WANG Jing-feng, XU Xing, XIANG Yi-qiang. Method of construction error control for cantilever-casting cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 61-67.
Citation: WANG Jing-feng, XU Xing, XIANG Yi-qiang. Method of construction error control for cantilever-casting cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 61-67.

Method of construction error control for cantilever-casting cable-stayed bridge

More Information
  • Author Bio:

    WANG Jin-feng(1976-), male, associate professor, PhD, +86-571-87951804, wangjfcong@126.com

  • Received Date: 2008-01-11
  • Publish Date: 2008-08-25
  • During the cantilever-casting construction of prestressed concrete(PC) cable-stayed bridge, in order to reduce the errors of cable tension and line shape, the error cause and present situation of control means were analyzed, and the control methods of model error and cantilever-casting simulation error were discussed.With the combination of 3D isoparametric element and shell element, degenerated solid element was proposed for the spatial analysis of complex PC bridge, and discrete bar model was set up.According to the deformation compatibility condition of traction cable's anchorage, the increment of cable tension during casting concrete was computed, and the calculation formula of traveler's front level was educed.Application result indicates that the control precision of trailing cable tension is within 3%, the control precision of final cable tension is within 5%, and the error of traveler's front level is within 1 cm.Therefore, the cable tension and line shape of PC cable-stayed bridge under all construction conditions can be well predicted by the proposed method.

     

  • loading
  • [1]
    何雄君, 范立础, 李丽平, 等. 大型桥梁施工预测控制系统研究[J]. 中国公路学报, 2006, 19(1): 53-57. doi: 10.3321/j.issn:1001-7372.2006.01.011

    HE Xiong-jun, FAN Li-chu, LI Li-ping, et al. Study of prediction control system for construction of bridges with longspans[J]. China Journal of Highway and Transport, 2006, 19(1): 53-57. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.01.011
    [2]
    YI U P K A, BROTTON D M. Computation of fabrication dimensions for cable-stayed bridges[J]. The Structure Engineer, 1988, 66(15): 237-243.
    [3]
    陈德伟, 许俊, 周宗泽, 等. 预应力混凝土斜拉桥施工控制新进展[J]. 同济大学学报: 自然科学版, 2001, 29(1): 99-103. doi: 10.3321/j.issn:0253-374X.2001.01.021

    CHEN De-wei, XUJun, ZHOU Zong-ze, et al. New evolution of prestressed concrete cable-stayed bridge construction control[J]. Journal of Tongji University: Natural Science, 2001, 29(1): 99-103. (in Chinese) doi: 10.3321/j.issn:0253-374X.2001.01.021
    [4]
    颜东煌, 陈常松, 涂光亚. 混凝土斜拉桥施工控制温度影响及其现场修正[J]. 中国公路学报, 2006, 19(4): 71-76. doi: 10.3321/j.issn:1001-7372.2006.04.013

    YAN Dong-huang, CHEN Chang-song, TU Guang-ya. Temperature influence and its field correction during construction control of concrete cable-stayed bridge[J]. China Journal of Highway and Transport, 2006, 19(4): 71-76. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.04.013
    [5]
    周敉, 宋一凡, 赵小星. 预应力混凝土桥梁悬臂浇筑的施工控制[J]. 长安大学学报: 自然科学版, 2005, 25(6): 43-48. doi: 10.3321/j.issn:1671-8879.2005.06.011

    ZHOU Mi, SONG Yi-fan, ZHAO Xiao-xing. Control technique for construction of prestressed-concrete cantilever casting bridge[J]. Journal of Chang an University: Natural Science Edition, 2005, 25(6): 43-48. (in Chinese) doi: 10.3321/j.issn:1671-8879.2005.06.011
    [6]
    徐兴, 凌道盛. 实体退化单元系列[J]. 固体力学学报: 计算力学专辑, 2001, 22(S): 1-12.

    XU Xing, LI NG Dao-sheng. Degenerated solid elements[J]. Acta Mechanica Solida Sinica, 2001, 22(S): 1-12. (in Chinese)
    [7]
    肖汝诚. 桥梁结构分析及程序系统[M]. 北京: 人民交通出版社, 2002.
    [8]
    王毅, 叶见曙, 顾祥峰. 横梁预应力束的平弯对混凝土斜拉桥边箱斜腹板的影响[J]. 交通运输工程学报, 2005, 5(2): 51-55. doi: 10.3321/j.issn:1671-1637.2005.02.013

    WANG Yi, YE Jian-shu, GU Xiang-feng. Influence of hori-zontal curvature of prestressing tendon in transverse beamson concrete cable-stayed bridge inclined web[J]. Journal of Traffic and Transportation Engineering, 2005, 5(2): 51-55. (in Chinese) doi: 10.3321/j.issn:1671-1637.2005.02.013
    [9]
    陈德伟, 黄大健, 项海帆. P. C. 斜拉桥悬臂施工的拉索式长挂篮新工艺[J]. 土木工程学报, 1996, 29(6): 69-73. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC199606008.htm

    CHEN De-wei, HUANG Da-jian, XI ANG Hai-fan. A newmethod for erecting cantilevers with long suspended flash-work in P. C. cable-stayed bridges[J]. China Civil Engineering Journal, 1996, 29(6): 69-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC199606008.htm
    [10]
    周念先, 杨共树. 预应力混凝土斜张桥[M]. 北京: 人民交通出版社, 1989.
    [11]
    狄谨, 黄庆. 无背索斜塔钢-混凝土结合梁斜拉桥施工控制仿真[J]. 长安大学学报: 自然科学版, 2004, 24(3): 43-47. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200403011.htm

    DI Jin, HUANG Qing. Simulation of construction control forone inclined tower cable-stayed bridge of steel-concrete composite box girder without back stay[J]. Journal of Chang an University: Natural Science Edition, 2004, 24(3): 43-47. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200403011.htm
    [12]
    戴公连, 李德建. 浏阳河洪山大桥异形斜拉桥主梁空间受力及稳定性分析[J]. 中国公路学报, 2002, 15(3): 53-56. doi: 10.3321/j.issn:1001-7372.2002.03.012

    DAI Gong-lian, LI De-jian. Spacial analysis of internal forceand stability on cable-stayed bridge without back stay over Liuyang river[J]. China Journal of Highway and Transport, 2002, 15(3): 53-56. (in Chinese) doi: 10.3321/j.issn:1001-7372.2002.03.012
    [13]
    REDDY P, GHABOUSSI J, HAWKI NS N M. Nonlinear analysis and simulation of construction of cable-stayed bridges[J]. Journal of Bridge Engineering, 1999, 4(4): 249-257. doi: 10.1061/(ASCE)1084-0702(1999)4:4(249)
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (288) PDF downloads(435) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return