Citation: | WANG Hong-gang, ZHANG Yi-jun, ZHANG Qi, WANG Zhuang-feng. Train operation adjustment on Jing-Hu high-speed railway[J]. Journal of Traffic and Transportation Engineering, 2004, 4(1): 66-69. |
[1] |
李琴. 京沪高速铁路综合调度系统技术条件的研究[R]. 北京: 铁道科学研究院, 2003.
|
[2] |
何邦模. 高速铁路综合调度系统用户需求研究报告[R]. 北京: 铁道科学研究院, 2002.
|
[3] |
NIE Lei, ZHANG Xing-chen. Study on the strategy of train operation adjustment on high speed railway[J]. Journal of the China Railway Society, 2001, 23(4): 1-6. (in Chinese)
|
[4] |
TANG Qi-zhi, SHI Hao. Discussion of the train operation adjustment problem on the Jing-Hu high speed railway[J]. China Railway, 2001, 12(1): 37-38. (in Chinese)
|
[5] |
WU Wen-lin. Computer driving command system[J]. Railway Communication Signal, 1994, 30(9): 34-36. (in Chinese)
|
[6] |
PU Yun, ZHANG Dian-ye. Study on Chinese train operation dispatch manage intelligent systems[J]. World Science-Technology Research and Development, 2000, 21(3): 45-47. (in Chinese)
|
[7] |
PIAO Ai-hua, HU An-zhou. Study of the train operation organizing on Chinese high speed railway[J]. Journal of the China Railway Society, 1996, 18(3): 105-110. (in Chinese)
|
[8] |
杨浩, 何世伟. 铁路运输组织学[M]. 北京: 中国铁道出版社, 2001.
|