PENG Wen-sheng, PENG Hui. Passenger station layout of high-speed railway existing terminal[J]. Journal of Traffic and Transportation Engineering, 2004, 4(2): 62-65.
Citation: PENG Wen-sheng, PENG Hui. Passenger station layout of high-speed railway existing terminal[J]. Journal of Traffic and Transportation Engineering, 2004, 4(2): 62-65.

Passenger station layout of high-speed railway existing terminal

More Information
  • Author Bio:

    PENG Wen-sheng(1962-), male, senior engineer, 86-931-4934860, p.wensheng@163.com

  • Received Date: 2003-08-09
  • Publish Date: 2004-06-25
  • This paper analyzed the characteristics of high-speed railway and the mode of transport organization, and some factors, such as passenger station division, passenger transfer demand, operation system and leadin line project, discussed the relation between the planning of leading the high-speed railway into the existing terminal and the location, character, scale and planning of city. After summarizing the relation between the leading mode and the existing terminal planning, this paper put forward the mode and some suggestions, which are applicable in China. Applied result shows that the project is feasible.

     

  • loading
  • [1]
    钱仲侯. 高速铁路概论[M]. 北京: 中国铁道出版社, 1999.
    [2]
    陈应先. 高速铁路线路与车站设计[M]. 北京: 中国铁道出版社, 2001.
    [3]
    铁道第三勘察设计院. 京沪高速铁路设计暂行规定[M]. 北京: 中国铁道出版社, 2003.
    [4]
    铁道第一勘察设计院. 郑州至西安客运专线预可行性研究[R]. 兰州: 铁道第一勘察设计院, 2003.
    [5]
    铁道第四勘察设计院. 武汉至广州客运专线预可行性研究[R]. 武汉: 铁道第四勘察设计院, 2003.
    [6]
    刘其斌, 马桂贞. 铁路站场及枢纽[M]. 北京: 中国铁道出版社, 2002.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (337) PDF downloads(209) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return