Citation: | MEI Gui-ming, ZHANG Wei-hua. Dynamics model and behavior of pantograph/catenary system[J]. Journal of Traffic and Transportation Engineering, 2002, 2(1): 20-25. |
[1] |
梅桂明. 受电弓/接触网垂向耦合动力学研究[D]. 成都: 西南交通大学, 2001.
|
[2] |
章新生, 杨宝全, 姚金先. 电力机车受电弓的静接触压力曲线及安全保护问题[J]. 材料开发与应用, 1994, 9 (2): 38-41. https://www.cnki.com.cn/Article/CJFDTOTAL-CLKY402.006.htm
|
[3] |
MANABE K, MORIKAWA T, HIKITA M. On dynamics of overhead equipment and multi-pantograph system[J]. Quarterly Reports of RTRI, 1986, 27(1): 21-25.
|
[4] |
VINAYAGALINGAM T. Computer evaluation of controlled pantographs for current collection from simple catenary overhead equipment at high speed[J]. ASME Journal of Dynamic Systems, Measurement, and Control, 1983, 105: 287-294. doi: 10.1115/1.3140673
|
[5] |
LINK M, NOWAK B. Zur dynamischen analyse des systems stromabnehmer und fahrleitung, dargestllt am beispiel des intercity experimental[J]. VDI Berichte, 1986, (603): 245-261.
|
[6] |
F· S·谢, I· E·摩尔, R· T·享克尔, 沈文钧, 张景绘. 机械振动——理论应用[M]. 北京: 国防工业出版社, 1984.181-214.
|
[7] |
翟婉明, 蔡成标. 机车-轨道耦合振动对受电弓-接触网系统动力学的影响[J]. 铁道学报, 1998, 20(1): 32-38. doi: 10.3321/j.issn:1001-8360.1998.01.005
|
[8] |
SEERING W, ARMBRUSTER K, VESELY C, et al. Experimental and analytical study of pantograph dynamics[J]. ASME Journal of Dynamics System, Measurement, and Control, 1991, 113: 242-247. doi: 10.1115/1.2896371
|
[9] |
邢海军. 电力机车受电弓的动态特性与振动控制研究[D]. 成都: 西南交通大学, 1999.
|
[10] |
付秀通. 轮/轨-弓/网系统耦合动力学数值模拟分析与试验研究[D]. 北京: 铁道部科学研究院, 1996.
|
[11] |
张卫华. 受电弓-接触网系统动态特性的研究[D]. 成都: 西南交通大学, 1988.
|