Citation: | ZHANG Hong-liang, CHEN Jiang, SU Man-man, LI Ning-li. Mix proportion design method with multiple indexes for continuously reinforced concrete[J]. Journal of Traffic and Transportation Engineering, 2014, 14(1): 11-17. |
[1] |
ZOLLINGER D G, BUCH N, XIN D P, et al. Performance of continuously reinforced concrete pavements, volume VI—CRC pavement design, construction, and performance[R]. McLean: Federal Highway Administration, 1999.
|
[2] |
SELEZNEVA O I, DARTER M I, ZOLLINGER D G, et al. Characterization of transverse cracking spatial variability using LTPP data for CRCP design[J]. Transportation Research Record, 2003 (1849): 147-155.
|
[3] |
Transportation Research Board. Guide for mechanistic-empirical design of new and rehabilitated pavement structures[R]. Washington DC: Transportation Research Board, 2004.
|
[4] |
SUH Y C, HANKINS K, MCCULLOUGH B F. Early-age behavior of continuously reinforced concrete pavement and calibration of the failure prediction model in the CRCP-7Program[R]. Austin: University of Texas at Austin, 1992.
|
[5] |
JIMENEZ M A, MCCULLOUGH B F, HANKINS K. Monitoring of siliceous river gravel and limestone continuously reinforced concrete pavement test sections in Houston 2years after placement, and development of a crack width model for the CRCP-7program[R]. Austin: University of Texas at Austin, 1992.
|
[6] |
CHO Y H, DOSSEY T, MCCULLOUGH B F. Early age performance of continuously reinforced concrete pavement with different types of aggregate[J]. Transportation Research Record, 1997 (1568): 35-43.
|
[7] |
JOHNSTON D P, SURDAHL R W. Influence of mixture design and environmental factors on continuously reinforced concrete pavement cracking[J]. Transportation Research Record, 2007 (2020): 83-88.
|
[8] |
JOHNSTON D P, SURDAHL R W. Effects of base type on modeling long-term pavement performance of continuously reinforced concrete sections[J]. Transportation Research Record, 2006 (1979): 93-101.
|
[9] |
Federal Highway Administration. Evaluating the use of fiberreinforced polymer bars in continuously reinforced concrete pavement[R]. McLean: Federal Highway Administration, 2009.
|
[10] |
王衍辉. 连续配筋混凝土路面横向裂缝分布预估研究[D]. 西安: 长安大学 , 2010.
WANG Yan-hui. Study on predicting transverse cracks distribution of continuously reinforced concrete pavement[D]. Xi'an: Chang'an University, 2010. (in Chinese).
|
[11] |
左志武, 张洪亮, 陈江. 连续配筋混凝土路面性能参数影响的试验[J]. 长安大学学报: 自然科学版, 2010, 30 (1): 23-29. https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL201001007.htm
ZUO Zhi-wu, ZHANG Hong-liang, CHEN Jiang. Test of effects of parameters on continuously reinforced concrete pavement (CRCP) performance[J]. Journal of Chang'an University: Natural Science Edition, 2010, 30 (1): 23-29. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL201001007.htm
|
[12] |
查旭东. 连续配筋混凝土路面横向开裂发展规律[J]. 交通运输工程学报, 2008, 8 (2): 65-68. http://transport.chd.edu.cn/article/id/200802014
ZHA Xu-dong. Development laws of transverse cracking for continuously reinforced concrete pavement[J]. Journal of Traffic and Transportation Engineering, 2008, 8 (2): 65-68. (in Chinese). http://transport.chd.edu.cn/article/id/200802014
|
[13] |
查旭东. 连续配筋混凝土路面横向开裂的敏感性分析[J]. 铁道科学与工程学报, 2008, 5 (2): 64-70. https://www.cnki.com.cn/Article/CJFDTOTAL-CSTD200802014.htm
ZHA Xu-dong. Sensitivity analysis of transverse cracking for continuously reinforced concrete pavement[J]. Journal of Railway Science and Engineering, 2008, 5 (2): 64-70. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-CSTD200802014.htm
|
[14] |
王衍辉, 徐士翠. 连续配筋混凝土路面收缩应力及参数敏感性分析[J]. 中外公路, 2012, 32 (3): 90-95. https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL201203021.htm
WANG Yan-hui, XU Shi-cui. Analysis of shrinkage stress and parameter sensitivity for continuously reinforced concrete pavement[J]. Journal of China and Foreign Highway, 2012, 32 (3): 90-95. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL201203021.htm
|
[15] |
陈江. 连续配筋混凝土配合比设计方法及施工技术研究[D]. 西安: 长安大学, 2010.
CHEN Jiang. Research on construction technique and mix design method of continuously reinforced concrete[D]. Xi'an: Chang'an University, 2010. (in Chinese).
|
[16] |
JTG F30—2003, 公路水泥混凝土路面施工技术规范[S].
JTG F30—2003, technical specification for construction of highway cement concrete pavements[S]. (in Chinese).
|
[17] |
赵亚兰, 陈拴发. 连续配筋混凝土基层沥青路面层间剪应力分析[J]. 筑路机械与施工机械化, 2010, 27 (4): 45-48. https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201004035.htm
ZHAO Ya-lan, CHEN Shuan-fa. Analysis of interlayer shear stress for continuously reinforced concrete base asphalt pavement[J]. Road Machinery and Construction Mechanization, 2010, 27 (4): 45-48. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201004035.htm
|
[18] |
高莉春, 谭利华. 高性能混凝土拌和用水温度控制[J]. 筑路机械与施工机械化, 2012, 29 (9): 47-49. https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201209029.htm
GAO Li-chun, TAN Li-hua. Temperature control of mixing water for high performance concrete[J]. Road Machinery and Construction Mechanization, 2012, 29 (9): 47-49. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZLJX201209029.htm
|