ZHANG Ying-gui, LEI Ding-you, WANG Juan. Decision support system of track utilization with CTC at railway passenger station[J]. Journal of Traffic and Transportation Engineering, 2011, 11(4): 89-96. doi: 10.19818/j.cnki.1671-1637.2011.04.014
Citation: ZHANG Ying-gui, LEI Ding-you, WANG Juan. Decision support system of track utilization with CTC at railway passenger station[J]. Journal of Traffic and Transportation Engineering, 2011, 11(4): 89-96. doi: 10.19818/j.cnki.1671-1637.2011.04.014

Decision support system of track utilization with CTC at railway passenger station

doi: 10.19818/j.cnki.1671-1637.2011.04.014
More Information
  • Author Bio:

    ZHANG Ying-gui(1984-), male, doctoral student, +86-731-82655931, xb9966@163.com

    LEI Ding-you(1958-), male, professor, +86-731-82655931, ding@mail.csu.edu.cn

  • Received Date: 2011-03-27
  • Publish Date: 2011-08-25
  • With station autonomy machine, interlocking system, various technological operations and their requirements of track utilization at railway passenger station, the system model, functions and structure were designed based on the principle of decentralized and self-regulated control. The real-time adjustment controllable scheduling model and coupled model of track utilization were constructed by utilizing modern scheduling theory. The three-step algorithm of synthesis dispatching rules and the general heuristic algorithm of track utilization were put forward to solve the series decision problems of track utilization and disturbance problems among technical and shunting operations. A decision support system of track utilization with centralized traffic control (CTC) at railway passenger stations was developed. Analysis result indicates that the means optimum solution of synthesis dispatching rules is much better than that of basic dispatching rules, and the synthesis dispatching rule EDD+FIFO can get the best solution. The synthesis dispatching rules, especially EDD+FIFO, should be adopted to make real-time adjustment plan, while various dispatching rules should be applied to solve track utilization coupled problem. So the system functions, performances and technical parameters can meet the practical needs for making track utilization plan and real-time adjustment plan at railway passenger station intelligently.

     

  • loading
  • [1]
    XU Cheng, XU Rui-hua, CHENG Wei-sheng, et al. Research of the CTC systemof the Jiaoji Track Line[J]. Journal of the China Railway Society, 2007, 29 (1): 7-15. (in Chinese) doi: 10.3321/j.issn:1001-8360.2007.01.002
    [2]
    WANG Jian-ying. Railway traffic dispatching control simulation system[J]. China Railway Science, 2007, 28 (5): 110-116. (in Chinese) doi: 10.3321/j.issn:1001-4632.2007.05.021
    [3]
    ODIJK M A. Sensitivity analysis of a railway station track layout with respect to a giventi metable[J]. European Journal of Operational Research, 1999, 112 (3): 517-530. doi: 10.1016/S0377-2217(97)00406-2
    [4]
    CAREY M, CRAWFORD I. Scheduling trains on a network of busy complex stations[J]. Transportation Research Part B: Methodological, 2007, 41 (2): 159-178. doi: 10.1016/j.trb.2006.02.002
    [5]
    CHAKROBORTY P, VIKRAM D. Optimum assignment of trains to platforms under partial schedule compliance[J]. Transportation Research Part B: Methodological, 2008, 42 (2): 169-184. doi: 10.1016/j.trb.2007.07.003
    [6]
    DELORME X, GANDIBLEUX X, RODRIGUEZ J. Stability evaluation of a railway timetable at station level[J]. European Journal of Operational Research, 2009, 195 (3): 780-790. doi: 10.1016/j.ejor.2007.06.062
    [7]
    LI Wen-quan, WANG Wei, CHENG Shi-hui. Scheduling model and algorithm of using up-and-down lines on railway marshalling station[J]. Systems Engineering—Theory and Practice, 2000, 20 (6): 75-78. (in Chinese) doi: 10.3321/j.issn:1000-6788.2000.06.013
    [8]
    XU Jie, DU Wen, CHANG Jun-qian, et al. The genetic based algorithm optimization plan of using the arrival and departure track at railway sectional station[J]. China Railway Science, 2003, 24 (2): 109-114. (in Chinese) doi: 10.3321/j.issn:1001-4632.2003.02.020
    [9]
    LEI Ding-you, Wang Dong, LIU Ming-xiang. Optimization model and algorithm of utilization of arrival and departure tracks in railroad passenger station[J]. Journal of Traffic and Transportation Engineering, 2007, 7 (5): 84-87. (in Chinese) doi: 10.3321/j.issn:1671-1637.2007.05.018
    [10]
    ZHANG Ying-gui, LEI Ding-you, LIU Ming-xiang. Scheduling model and algorithm for track application in railway station[J]. China Railway Science, 2010, 31 (2): 96-100. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201002023.htm
    [11]
    JIA Wen-zheng, MAO Bao-hua, HO Tin-jin, et al. Model and algorithm for track allocation at large-scale rail way passenger stations[J]. Journal of the China Railway Society, 2010, 32 (2): 8-13. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201002002.htm
    [12]
    ZHANG Ying-gui, LEI Ding-you, TANG Bo, et al. Due window scheduling model and algorithmof track utilization in railway passenger stations[J]. Journal of the China Railway Society, 2011, 33 (1): 1-7. (in Chinese) doi: 10.3969/j.issn.1001-8360.2011.01.001
    [13]
    LEI Ding-you, ZHANG Ying-gui, LIU Ming-xiang. Scheduling model and algorithm of carriage operations arrangements in railway passenger technology stations[J]. Journal of the China Railway Society, 2007, 29 (6): 1-6. (in Chinese) doi: 10.3321/j.issn:1001-8360.2007.06.001
    [14]
    GAREY M R, JOHNSON D S. Two-processor scheduling with start-times and deadlines[J]. SIAM Journal on Computing, 1977, 6 (3): 416-426. doi: 10.1137/0206029
    [15]
    BLAZEWICZ J, LENSTRA J K, RINNOOYKAN A H G. Scheduling subject to resource constraints: classification and complexity[J]. Discrete Applied Mathematics, 1983, 5 (1): 11-24. doi: 10.1016/0166-218X(83)90012-4
    [16]
    CHEN C L, BULFIN R L. Complexity of single machine, multi-criteria scheduling problems[J]. European Journal of Operational Research, 1993, 70 (1): 115-125. doi: 10.1016/0377-2217(93)90236-G
    [17]
    LOUKIL T, TEGHEMJ, TUYTTENS D. Solving multiobjective production scheduling problems using metaheuristics[J]. European Journal of Operational Research, 2005, 161 (1): 42-61.

Catalog

    Article Metrics

    Article views (837) PDF downloads(485) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return