WANG Ping, LIU Hao, WEI Xian-kui, XIAO Jie-ling. Analysis of longitudinal force regulation for CWR on railway cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2013, 13(5): 27-32.
Citation: WANG Ping, LIU Hao, WEI Xian-kui, XIAO Jie-ling. Analysis of longitudinal force regulation for CWR on railway cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2013, 13(5): 27-32.

Analysis of longitudinal force regulation for CWR on railway cable-stayed bridge

More Information
  • Author Bio:

    WANG Ping(1969-), male, professor, +86-28-87601210, wping@home.swjtu.edu.cn

  • Received Date: 2013-03-18
  • Publish Date: 2013-10-25
  • Based on the theory of track-bridge interaction, the calculation model of longitudinal force for continuous welded rail (CWR) on cable-stayed bridge was established, and the related calculation software was compiled.Taking a double-tower steel truss cable-stayed bridge commonly used in the railway as an example, the longitudinal force regulations of CWR were analyzed.Analysis result shows that the cable-stayed bridge can be simplified as a continuous beam with fixed bearing in the middle to calculate rail expansion forces.Rail bending forces can be calculated under the conditions of loads laid on main span and its adjacent span or the separate main span, and the direction change of train needn't be considered.Speed locking devices should be set on railway cable-stayed bridge to effectively limit the main beam longitudinal displacement under train braking force, and rail deformation decreases simultaneously.The method of trackbridge interaction should be used for cable-stayed bridge with CWR to calculate rail broken gap value accurately.

     

  • loading
  • [1]
    徐庆元. 高速铁路桥上无缝线路纵向附加力三维有限元静力与动力分析研究[D]. 长沙: 中南大学, 2005.

    XU Qing-yuan. Static and dynamic 3Dfinite element analysis of additional longitudinal forces transmission between CWR and high-speed railway bridges[D]. Changsha: Central South University, 2005. (in Chinese).
    [2]
    徐庆元, 陈秀方, 李树德. 高速铁路桥上无缝线路纵向附加力研究[J]. 中国铁道科学, 2006, 27 (3): 8-12. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200603001.htm

    XU Qing-yuan, CHEN Xiu-fang, LI Shu-de. Study on the additional longitudinal forces transmission between continuously welded rails and high-speed railway bridges[J]. China Railway Science, 2006, 27 (3): 8-12. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200603001.htm
    [3]
    张建. 刚构桥上无缝线路的ANSYS分析及二次开发[D]. 长沙: 中南大学, 2007.

    ZHANG Jian. ANSYS analysis and secondary exploitation of CWR on rigid frame bridge[D]. Changsha: Central South University, 2007. (in Chinese).
    [4]
    李秋义, 孙立. 桥墩温差荷载引起的桥上无缝线路钢轨附加力[J]. 中国铁道科学, 2007, 28 (4): 50-54. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200704012.htm

    LI Qiu-yi, SUN Li. Additional longitudinal force of CWR track on bridge caused by temperature difference between one side and another side of pier[J]. China Railway Science, 2007, 28 (4): 50-54. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200704012.htm
    [5]
    魏贤奎, 陈小平, 王平. 有砟轨道基础桥上无缝线路计算软件开发及应用[J]. 铁道建筑, 2010 (8): 115-118. https://www.cnki.com.cn/Article/CJFDTOTAL-TDJZ201008037.htm

    WEI Xian-kui, CHEN Xiao-ping, WANG Ping. Development and application of calculation software of CWR with ballasted track on bridges[J]. Railway Engineering, 2010 (8): 115-118. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDJZ201008037.htm
    [6]
    RUGE P, BIRK C. Longitudinal forces in continuously welded rails on bridge decks due to nonlinear track-bridge interaction[J]. Computers and Structures, 2007, 85 (7/8): 458-475.
    [7]
    RUGE P, WIDARDA D R, SCHMALZLIN G, et al. Longitudinal track-bridge interaction due to sudden change of coupling interface[J]. Computers and Structures, 2009, 87 (1/2): 47-58.
    [8]
    李志辉. 铁路高墩、大跨、长联简支梁桥上无缝线路桥墩纵向水平线刚度优化[D]. 长沙: 中南大学, 2011.

    LI Zhi-hui. The optimization of pier longitudinal linear stiffness of CWR on railway simply supported bridges with highpier, long span and large-length[D]. Changsha: Central South University, 2011. (in Chinese).
    [9]
    BATTINI J M, MAHIR U K. A simple finite element to consider the non-linear influence of the ballast on vibrations of railway bridges[J]. Engineering Structures, 2011, 33 (9) 2597-2602. doi: 10.1016/j.engstruct.2011.05.005
    [10]
    朱彬. 大跨度钢箱混合梁斜拉桥无缝线路设计研究[J]. 铁道标准设计, 2012 (2): 4-6, 15. https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201202004.htm

    ZHU Bin. Design of continuous welded rail upon long span cablestayed bridge with steel-concrete composite box beam[J]. Railway Standard Design, 2012 (2): 4-6, 15. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201202004.htm
    [11]
    闫斌, 戴公连. 高速铁路斜拉桥上无缝线路纵向力研究[J]. 铁道学报, 2012, 34 (3): 83-87. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201203019.htm

    YAN Bin, DAI Gong-lian. CWR longitudinal force of cablestayed bridge of high-speed railway[J]. Journal of the China Railway Society, 2012, 34 (3): 83-87. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201203019.htm
    [12]
    闫斌, 戴公连, 董林育. 客运专线斜拉桥梁轨相互作用设计参数[J]. 交通运输工程学报, 2012, 12 (1): 31-37. http://transport.chd.edu.cn/article/id/201201006

    YAN Bin, DAI Gong-lian, DONG Lin-yu. Design parameters of track-bridge interaction on passenger dedicated line cablestayed bridge[J]. Journal of Traffic and Transportation Engineering, 2012, 12 (1): 31-37. (in Chinese). http://transport.chd.edu.cn/article/id/201201006
    [13]
    赵卫华. 斜拉桥上无缝线路设计计算方法研究[D]. 成都: 西南交通大学, 2010.

    ZHAO Wei-hua. A study of calculation method of CWR on cable-stayed bridge[D]. Chengdu: Southwest Jiaotong University, 2010. (in Chinese).
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (940) PDF downloads(787) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return