This paper analyzed the characteristics of high-speed railway and the mode of transport organization, and some factors, such as passenger station division, passenger transfer demand, operation system and leadin line project, discussed the relation between the planning of leading the high-speed railway into the existing terminal and the location, character, scale and planning of city. After summarizing the relation between the leading mode and the existing terminal planning, this paper put forward the mode and some suggestions, which are applicable in China. Applied result shows that the project is feasible.