Citation: | SUO Qing-hui, QIAN Yong-jiu. Time-Dependent Reliability Index Calculation of Existed Highway Bridge[J]. Journal of Traffic and Transportation Engineering, 2006, 6(1): 69-71. |
[1] |
GB 50283-1999, 公路工程结构可靠度设计统一标准[S].
|
[2] |
杨伟军, 张建仁, 梁兴文. 基于动态可靠度的服役桥梁维修加固策略[J]. 中国公路学报, 2002, 15 (3): 49-52. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200203010.htm
YANG Wei-jun, ZHANG Jian-ren, LIANG Xing-wen. Strategy of Repair and Reinforcement on Existing Bridge Based on Time-Dependent Reliability[J]. China Journal of Highway and Transport, 2002, 15 (3): 49-52. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200203010.htm
|
[3] |
MORI Y, ELLI NGWOOD R. Reliability Based Service-Life Assessment of Aging Concrete Structures[J]. Journal of Structural Engineering, 1993, 119 (5): 1 600-1 621. doi: 10.1061/(ASCE)0733-9445(1993)119:5(1600)
|
[4] |
ENRIGHT MP, FRANGOPOL D M. Failure Time Prediction of Deterioration Fail-Safe Structures[J]. Journal of Structural Engineering, 1998, 124 (12): 1 448-1 457.
|
[5] |
Animesh Dey, Sankaran Mahadevan. Reliability Estimationwith Time-Variant Loads and Resistances[J]. Journal of Structural Engineering, 2000, 126 (5): 612-620. doi: 10.1061/(ASCE)0733-9445(2000)126:5(612)
|
[6] |
姜海波, 车惠民. 既有铁路桥梁疲劳与承载力可靠性评估[J]. 土木工程学报, 2000, 33 (1): 29-32. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC200001006.htm
JIANG Hai-bo, CHE Hui-min. Reliability Assessment for the Resistance and Fatigue of Existing Railway Bridge[J]. Journal of Civil Engineering, 2000, 33 (1): 29-32. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC200001006.htm
|
[7] |
ENRIGHT M P, FRANGOPOL D M. Service-Life Prediction of Deterioration Concrete Bridge[J]. Journal of Structural Engineering, 1998, 124 (3): 309-317.
|
[8] |
盛骤, 谢式千, 潘承毅. 概率论与数理统计[M]. 北京: 高等教育出版社, 2001.
|
[9] |
李贵青, 李秋胜. 工程结构时变可靠度理论及其应用[M]. 北京: 科学出版社, 2001.
|