WANG Jian, YAO Zhen-qiang, BAO Qi-fan, ZHU Jian-long, LEI Xin-hua, WANG Xiao-ping. New performance evaluation method of grab ship unloader[J]. Journal of Traffic and Transportation Engineering, 2008, 8(5): 38-43.
Citation: WANG Jian, YAO Zhen-qiang, BAO Qi-fan, ZHU Jian-long, LEI Xin-hua, WANG Xiao-ping. New performance evaluation method of grab ship unloader[J]. Journal of Traffic and Transportation Engineering, 2008, 8(5): 38-43.

New performance evaluation method of grab ship unloader

More Information
  • Author Bio:

    WANG Jian (1980-), male, doctoral student, +86-21-34206583, wjconan@yahoo.corn.cn

    YA0 Zhen-qiang (1962-), male, professor, +86-21-34206315, zqyao@SjtU.edu.cn

  • Received Date: 2008-03-26
  • Publish Date: 2008-10-25
  • The productivity calculation methods of different grab ship unloaders were analyzed, the advantages, disadvantages and applicability were compared, a new performance evaluation method was presented based on mechanical performance calculation approaches.The validity rules of testing record were established, some modified coefficients were defined to eliminate the influence of uncertain factors such as material attributes and operation conditions.Calculation result shows that the rating productivity of automatic operation mode is increased by 3.12% than that of manumal mode, and actual productivity is increased by 7.97%, so the evaluation result is acturate, and the new method can easily compare the automation degrees of different manipulation modes.

     

  • loading
  • [1]
    ZHAO Hai-yan. Productivity analysis on bridge grab shipunloader[J]. Heavy Industrial and Hoisting Machinery, 2007, 4(2): 16-17. (in Chinese)
    [2]
    YAN Li, ZHU Xin-he, YAN Zhi-jun, et al. The status and prospect of transportation machine equipment repairing in 21th century[J]. Journal of Traffic and Transportation Engineering, 2001, 1(2): 47-51. (in Chinese) http://transport.chd.edu.cn/article/id/200102013
    [3]
    ZHAI Lin. Rational calculation on productivity of grab shipunloader[J]. Science and Technology of Ports, 1998, 20(1): 9-11. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GKKJ199801003.htm
    [4] GB/T3811—1983, 起重机设计规范[S].
    [5] GB 5905—1986, 起重机试验规范和程序[S].
    [6] GB/T14838—2001, 港口起重机验收试验规则[S].
    [7]
    JIS B8809—2004, calculationfor unloading capacity of unloader[S].
    [8]
    XU Da-wei. Discussion on actual productivity of grab shipunloader[J]. Shanghai Port Technology, 2000(2): 1-3. (in Chinese)
    [9]
    LI Lu-mei, WANG Yue-min. Calculation of double-hopper grab ship unloader[J]. Hoisting and Conveying Machinery, 2007(7): 48-52. (in Chinese) doi: 10.3969/j.issn.1001-0785.2007.07.017
    [10]
    ZHEN Hong. Conception of fourth generation port and itsi mplementation methods[J]. Journal of Traffic and Transportation Engineering, 2005, 5(4): 90-95. (in Chinese) http://transport.chd.edu.cn/article/id/200504019
    [11] 肖汉斌, 雷新华, 王小平, 等. 上海港罗泾矿石码头装卸装备单机与综合作业能力测试检验报告[R]. 武汉: 武汉港口机械质量监督检验测试中心, 2008.

Catalog

    Article Metrics

    Article views (432) PDF downloads(310) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return