Bai Fang, Zuo Hong-fu, Wen Zhen-hua, Rong Xiang, Zhao Hong-hua. Aeroengine scheduling method under condition-based maintenance strategy[J]. Journal of Traffic and Transportation Engineering, 2007, 7(3): 29-33.
Citation: Bai Fang, Zuo Hong-fu, Wen Zhen-hua, Rong Xiang, Zhao Hong-hua. Aeroengine scheduling method under condition-based maintenance strategy[J]. Journal of Traffic and Transportation Engineering, 2007, 7(3): 29-33.

Aeroengine scheduling method under condition-based maintenance strategy

More Information
  • Author Bio:

    Bai Fang(1979-), female, doctoral student of engineering, +86-25-84895772-803, baifan91126@163.com

    Zuo Hong-fu(1959-), male, professor, +86-25-84891098, rms@nuaa.edu.cn

  • Received Date: 2007-01-19
  • Publish Date: 2007-06-25
  • Based on the modeling thought of modern scheduling theory, the requirement property for aeroengines and the turnover property of aeroengine maintenance were analyzed, the concept of work note was introduced, a scheduling model of aeroengines under condition-based maintenance strategy was established, an online longest processing time (LPT) rule algorithm was improved for solving the model, and the used data of CF6 aeroengines were studied. It is pointed that aimed at aeroengine, on-wing time is longer, maintenance time is lower, guarantee rate is higher, and rental loss cost is lower when LPT rule is compared with traditional first come first serve (FCFS) rule. Analysis result indicates that LPT rule is better than FCFS rule, and the model is feasible.

     

  • loading
  • [1] 梁剑. 基于成本优化的民用航空发动机视情维修决策研究[D]. 南京: 南京航空航天大学, 2005.
    [2]
    Xu Jun-gang, Dai Guo-zhong, Wang Hong-an. An overview of theories and methods of production scheduling[J]. Journal of Computer Research and Development, 2004, 41 (2): 257-267. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JFYZ200402000.htm
    [3]
    Wang Xiao-ping, Qi Huan, Xiao Heng-hui, et al. Co-scheduling model of Three Gorges-Gezhou Dam based on seriesqueuing network[J]. Journal of Traffic and Transportation Engineering, 2006, 6 (3): 82-86. (in Chinese) http://transport.chd.edu.cn/article/id/200603018
    [4] 唐恒永, 赵传立. 排序引论[M]. 北京: 科学出版社, 2002.
    [5] 唐国春, 张峰, 罗守成, 等. 现代排序论[M]. 上海: 上海科学普及出版社, 2003.
    [6]
    Zuo Hong-fu, Zhang Hai-jun, Rong Xiang. Condition-based aeroengine maintenance decision method using proportional hazards model[J]. Journal of Aerospace Power, 2006, 21 (4): 716-721. (in Chinese) doi: 10.3969/j.issn.1000-8055.2006.04.018
    [7]
    Graham R L. Bounds on multiprocessing ti ming anomalies[J]. SIAM Journal on Applied Mathematics, 1969, 17 (2): 416-429. doi: 10.1137/0117039
    [8]
    Chen Bo. Areviewof on-line machine scheduling: algorithms and competitiveness[J]. Mathematical Theory and Application, 1999, 19 (3): 1-15.
    [9]
    Chen Bo, Vestjens AP A. Scheduling onidentical machines: howgoodis LPTin an on-line setting?[J]. Operations Research Letters, 1997, 21 (2): 165-169.
    [10]
    Chen Shi-ping, Zhang Guo-chuan. On-line scheduling on two parallel machines where jobs arrive over ti me[J]. Acta Mathematicae Applicatae Sinica, 2000, 23 (1): 31-37. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YYSU200001003.htm

Catalog

    Article Metrics

    Article views (386) PDF downloads(236) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return