Citation: | MEI Gui-ming, ZHANG Wei-hua, LIU Hong-jiao. Dynamic performances of different structural catenary[J]. Journal of Traffic and Transportation Engineering, 2002, 2(2): 27-31. |
[1] |
Manabe K, Morikawa T, Hikita M. On dynamics of overhead equipment and multi-pantograph system[J]. Quarterly Reports of RTRI, 1986, 27(1): 21-25.
|
[2] |
Vinayagalingam T. Computer evaluation of controlled pantographs for current collection from simple catenary overhead equipment at high speed[J]. ASME Journal of Dynamic System, Measurement, and Control, 1983, 105: 287-294. doi: 10.1115/1.3140673
|
[3] |
Link M, Nowak B. Zur dynamischen analyse des systems stromabnehmer und fahrleitung, dargestellt am bcispiel des intercity experimental[J]. VDI Berichte, 1986, 603: 245-261.
|
[4] |
Seering W, Armbruster K, Vesely C, et al. Experimental and analytical study of pantograph dynamics[J]. ASME Journal of Dynamics System, Measurement, and Control, 1991, 113: 242-247. doi: 10.1115/1.2896371
|
[5] |
MEI Gui -ming. The study on the vertical coupling dynamics of the pantograph/catenary system[D]. Chengdu: Southwest Jiaotong University, 2001.
|
[6] |
WU Tian-xing. Study of current collection from caten-ary-pantograph at high speed by simulation[J]. Journal of the China Railway Society, 1996, 18(4): 55-61.
|