Citation: | Xiao Heng-hui, Qi Huan, Wang Xiao-ping, Liu Yun-feng, Chen Ying-chun, Ceng Liang. Arrangement algorithm outside ship lock during ship scheduling[J]. Journal of Traffic and Transportation Engineering, 2007, 7(1): 26-29. |
[1] |
张玮, 廖鹏, 吴玲莉, 等. 船闸通过能力主要影响因素[J]. 交通运输工程学报, 2004, 4(3): 108-110. doi: 10.3321/j.issn:1671-1637.2004.03.025
Zhang Wei, Liao Peng, Wu Ling-li, et al. Main parameters of water way lock capacity[J]. Journal of Traffic and Transportation Engineering, 2004, 4(3): 108-110. (in Chinese) doi: 10.3321/j.issn:1671-1637.2004.03.025
|
[2] |
胡洋. 三峡工程五级船闸通过能力初步分析和提高枢纽综合通过能力的对策[J]. 水运工程, 2004, 10(10): 74-77. doi: 10.3969/j.issn.1002-4972.2004.10.020
Hu Yang. Navigation capacity analysis of five-flight shiplock of Three Gorges project and measures for improving the comprehensive navigation capacity of the junction[J]. Port and Waterway Engineering, 2004, 10(10): 74-77. (in Chinese) doi: 10.3969/j.issn.1002-4972.2004.10.020
|
[3] |
赖炜, 齐欢. 三峡船闸运行调度中的多属性决策问题[J]. 控制与决策, 2002, 17(2): 163-165. doi: 10.3321/j.issn:1001-0920.2002.02.009
Lai Wei, Qi Huan. The MADM of Three Gorges ship gates running[J]. Control and Decision, 2002, 17(2): 163-165. (in Chinese) doi: 10.3321/j.issn:1001-0920.2002.02.009
|
[4] |
刘云峰, 齐欢. DFS算法在三峡永久船闸优化编排中的应用[J]. 计算机工程, 2002, 28(8): 224-226. doi: 10.3969/j.issn.1000-3428.2002.08.087
Liu Yun-feng, Qi Huan. Application of DFS algorithmin the arranging of Three Gorges permanent lock chamber[J]. Computer Engineering, 2002, 28(8): 224-226. (in Chinese) doi: 10.3969/j.issn.1000-3428.2002.08.087
|
[5] |
Li m A. The berth planning problem[J]. Operations Research Letters, 1998, 22(2): 105-110.
|
[6] |
I mai A, Nagaiawa K, Chan W. Efficient planning of berth allocation for container terminals in Asia[J]. Journal of Advanced Transportation, 1997, 31(1): 75-94. doi: 10.1002/atr.5670310107
|
[7] |
Ronen D. Ship scheduling: the last decade[J]. European Journal of Operation Research, 1993, 71(3): 325-333. doi: 10.1016/0377-2217(93)90343-L
|
[8] |
Chrisliansen M, Fagerholt K, Ronen D. Ship routing and scheduling: status and perspectives[J]. Transportation Science, 2004, 38(1): 1-18. doi: 10.1287/trsc.1030.0036
|
[9] |
王小平, 齐欢, 肖恒辉, 等. 基于串联排队网络的三峡-葛洲坝水利枢纽联合调度模型[J]. 交通运输工程学报, 2006, 6(3): 82-86. doi: 10.3321/j
Wang Xiao-ping, Qi Huan, Xiao Heng-hui, et al. Coscheduling model of Three Gorges-Gezhou Dambased on series queuing network[J]. Journal of Traffic and Transportation Engineering, 2006, 6(3): 82-86. (in Chinese) doi: 10.3321/j
|
[10] |
Cordeau J, Laporte G, Legato P, et al. Models and tabu search heuristics for the berth-allocation problem[J]. Transportation Science, 2005, 39(4): 526-538. doi: 10.1287/trsc.1050.0120
|