MA Cheng-lin, MAO Hai-jun, LI Xu-hong. Internal function area layout method of logistics park[J]. Journal of Traffic and Transportation Engineering, 2008, 8(6): 116-121.
Citation: MA Cheng-lin, MAO Hai-jun, LI Xu-hong. Internal function area layout method of logistics park[J]. Journal of Traffic and Transportation Engineering, 2008, 8(6): 116-121.

Internal function area layout method of logistics park

More Information
  • Author Bio:

    MA Cheng-lin (1982-), male, doctoral student, +86-25-83795284, ms0127@126.com

    LI Xu-hong (1963-), male, professor, +86-25-83793685, lixuhong@seu.edu.cn

  • Received Date: 2008-06-13
  • Publish Date: 2008-12-25
  • In order to avoid the service failure of logistics park because of its unreasonable internal functional area layout, its external conditions and internal factors were analyzed, its service reliability evaluation index system was established, and an internal layout method was put forward based on service reliability, fuzzy clustering theory and AutoMod simulation technology were applied, the qualitative analysis and quantitative account of logistics park were carried out, and the static and dynamic simulations of its layout project were realized. Analysis result shows that in logistics park, possible traffic jam is found, warehouse utilization ratio is improved, and the collaboration among functional areas is strengthened. Withal, the planning method has few subjective factors and high reliability, and is easily quantifiable and maneuverable.

     

  • loading
  • [1]
    ROSENBLATT M J. The dynamics of plant layout[J]. Management Science, 1986, 32(1): 76-86. doi: 10.1287/mnsc.32.1.76
    [2]
    GOMEZ A, FERNANDEZ Q I, GARCI A D D L, et al. Using genetic algorithms to resolve layout problems in facili-ties where there are aisles[J]. International Journal of Pro-duction Economics, 2003, 84(3): 271-282. doi: 10.1016/S0925-5273(02)00468-1
    [3]
    TAM K Y. Genetic algorithms, function opti mization, and facility layout design[J]. European Journal of Operational Research, 1992, 63(2): 322-346. doi: 10.1016/0377-2217(92)90034-7
    [4]
    ROSENBLATT MJ, KROPP D H. The single period sto-chastic plant layout problem[J]. IIE Transactions, 1992, 24(1): 169-176. https://www.sciencedirect.com/science/article/pii/S0360835211000155
    [5]
    JERRY B. Cetting Started with Auto Mod[M]. Salt Lake City: Brooks Automation, 2004.
    [6]
    MAJ, FANZ P, HUANG L H. Subjective and objectiveinte-grated approach to determine attribute weights[J]. European Journal of Operation Research, 1999, 112(2): 397-404. doi: 10.1016/S0377-2217(98)00141-6
    [7]
    NOZICK L K, TURNQUIST M A. Inventory, transportation, service quality and the location of distribution centers[J]. European Journal of Operational Research, 2001, 129(2): 362-371. doi: 10.1016/S0377-2217(00)00234-4
    [8]
    MURATA T, ISHIBUCHI H, TANAKA H. Multi-objective genetic algorithmandits applications to flowshop scheduling[J]. Computer Industry Engineering, 1996, 30(4): 957-968. https://www.sciencedirect.com/science/article/abs/pii/0360835296000459

Catalog

    Article Metrics

    Article views (404) PDF downloads(523) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return