Citation: | XU Ya-hua, FENG Li-guang. Situation and strategy planning of public transit priority development[J]. Journal of Traffic and Transportation Engineering, 2010, 10(6): 64-68. doi: 10.19818/j.cnki.1671-1637.2010.06.011 |
[1] |
YU Bin, LI U Hong-ting, YAN Bo, et al. Bi-level model forbus route network opti mization and its solution[J]. Journalof Jilin University: Engineering and Technology Edition, 2010, 40(2): 402-405. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JLGY201002020.htm
|
[2] |
ZHAOJian-qiang. Abrief overviewof public transport integration and terminal designs[J]. Urban Transport of China, 2010, 8(5): 18-21. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CSJT201005009.htm
|
[3] |
XU Hong-feng, LI Ke-ping, ZHENG Ming-ming. Isolated transit signal priority control strategy based onlogic rule[J]. China Journal of Highway and Transport, 2008, 21(5): 96-102. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200805019.htm
|
[4] |
WANG Chen, CHENJun. Game theory model for choice ofpublic transportation priority scenarios[J]. Journal of Transportation Systems Engineering and Information Technology, 2008, 8(5): 107-113. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSXT200805019.htm
|
[5] |
TENG Jing, YANG Xiao-guang. Information system formanaging urban public transit service: demand analysis andfunctional design[J]. Urban Transport of China, 2010, 8(3): 72-78. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CSJT201003017.htm
|
[6] |
LI U Xiao-ming. Advancing a scientific development of trans-portation to construct a transit-oriented Beijing[J]. UrbanTransport of China, 2009, 7(6): 1-7. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CSJT200906003.htm
|
[7] |
YAN Hai, YAN Bao-jie. Strategy of urban public trafficdevelopment in China[J]. Journal of Chang an University: Natural Science Edition, 2004, 24(1): 72-75. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200401018.htm
|
[8] |
CHEN Kuan-min, WANG Jian-jun, YI NJian-jun. Strategicplan and current situation analysis of public transit in Xi anCity[J]. Journal of Chang an University: Natural ScienceEdition, 2002, 22(6): 69-74. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL200206018.htm
|
[9] |
QUAN Yong-shen, PAN Zhao-yu. Development of urban transportation planning: looks back and ahead at 60th anni-versary of P. R. China[J]. Urban Transport of China, 2009, 7(5): 1-7. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CSJT200905003.htm
|
[10] |
LI Yan-hong, YUAN Zhen-zhou, CHEN Jing-yun, et al. Combined capacity opti mization of comprehensive transportation corridor based on multi-objective decision making[J]. Journal ofJinlin University: Engineering and Technology Edition, 2009, 39(6): 1480-1485. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JLGY200906012.htm
|
[11] |
YANG Fan, YANG Qi, ZHANG Jun, et al. Public transit pricing and opti mal government compensation models[J]. Journal of Traffic and Transportation Engineering, 2010, 10(2): 110-115. (in Chinese) http://transport.chd.edu.cn/article/id/201002020
|
[12] |
TONG Yun-huan. Opti mal fare-pricingfor urban rapid-trans-port line project and government compensation[J]. SystemsEngineering-Theory and Practice, 2001, 21(4): 88-91. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL200104018.htm
|
[13] |
HUANG Hai-jun, BELL M G H, YANG Hai. Pricing andmodal split in a competitive system of mass transit and high-way[J]. Journal of Management Sciences in China, 1998, 1(2): 17-23. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JCYJ199802003.htm
|