Citation: | WU Qing, LUO Shi-hui, WEI Chong-feng, MA Wei-hua. Dynamics simulation models of coupler systems for freight locomotive[J]. Journal of Traffic and Transportation Engineering, 2012, 12(3): 37-43. doi: 10.19818/j.cnki.1671-1637.2012.03.006 |
[1] |
MA Wei-hua, SONG Rong-rong, JIE Chang-an, et al. Influ-ences of buffer impedance characteristics on dynamics per-formances for heavy haul train[J]. Journal of Traffic andTransportation Engineering, 2011, 11(2): 59-64.
|
[2] |
YANG Jun-jie, LIU Jian-xin, LUO Shi-hui, et al. Test studyon stability control of locomotive coupler in heavy haul com-bined train[J]. Journal of Southwest Jiaotong University, 2009, 44(6): 882-886.
|
[3] |
NCR, Datong Electric Locomotive Co., Ltd. The report on research & amp; amp; improvement of the HXD2 coupler system[R]. Datong: NCR, Datong Electric Locomotive Co., Ltd., 2008.
|
[4] |
Transportation Safety Board of Canada. Railway investigation report R02C0050[R]. Ottawa: TSB Canada, 2002.
|
[5] |
CHERKASHIN U M, ZAKHAROV S M, SEMECHKIN A E. An overview of rolling stock and track monitoring systemsand guidelines to provide safety of heavy and long train opera-tion in the Russian railways[J]. Journal of Rail and RapidTransit, 2009, 223(2): 199-208. doi: 10.1243/09544097JRRT226
|
[6] |
NASR A, MOHAMMANDI S. The effects of train brake delay time on in-train forces[J]. Journal of Rail and Rapid Transit, 2010, 224(6): 523-534. doi: 10.1243/09544097JRRT306
|
[7] |
CHANG Chong-yi, WANG Cheng-guo, MA Da-wei, et al. Study on numerical analysis of longitudinal forces of the T20 000 heavy haul[J]. Journal of the China Railway Society, 2006, 28(2): 89-94. https://www.researchgate.net/publication/297311254_Study_on_numerical_analysis_of_longitudinal_forces_of_the_T20000_heavy_haul
|
[8] |
EL-SIBAIE M. Recent advancements in buff and draft testing techniques[C]∥ASME. Proceedings of 1993 IEEE/ASME Joint Railroad Conference. New York: ASME, 1993: 115-119.
|
[9] |
SHEN Gang, ZHOU Jin-song, REN Li-hui. Study on model-ling method for train dynamics[J]. Journal of TongjiUniversity: Natural Science, 2004, 32(11): 1495-1498.
|
[10] |
LUO Shi-hui, FENG Quan-bao, YANG Jun-jie. Research ondynamics of the HXD2heavy-load locomotive bearing longitu-dinal compressive strength[J]. Railway Locomotive and Car, 2008, 28(S): 145-148, 177. https://en.cnki.com.cn/Article_en/CJFDTOTAL-TDJC2008S1037.htm
|
[11] |
MA Wei-hua, LUO Shi-hui, SONG Rong-rong. Coupler dynamicperformance analysis of heavy haul locomotives[J]. VehicleSystem Dynamics, 2012, 50(5): 1-18. doi: 10.1080/00423114.2012.667134
|
[12] |
WEI Wei. Brake performances of 20 000ton connected train[J]. Journal of Traffic and Transportation Engineering, 2007, 7(6): 12-16. https://www.researchgate.net/publication/290054332_Brake_performances_of_20_000_ton_connected_train
|
[13] |
DUNCAN I B, WEBB P A. The longitudinal behaviour ofheavy haul trains using remote locomotives[C]∥Insititutionof Engineers. the Fourth International Heavy Haul RailwayConference: Railway in Action. Brisbane: Insititution ofEngineers, 1989: 587-590.
|
[14] |
COLE C. Improvements to wagon connection modelling forlongitudinal train simulation[C]∥WARDINA O. Conference onRailway Engineering Innovation for a Competitive Edge. Rockhampton: Central Queesland University, 1998: 187-194.
|
[15] |
LI Gu. The report on safety experiment of 1+1HXD2loco-motive towing million ton combined train[R]. Beijing: ChinaAcademy of Railway Sciences, 2008.
|