Citation: | ZHANG Luo-li, CAI Liang-cai, ZHONG Xiao-lei, DU Yi-lin, WANG Xiao-hui, ZHANG Zhong-ling. Application of GIS and multiple attribute decision theory in highway runway locating[J]. Journal of Traffic and Transportation Engineering, 2010, 10(5): 66-70. doi: 10.19818/j.cnki.1671-1637.2010.05.012 |
[1] |
黄伟业, 仁廷兵, 俞宁一. 应加快高速公路飞机跑道建设[J]. 国防, 2002(8): 47-48. doi: 10.3969/j.issn.1002-4484.2002.08.027
HUANG Wei-ye, REN Ting-bing, YU Ning-yi. Promoting the construction of highway runway[J]. National Defence, 2002(8): 47-48. (in Chinese) doi: 10.3969/j.issn.1002-4484.2002.08.027
|
[2] |
康亚林, 邱延俊, 张波. 新建高速公路跑道几何参数的研究[J]. 铁道建筑, 2007(2): 106-108. doi: 10.3969/j.issn.1003-1995.2007.02.041
KANG Ya-lin, QIU Yan-jun, ZHANG Bo. Research on geometric parameters of newly-built highway runway[J]. Railway Engineering, 2007(2): 106-108. (in Chinese) doi: 10.3969/j.issn.1003-1995.2007.02.041
|
[3] |
周桂新. 浅谈高速公路军用飞机跑道建设及养护管理[J]. 甘肃科技, 2003, 19(9): 102-103. doi: 10.3969/j.issn.1000-0952.2003.09.056
ZHOU Gui-xin. On construction and maintenance management of highway runway from relying[J]. Gansu Science and Technology, 2003, 19(9): 102-103. (in Chinese) doi: 10.3969/j.issn.1000-0952.2003.09.056
|
[4] |
高和生, 韦武举, 戴鹏, 等. 高等级公路改建飞机跑道加铺层材料性能试验研究[J]. 国防交通工程与技术, 2007(4): 21-24. https://www.cnki.com.cn/Article/CJFDTOTAL-GFJT200704010.htm
GAO He-sheng, WEI Wu-ju, DAI Peng, et al. Experimental research into the performance of over-laid materials for high-grade pavement transformed into airstrip[J]. Traffic Engineering and Technology for National Defence, 2007(1): 21-24. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GFJT200704010.htm
|
[5] |
王金华, 岑国平. 公路飞机跑道改建各基本要素研究[J]. 国防交通工程与技术, 2005(1): 6-9, 13. doi: 10.3969/j.issn.1672-3953.2005.01.002
WANG Jin-hua, CEN Guo-ping. A summary of the research into various factors in rebuilding highways into airfield runways[J]. Traffic Engineering and Technology for National Defence, 2005(1): 6-9, 13. (in Chinese) doi: 10.3969/j.issn.1672-3953.2005.01.002
|
[6] |
MCNERNEY M T, RIOUX T. Geographic information system (GIS)needsassessment for txdot pavement management information systems[R]. Austin: The University of Texas at Austin, 2000.
|
[7] |
暨育雄, 阚胜男, 孙立军, 等. 基于GIS的机场道面管理系统[J]. 交通运输工程学报, 2004, 4(1): 70-74. doi: 10.3321/j.issn:1671-1637.2004.01.018
JI Yu-xiong, KAN Sheng-nan, SUN Li-jun, et al. Airport pavement management system based on GIS[J]. Journal of Traffic and Transportation Engineering, 2004, 4(1): 70-74. (in Chinese) doi: 10.3321/j.issn:1671-1637.2004.01.018
|
[8] |
徐泽水. 求解不确定型多属性决策问题的一种新方法[J]. 系统工程学报, 2002, 17(2): 177-181. doi: 10.3969/j.issn.1000-5781.2002.02.015
XU Ze-shui. New method for uncertain multi-attribute decision making problems[J]. Journal of Systems Engineering, 2002, 17(2): 177-181. (in Chinese) doi: 10.3969/j.issn.1000-5781.2002.02.015
|
[9] |
贾宏, 周波, 刘广兵. 基于层次分析法的风险模型优势分析[J]. 西南交通大学学报, 2009, 44(1): 72-76. doi: 10.3969/j.issn.0258-2724.2009.01.014
JIA Hong, ZHOU Bo, LIU Guang-bing. Advantage analysis of risk model based on analytic hierarchy process[J]. Journal of Southwest Jiaotong University, 2009, 44(1): 72-76. (in Chinese) doi: 10.3969/j.issn.0258-2724.2009.01.014
|
[10] |
荆洪英, 张利, 闻邦椿. 基于层次分析法的产品设计质量权重分配[J]. 东北大学学报: 自然科学版, 2009, 30(5): 712-715. https://www.cnki.com.cn/Article/CJFDTOTAL-DBDX200905026.htm
JING Hong-ying, ZHANG Li, WEN Bang-chun. AHP-based assignment of weight in product design quality[J]. Journal of Northeastern University: Natural Science, 2009, 30(5): 712-715. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-DBDX200905026.htm
|
[11] |
滕兆新, 张旭. 基于理想点的仿真结果评估[J]. 系统仿真学报, 2008, 20(5): 1377-1379. https://www.cnki.com.cn/Article/CJFDTOTAL-XTFZ200805068.htm
TENG Zhao-xin, ZHANG Xu. Evaluation for simulation result based on ideal point[J]. Journal of System Simulation, 2008, 20(5): 1377-1379. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XTFZ200805068.htm
|
[12] |
ZHANG Ji-jun, WU De-sheng, OLSON D L. The method of grey related analysis to multiple attribute decision making problems with interval numbers[J]. Mathematical and Computer Modelling, 2005, 42(9/10): 991-998.
|
[13] |
杨明, 阳亮. 主成分分析法在高速公路沥青路面使用性能评价中的应用[J]. 中南公路工程, 2006, 31(6): 55-57, 89. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL200606014.htm
YANG Ming, YAGN Liang. Application of primary component analysis to the evaluation of expressway asphalt pavement life[J]. Central South Highway Engineering, 2006, 31(6): 55-57, 89. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGL200606014.htm
|
[14] |
俞峰, 杨成梧. 基于熵权的图像分割性能灰色评判[J]. 兵工学报, 2008, 29(8): 930-934. doi: 10.3321/j.issn:1000-1093.2008.08.008
YU Feng, YANG Cheng-wu. Entropy weight-based grey evaluation of performance of image segmentation[J]. Acta Armamentarii, 2008, 29(8): 930-934. (in Chinese) doi: 10.3321/j.issn:1000-1093.2008.08.008
|
[15] |
邹进, 张勇传. 三峡梯级电站短期优化调度的模糊多目标动态规划[J]. 水利学报, 2005, 36(8): 925-931. doi: 10.3321/j.issn:0559-9350.2005.08.006
ZOU Jin, ZHAGN Yong-chuan. Short-term optimal scheduling of cascade hydropower stations using fuzzy multi-objective dynamic programming[J]. Journal of Hydraulic Engineering, 2005, 36(8): 925-931. (in Chinese) doi: 10.3321/j.issn:0559-9350.2005.08.006
|