WANG Shan-qiang, CHENG Yin-hang. The Ability Improvement of Track Circuit Once Adjusting by Changing the Ratio of Release Voltage and Work Voltage of Track Relay[J]. Journal of Traffic and Transportation Engineering, 2001, 1(4): 29-32.
Citation: WANG Shan-qiang, CHENG Yin-hang. The Ability Improvement of Track Circuit Once Adjusting by Changing the Ratio of Release Voltage and Work Voltage of Track Relay[J]. Journal of Traffic and Transportation Engineering, 2001, 1(4): 29-32.

The Ability Improvement of Track Circuit Once Adjusting by Changing the Ratio of Release Voltage and Work Voltage of Track Relay

  • Received Date: 2000-12-20
  • Publish Date: 2001-12-25
  • A method for improving the ability of JZXC 480 track circuit once adjusting was presented. The method is to in crease the ratio of release voltage and work voltage of track relay. This method was simulated by computer. The results show that when the ratio is increased from 50% to 70%, the range of once adjusting track circuit is enlarged more.

     

  • loading
  • [1]
    中华人民共和国铁道部铁运[2000]14号. 信号维护规则技术标准[S]. 北京: 中国铁道出版社, 2000.
    [2]
    中华人民共和国铁道部铁电务字[1994]16号. 信号维护规则技术标准[S]. 北京: 中国铁道出版社, 1994.
    [3]
    铁道部电务局. 信号维修手册[M]. 北京: 中国铁道出版社, 1996.
    [4]
    陶启沪. 铁道信号基础设备及原理[M]. 北京: 中国铁道出版社, 1994.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (299) PDF downloads(448) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return