, 2001, 18(4): 14-16. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSCB200104003.htm
|
[32] |
HAGHANI A, SHAFAHI Y. Bus maintenance systems and maintenance scheduling: model formulations and solutions[J]. Transportation Research Part A: Policy and Practice, 2002, 36(5): 453-482.
|