WANG Jing-feng, XU Xing, XIANG Yi-qiang. Method of construction error control for cantilever-casting cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 61-67.
Citation: WANG Jing-feng, XU Xing, XIANG Yi-qiang. Method of construction error control for cantilever-casting cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 61-67.

Method of construction error control for cantilever-casting cable-stayed bridge

More Information
  • Author Bio:

    WANG Jin-feng(1976-), male, associate professor, PhD, +86-571-87951804, wangjfcong@126.com

  • Received Date: 2008-01-11
  • Publish Date: 2008-08-25
  • During the cantilever-casting construction of prestressed concrete(PC) cable-stayed bridge, in order to reduce the errors of cable tension and line shape, the error cause and present situation of control means were analyzed, and the control methods of model error and cantilever-casting simulation error were discussed.With the combination of 3D isoparametric element and shell element, degenerated solid element was proposed for the spatial analysis of complex PC bridge, and discrete bar model was set up.According to the deformation compatibility condition of traction cable's anchorage, the increment of cable tension during casting concrete was computed, and the calculation formula of traveler's front level was educed.Application result indicates that the control precision of trailing cable tension is within 3%, the control precision of final cable tension is within 5%, and the error of traveler's front level is within 1 cm.Therefore, the cable tension and line shape of PC cable-stayed bridge under all construction conditions can be well predicted by the proposed method.

     

  • loading
  • [1]
    HE Xiong-jun, FAN Li-chu, LI Li-ping, et al. Study of prediction control system for construction of bridges with longspans[J]. China Journal of Highway and Transport, 2006, 19(1): 53-57. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.01.011
    [2]
    YI U P K A, BROTTON D M. Computation of fabrication dimensions for cable-stayed bridges[J]. The Structure Engineer, 1988, 66(15): 237-243.
    [3]
    CHEN De-wei, XUJun, ZHOU Zong-ze, et al. New evolution of prestressed concrete cable-stayed bridge construction control[J]. Journal of Tongji University: Natural Science, 2001, 29(1): 99-103. (in Chinese) doi: 10.3321/j.issn:0253-374X.2001.01.021
    [4]
    YAN Dong-huang, CHEN Chang-song, TU Guang-ya. Temperature influence and its field correction during construction control of concrete cable-stayed bridge[J]. China Journal of Highway and Transport, 2006, 19(4): 71-76. (in Chinese) doi: 10.3321/j.issn:1001-7372.2006.04.013
    [5]
    ZHOU Mi, SONG Yi-fan, ZHAO Xiao-xing. Control technique for construction of prestressed-concrete cantilever casting bridge[J]. Journal of Chang an University: Natural Science Edition, 2005, 25(6): 43-48. (in Chinese) doi: 10.3321/j.issn:1671-8879.2005.06.011
    [6]
    XU Xing, LI NG Dao-sheng. Degenerated solid elements[J]. Acta Mechanica Solida Sinica, 2001, 22(S): 1-12. (in Chinese)
    [7] 肖汝诚. 桥梁结构分析及程序系统[M]. 北京: 人民交通出版社, 2002.
    [8]
    WANG Yi, YE Jian-shu, GU Xiang-feng. Influence of hori-zontal curvature of prestressing tendon in transverse beamson concrete cable-stayed bridge inclined web[J]. Journal of Traffic and Transportation Engineering, 2005, 5(2): 51-55. (in Chinese) doi: 10.3321/j.issn:1671-1637.2005.02.013
    [9]
    CHEN De-wei, HUANG Da-jian, XI ANG Hai-fan. A newmethod for erecting cantilevers with long suspended flash-work in P. C. cable-stayed bridges[J]. China Civil Engineering Journal, 1996, 29(6): 69-73. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC199606008.htm
    [10] 周念先, 杨共树. 预应力混凝土斜张桥[M]. 北京: 人民交通出版社, 1989.
    [11]
    DI Jin, HUANG Qing. Simulation of construction control forone inclined tower cable-stayed bridge of steel-concrete composite box girder without back stay[J]. Journal of Chang an University: Natural Science Edition, 2004, 24(3): 43-47. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200403011.htm
    [12]
    DAI Gong-lian, LI De-jian. Spacial analysis of internal forceand stability on cable-stayed bridge without back stay over Liuyang river[J]. China Journal of Highway and Transport, 2002, 15(3): 53-56. (in Chinese) doi: 10.3321/j.issn:1001-7372.2002.03.012
    [13]
    REDDY P, GHABOUSSI J, HAWKI NS N M. Nonlinear analysis and simulation of construction of cable-stayed bridges[J]. Journal of Bridge Engineering, 1999, 4(4): 249-257. doi: 10.1061/(ASCE)1084-0702(1999)4:4(249)

Catalog

    Article Metrics

    Article views (339) PDF downloads(435) Cited by()