Improved model of area capacity based on flight flow coupling
-
摘要: 研究了包括多个扇区的区域容量评估问题, 通过分析飞行流量在空域单元之间产生耦合约束因素, 提出了空域单元的耦合容量, 研究了区域耦合容量的影响因素。结合管制员工作负荷等限制建立了区域耦合容量的多目标整数规划模型, 并使用该模型计算了兰州区域各空域单元耦合容量。计算结果表明: 扇区1、2、3耦合容量分别为22、19、33架次.h-1, 小于其最大容量; 区域耦合容量小于区域仿真容量评估结果, 因此, 该模型更有利于合理分配空域资源。Abstract: The capacity evaluating problem of area with several sectors was studied, and the limitation of flight flow coupling existing between airspace units was analyzed.The coupling capacities of airspace units were defined, and their influecing factors were analyzed.A multi-objective integral optimization model of area coupling capacity under the constraints of controller workload was presented, and was used to calculate the coupling capacities of airspace units in Lanzhou area.Analysis result shows that the coupling capacities of sectors 1, 2, 3 are 22, 19, 33 flights·h-1, which are less than their max capacities, and the area coupling capacity is less than the simulation evaluation result.Therefore, the model is more advantageous to distribute airspace resources.
-
表 1 试验参数
Table 1. Experiment parameters
航路序号 航路类型 航班流比例 工作负荷/s 飞行间隔/min 扇区1 扇区2 扇区3 1.1 耦合 0.135 27.1 17.7 50.5 10 1.2 0.226 26.5 19.8 47.8 2.1 0.283 19.1 0.0 50.5 2.2 0.371 18.5 0.0 47.8 3.1 0.310 27.1 26.5 50.5 3.2 0.062 26.5 30.1 47.8 4.1 0.032 24.0 0.0 50.5 4.2 0.026 24.0 0.0 50.5 5.1 0.022 0.0 34.8 44.9 5.2 0.088 0.0 37.3 30.0 6.1 0.042 0.0 45.9 44.9 6.2 0.088 0.0 47.5 30.0 7.1 0.042 0.0 34.8 44.9 7.2 0.000 0.0 34.8 44.9 8.1 0.084 27.1 17.7 24.3 8.2 0.100 16.5 19.8 30.5 9.1 0.010 19.1 0.0 42.8 9.2 0.012 18.5 0.0 41.3 10.1 飞越 0.042 0.0 0.0 137.1 10.2 0.026 0.0 0.0 135.2 表 2 奇数高度层航路段耦合容量
Table 2. Coupling-capacities of route segments on odd flight levels
架次·h-1 扇区号 航路号 1 2 3 4 5 6 7 8 9 10 1 2 4 1 1 0 0 0 2 1 0 2 2 0 1 0 3 2 0 2 0 0 3 2 4 1 1 3 2 0 2 1 1 表 3 偶数高度层航路段耦合容量
Table 3. Coupling-capacities of route segments on even flight levels
架次·h-1 扇区号 航路号 1 2 3 4 5 6 7 8 9 10 1 2 4 2 1 0 0 0 1 1 0 2 2 0 2 0 2 1 1 1 0 0 3 2 4 2 1 2 1 1 1 1 1 -
[1] 王艳军. 区域空中交通容量动态评估研究[D]. 南京: 南京航空航天大学, 2007.WANG Yan-jun. Research on dynamic evaluation of area airspace capacity[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2007. (in Chinese) [2] 蒋兵. 空域评估模型与方法研究[D]. 南京: 南京航空航天大学, 2002.JI ANG Bing. The research on the model and method of airspace evaluation[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2002. (in Chinese) [3] 蒋兵, 胡明华, 田勇, 等. 机场跑道容量评估模型和估计方法的进一步研究[J]. 交通运输工程学报, 2003, 3 (2): 80-83. doi: 10.3321/j.issn:1671-1637.2003.02.018JI ANG Bing, HU Ming-hua, TI AN Yong, et al. Further research of airport runway capacity evaluation[J]. Journal of Traffic and Transportation Engineering, 2003, 3 (2): 80-83. (in Chinese) doi: 10.3321/j.issn:1671-1637.2003.02.018 [4] 常茂军. 机场终端区容量动态预测方法研究[D]. 南京: 南京航空航天大学, 2007.CHANG Mao-jun. Research on the method of airport terminal airspace capacity dynamic estimation[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2007. (in Chinese) [5] 刘欢. 区域空中交通容量动态评估研究[D]. 南京: 南京航空航天大学, 2009.LI U Huan. Research on dynamic evaluation of area airspace capacity[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2009. (in Chinese) [6] MITCHELL J S B, POLISHCHUK V, KROZEL J. Airspace throughput analysis considering stochastic weather[R]. Colorado: AIAA Guidance, Navigation, and Control Conference and Exhibit, 2006. [7] KROZEL J, MITCHELL J S B, POLISHCHUK V, et al. Capacity estimation for airspaces with convctive weather constraints[R]. Hilton Head: AI AA Guidance, Navigation, and Control Conference and Exhibit, 2007. [8] 余静, 刘洪, 熊运余, 等. 一种改进的航路动态容量计算模型[J]. 四川大学学报: 自然科学版, 2007, 44 (5): 1005-1008. doi: 10.3969/j.issn.0490-6756.2007.05.017YUJing, LI U Hong, XIONG Yun-yu, et al. An improved evaluation model of en route dynamic capacity[J]. Journal of Sichuan University: Natural Science Edition, 2007, 44 (5): 1005-1008. (in Chinese) doi: 10.3969/j.issn.0490-6756.2007.05.017 [9] LI UFang-qin, HU Ming-hua. Airspace capacity management based on control workload and coupling constraints between airspaces[C]//IEEE. Proceedings of2009International Conference on Computer Modeling and Simulation. Macao: IEEE Computer Society, 2009: 329-334. [10] 裴成功, 韩松臣, 刘星. 管制员工作负荷评估的回归分析法[J]. 南京航空航天大学学报, 2007, 39 (1): 107-112. https://www.cnki.com.cn/Article/CJFDTOTAL-NJHK200701022.htmPEI Cheng-gong, HAN Song-chen, LI U Xing. Regression analysis method for evaluating ATC controller workload[J]. Journal of Nanjing University of Aeronautics and Astronautics, 2007, 39 (1): 107-112. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-NJHK200701022.htm [11] FLYNN G, BENKOUAR A, CHRISTIEN R. Pessimistic sector capacity estimation[R]. Paris: EUROCONTROL Experimental Centre, 2003. -
下载: