WANG Dian-hai, YANG Shao-hui, JING Chun-guang. Cumulative curve method for calculating saturation flow rate and phase lost time[J]. Journal of Traffic and Transportation Engineering, 2003, 3(3): 75-78.
Citation: WANG Dian-hai, YANG Shao-hui, JING Chun-guang. Cumulative curve method for calculating saturation flow rate and phase lost time[J]. Journal of Traffic and Transportation Engineering, 2003, 3(3): 75-78.

Cumulative curve method for calculating saturation flow rate and phase lost time

More Information
  • Author Bio:

    WANG Dian-hai (1962-), male, PhD, professor, 86-431-5705857, wangdianhai@sohu.com

  • Received Date: 2003-02-01
  • Publish Date: 2003-09-25
  • Compared with Webster method, cumulative curve method can measure starting time and ending time. As an example, this method was applied in several lanes in Changchun city. The applying results show that the saturation flow rate of one lane is between 1 600~1 900 veh/ h, and the total lost time is less than 2 s without disturbing. The saturation flow rate approxi- mates the assumptive value, 1 700~1 800 veh/h, but the lost time is less than what HCM com- mends, 3~5 s, which is also less than the yellow time, 3 s.

     

  • loading
  • [1]
    Robert M Shanteau. Using cumulative curves to measure saturation flow and lost time[J]. ITE Journal, 1988, 58(10): 50-54.
    [2]
    全永木焱. 城市交通控制[M]. 北京: 人民交通出版社, 1989.
    [3]
    杨佩昆, 张树升. 交通管理与控制[M]. 北京: 人民交通出版社, 1997.
    [4]
    王殿海. 交通流理论[M]. 北京: 人民交通出版社, 2002.
    [5]
    徐吉谦. 交通工程总论[M]. 北京: 人民交通出版社, 1991.
    [6]
    中国公路学会《交通工程手册》编委会. 交通工程手册[M]. 北京: 人民交通出版社, 1998.
    [7]
    美国交通研究委会员, 任福田. 道路通行能力手册[M]. 北京: 中国建筑工业出版社, 1991.
    [8]
    陆化普. 城市交通现代化管理[M]. 北京: 人民交通出版社, 1999.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (406) PDF downloads(476) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return