Citation: | PEI Yu-long, WANG Xiao-ning. Determining method of traffic impact range of project[J]. Journal of Traffic and Transportation Engineering, 2004, 4(3): 82-84. |
[1] |
PEI Yu-long, WANG Xiao-ning. Study on large-scale project traffic impact analysis in Harbin[J]. Journal of Kunming University of Science and Technology, 2002, 27(Sup): 159—162. (in Chinese)
|
[2] | 张子栋. 城市交通影响分析中阈值的研究[D]. 北京: 北京工业大学, 2001. |
[3] |
The Transportation Planners Council of the Institute of Transportation Engineers. A summary of a proposed recommended practice: traffic access and impact studies for site development[J]. ITE Journal, 1988, 54(1): 17—24.
|
[4] | 黄肇义, 黄翔, 晏克非. 交通影响分析中确定交通影响范围方法的研究[A]. 中国城市交通规划学术委员会论文集[C]. 北京: 地质出版社, 1999. |
[5] |
WANG Li. Determining the cloudy model of traffic impact analysis[J]. China Journal of Highway and Transport, 2001, 14(1): 100— 102. (in Chinese) doi: 10.3321/j.issn:1001-7372.2001.01.023
|
[6] | 王丽, 刘小明, 任福田. 大城市交通影响分析体系研究[A]. 中国城市交通规划学术委员会论文集[C]. 北京: 地质出版社, 1999. |
[7] | 王晓宁. 交通影响范围确定及交通影响费取值的研究[D]. 哈尔滨: 哈尔滨工业大学, 2002. |