WU Tong-le, XU Yue. Comprehensive evaluation method of bridge strengthening effectiveness[J]. Journal of Traffic and Transportation Engineering, 2005, 5(1): 28-32.
Citation: WU Tong-le, XU Yue. Comprehensive evaluation method of bridge strengthening effectiveness[J]. Journal of Traffic and Transportation Engineering, 2005, 5(1): 28-32.

Comprehensive evaluation method of bridge strengthening effectiveness

More Information
  • Author Bio:

    WU Tong-le(1976-), male, master, 86-371-7789490, wtongle@163.com

  • Received Date: 2004-04-17
  • Publish Date: 2005-03-25
  • In order to evaluate bridge strengthening effectiveness, the paper put forward the conception and content system of post-evaluation of bridge strengthening effectiveness, based on the conventional success-degree evaluation method, set up the comprehensive success-degree evaluation model of bridge strengthening effectiveness. In the model, the evaluating indices system of success-degree for bridge strengthening was established by analytic hierarchy process, the indexing set of evaluating indicators was determined with the merits of Delphi method, and it was optimized according to the different types of indicators, hence comprehensive appraisal matrix was formed, the matrix operator of fuzzy theory was improved. Computation result of bridge evaluation is 0.46, comprehensive evaluation is part success, which accords with the bridge real situation, the model is feasible.

     

  • loading
  • [1] 张三力. 项目后评价[M]. 北京: 清华大学出版社, 2001.
    [2]
    JING Hong-jun, YAN Xi-li. On highway technique evaluation method[J]. Journal of Traffic and Transportation Engineering, 2001, 1(4): 41-43. (in Chinese) http://transport.chd.edu.cn/article/id/200104009
    [3]
    ZHAO Wei-shuang, CHANG Wei. The study of fuzzy comprehensive evaluation model for the effect of technology spread [J]. Journal of Shenyang Institute of Technology, 2001, 20(1): 77-81. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SGXY200101016.htm
    [4]
    LU Bin. Fuzzing mathematics method for success-degree evaluation of post-evaluation of investment loan items[J]. Policy Making Reference, 1996, 10(5): 42-44. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JCJJ605.019.htm
    [5]
    ZHENG Ji-guang, WANG Chao-hai, SUN Fu-shen, et al. Late evaluation and evaluated method of concrete bridge structure [J]. Northeastern Highway, 2002, 25(2): 69-71. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-DBGL200202026.htm
    [6] 武同乐. 桥梁加固后评价方法研究[D]. 西安: 长安大学, 2004.
    [7] 谌润水, 胡钊芳, 帅长斌. 公路旧桥加固技术与实例[M]. 北京: 人民交通出版社, 2002.
    [8]
    XU Yue, WU Tong-le. Life-cycle cost comparative analysis of bridges strengthening[J]. Journal of Chang'an University(Natural Science Edition), 2004, 24(3): 30-34. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200403008.htm

Catalog

    Article Metrics

    Article views (347) PDF downloads(399) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return