Citation: | WANG Jing-feng, XU Xing, XIANG Yi-qiang. Method of construction error control for cantilever-casting cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 61-67. |
[1] |
HE Xiong-jun, FAN Li-chu, LI Li-ping, et al. Study of prediction control system for construction of bridges with longspans[J]. China Journal of Highway and Transport, 2006, 19(1): 53-57. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.01.011
|
[2] |
YI U P K A, BROTTON D M. Computation of fabrication dimensions for cable-stayed bridges[J]. The Structure Engineer, 1988, 66(15): 237-243.
|
[3] |
CHEN De-wei, XUJun, ZHOU Zong-ze, et al. New evolution of prestressed concrete cable-stayed bridge construction control[J]. Journal of Tongji University: Natural Science, 2001, 29(1): 99-103. (in Chinese) doi: 10.3321/j.issn:0253-374X.2001.01.021
|
[4] |
YAN Dong-huang, CHEN Chang-song, TU Guang-ya. Temperature influence and its field correction during construction control of concrete cable-stayed bridge[J]. China Journal of Highway and Transport, 2006, 19(4): 71-76. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.04.013
|
[5] |
ZHOU Mi, SONG Yi-fan, ZHAO Xiao-xing. Control technique for construction of prestressed-concrete cantilever casting bridge[J]. Journal of Chang an University: Natural Science Edition, 2005, 25(6): 43-48. (in Chinese) doi: 10.3321/j.issn:1671-8879.2005.06.011
|
[6] |
XU Xing, LI NG Dao-sheng. Degenerated solid elements[J]. Acta Mechanica Solida Sinica, 2001, 22(S): 1-12. (in Chinese)
|
[7] | 肖汝诚. 桥梁结构分析及程序系统[M]. 北京: 人民交通出版社, 2002. |
[8] |
WANG Yi, YE Jian-shu, GU Xiang-feng. Influence of hori-zontal curvature of prestressing tendon in transverse beamson concrete cable-stayed bridge inclined web[J]. Journal of Traffic and Transportation Engineering, 2005, 5(2): 51-55. (in Chinese) doi: 10.3321/j.issn:1671-1637.2005.02.013
|
[9] |
CHEN De-wei, HUANG Da-jian, XI ANG Hai-fan. A newmethod for erecting cantilevers with long suspended flash-work in P. C. cable-stayed bridges[J]. China Civil Engineering Journal, 1996, 29(6): 69-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC199606008.htm
|
[10] | 周念先, 杨共树. 预应力混凝土斜张桥[M]. 北京: 人民交通出版社, 1989. |
[11] |
DI Jin, HUANG Qing. Simulation of construction control forone inclined tower cable-stayed bridge of steel-concrete composite box girder without back stay[J]. Journal of Chang an University: Natural Science Edition, 2004, 24(3): 43-47. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200403011.htm
|
[12] |
DAI Gong-lian, LI De-jian. Spacial analysis of internal forceand stability on cable-stayed bridge without back stay over Liuyang river[J]. China Journal of Highway and Transport, 2002, 15(3): 53-56. (in Chinese) doi: 10.3321/j.issn:1001-7372.2002.03.012
|
[13] |
REDDY P, GHABOUSSI J, HAWKI NS N M. Nonlinear analysis and simulation of construction of cable-stayed bridges[J]. Journal of Bridge Engineering, 1999, 4(4): 249-257. doi: 10.1061/(ASCE)1084-0702(1999)4:4(249)
|