Citation: | WEN Chao, PENG Qi-yuan, CHEN Yu-hong. Running conflict mechanism of high-speed railway tarin[J]. Journal of Traffic and Transportation Engineering, 2012, 12(2): 119-126. doi: 10.19818/j.cnki.1671-1637.2012.02.017 |
[1] |
MAKKINGA F, METSELAAR S. Automatic conflict detection and decision support for optimal usage of railway infrastructure[C]//ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways VII. Southampton: WIT Press, 2000: 1057-1064.
|
[2] |
GOVERDE R M P, HANSEN I A. TNV-prepare: analysis of dutch railway operations based on train detection data[C]//ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways VII. Southampton: WIT Press, 2000: 779-788.
|
[3] |
YUAN Jian-xin, HANSEN I A. Optimizing capacity utiliza-tion of stations by estimating knock-on train delays[J]. Transportation Research Part B: Methodological, 2007, 41(2): 202-217. doi: 10.1016/j.trb.2006.02.004
|
[4] |
GOVERDE R M P. Railway timetable stability analysis using max-plus system theory[J]. Transportation Research Part B: Methodological, 2007, 41(2): 179-201. doi: 10.1016/j.trb.2006.02.003
|
[5] |
ALEXANDER F. A fuzzy knowledge-based system for rail-way traffic control[J]. Engineering Applications of Artificial Intelligence, 2000, 13(6): 719-729. doi: 10.1016/S0952-1976(00)00027-0
|
[6] |
OH S M, HONG S H, CHOI I C. Railway conflict detection and resolution in the Korean railway system[C]//ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways IX. Southampton: WIT Press, 2004: 675-684.
|
[7] |
JOHANNA T. Computer-based decision support for railway traffic scheduling and dispatching: a review of models and algorithms[C]//KROON L G, ROLF H M. The 5th Workshop on Algorithmic Methods and Models for Optimization of Railways. Wadern: Leibniz Center for Informatics, 2006: 1-23.
|
[8] |
MOZZARELLA M, OTTAVIANI E. A traffic management system for real-time traffic optimization in railways[J]. Transportation Research Part B: Methodological, 2007, 41(2): 246-274. doi: 10.1016/j.trb.2006.02.005
|
[9] |
TSANG C W, HO T K. The conflict resolution at connected railway junctions[C]//IU V P, LAMAS L N, LI Y P, et al. Proceedings of the 9th International Conference EPMESC IX. New York: Taylor and Francis, 2003: 987-993.
|
[10] |
D'ARIANO A, PRANZO M, HANSEN I A. Conflict reso-lution and train speed coordination for solving real-time time-table perturbations[J]. IEEE Transactions on Intelligent Transportation System, 2007, 8(2): 208-222. doi: 10.1109/TITS.2006.888605
|
[11] |
ALBRECHT T. The Influence of anticipating train driving on the dispatching process in railway conflict situations[J]. Networks and Spatial Economics, 2009, 9(1): 85-101. doi: 10.1007/s11067-008-9089-0
|
[12] |
CHENG Y H, YANG Li-an. A fuzzy petri nets approach for railway traffic control in case of abnormality: evidence from Taiwan railway system[J]. Expert Systems with Applica-tions, 2009, 36(4): 8040-8048. doi: 10.1016/j.eswa.2008.10.070
|
[13] |
聂磊, 张星臣, 赵鹏, 等. 高速铁路列车运行计划调整策略的研究[J]. 铁道学报, 2001, 23(4): 1-6. doi: 10.3321/j.issn:1001-8360.2001.04.001
NIE Lei, ZHANG Xing-chen, ZHAO Peng, et al. Study on the strategy of train operation adjustment on high speed rail-way[J]. Journal of the China Railway Society, 2001, 23(4): 1-6. (in Chinese). doi: 10.3321/j.issn:1001-8360.2001.04.001
|
[14] |
史峰, 黎新华, 秦进, 等. 单线列车运行调整的最早冲突优化方法[J]. 中国铁道科学, 2005, 26(1): 106-113. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200501020.htm
SHI Feng, LI Xin-hua, QIN Jin, et al. The earliest conflict optimal method for train operation adjustment on single track railway[J]. China Railway Science, 2005, 26(1): 106-113. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200501020.htm
|
[15] |
文超, 彭其渊, 文欢. 高速铁路列车运行冲突管理研究现状综述[J]. 中国安全科学学报, 2010, 20(5): 140-150. https://www.cnki.com.cn/Article/CJFDTOTAL-ZAQK201005027.htm
WEN Chao, PENG Qi-yuan, WEN Huan. Review on conflict management of train operation on high-speed railway[J]. China Safety Science Journal, 2010, 20(5): 140-150. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZAQK201005027.htm
|
[16] |
文超, 彭其渊, 陈芋宏. 高速铁路列车运行冲突管理总论[J]. 中国安全科学学报, 2010, 20(10): 8-12. doi: 10.3969/j.issn.1003-3033.2010.10.002
WEN Chao, PENG Qi-yuan, CHEN Yu-hong. Pandect on the operation conflict management of high-speed train[J]. China Safety Science Journal, 2010, 20(10): 8-12. (in Chinese). doi: 10.3969/j.issn.1003-3033.2010.10.002
|
[17] |
田钊. 基于一类混合Petri网的列车运行系统中冲突因素的分析[D]. 郑州: 郑州大学, 2011.
TIAN Zhao. Conflict analysis of train operation system based on a class of hybrid Petri nets[D]. Zhengzhou: Zhengzhou University, 2011. (in Chinese).
|
[18] |
陈荣武, 刘莉, 郭进. 基于遗传算法的列车运行能耗优化算法[J]. 交通运输工程学报, 2012, 12(1): 108-114. doi: 10.3969/j.issn.1671-1637.2012.01.017
CHEN Rong-wu, LIU Li, GUO Jin. Optimization algorithm of train operation energy consumption based on genetic algo-rithm[J]. Journal of Traffic and Transportation Engineering, 2012, 12(1): 108-114. (in Chinese). doi: 10.3969/j.issn.1671-1637.2012.01.017
|
[19] |
周文梁, 史峰, 陈彦, 等. 客运专线网络列车开行方案与运行图综合优化方法[J]. 铁道学报, 2011, 33(2): 1-7. doi: 10.3969/j.issn.1001-8360.2011.02.001
ZHOU Wen-liang, SHI Feng, CHEN Yan, et al. Method of integrated optimization of train operation plan and diagram for network of dedicated passenger lines[J]. Journal of the China Railway Society, 2011, 33(2): 1-7. (in Chinese). doi: 10.3969/j.issn.1001-8360.2011.02.001
|
[20] |
贾晓秋, 关晓宇. 列车运行图布线方法研究[J]. 铁道运输与经济, 2011, 33(4): 81-84. https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS201104021.htm
JIA Xiao-qiu, GUAN Xiao-yu. Research on routing method of train operation diagram[J]. Railway Transport and Economy, 2011, 33(4): 81-84. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS201104021.htm
|
[21] |
周伟, 秦世引, 万百五. 列车运行调整问题研究现状及发展趋势[J]. 系统工程, 1997, 15(2): 17-22. https://www.cnki.com.cn/Article/CJFDTOTAL-GCXT199702003.htm
ZHOU Wei, QIN Shi-yin, WAN Bai-wu. The train operation adjustment: current status and prospects[J]. Systems Engin-eering, 1997, 15(2): 17-22. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GCXT199702003.htm
|
[22] |
金福才, 胡思继, 刘智丽. 列车运行调整方案实时安全诊断算法研究[J]. 中国安全科学学报, 2004, 14(1): 53-56. https://www.cnki.com.cn/Article/CJFDTOTAL-ZAQK200401015.htm
JIN Fu-cai, HU Si-ji, LIU Zhi-li. Real-time safety diagnosis algorithm of train operation adjustment plan[J]. China Safety Science Journal, 2004, 14(1): 53-56. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZAQK200401015.htm
|
[23] |
周学松, 朱钰, 胡思继. 基于列车运行状态推导图的列车运行调整算法[J]. 铁道学报, 1999, 21(6): 1-5. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB199906000.htm
ZHOU Xue-song, ZHU Yu, HU Si-ji. Research on the algo-rithm for train regulation based on train running state deriva-tion graph[J]. Journal of the China Railway Society, 1999, 21(6): 1-5. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB199906000.htm
|