Citation: | XUE Xiao-rong. Calculation method of economic evaluation indices for highway engineering project[J]. Journal of Traffic and Transportation Engineering, 2008, 8(4): 58-60. |
[1] | 刘晓君. 工程经济学[M]. 北京: 中国建筑工业出版社, 2003. |
[2] | 张三省. 工程经济学[M]. 西安: 世界图书出版社, 2005. |
[3] |
CHEN Chuan-de, ZHANG Ming-yuan. Investment decision for highway project based on risk analysis[J]. China Journal ofHighway and Transport, 2006, 19(1): 99-103. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL200601020.htm
|
[4] |
XI ANG Shou-sheng, ZHAO Yan-feng. Astudy on economic evaluation for alternatives of engineering project on fuzzy and random condition[J]. Journal of Northwest University: Natural Science Edition, 2008, 38(3): 404-406. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XBDZ200803015.htm
|
[5] |
LI UBao-ding, LI U Yan-kui. Expected value of fuzzy variable and fuzzy expected models[J]. IEEE Transactions on Fuzzy Systems, 2002, 10(4): 445-450. doi: 10.1109/TFUZZ.2002.800692
|
[6] |
LI U Yan-kui, LI U Bao-ding. Fuzzy random variables: ascalar expected value operator[J]. Fuzzy Optimization and Decision Making, 2003, 2(2): 143-160. doi: 10.1023/A:1023447217758
|
[7] | 刘宝碇, 赵瑞清, 王纲. 不确定规划及应用[M]. 北京: 清华大学出版社, 2006. |
[8] |
SONG Ye-xin, CHEN Yong-bing, FEI Jun. Decision making of investment combination with fuzzy state probability[J]. Systems Engineering and Electronics, 2004, 26(6): 751-753. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XTYD200406013.htm
|
[9] |
LI Jian-xin, HU Gang. Stock-price fluctuation analyses basedon fuzzy probability[J]. Systems Engineering-Theory & Practice, 2006, 26(9): 33-42. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL200609004.htm
|
[10] |
CEGIZ H K. Optimization of multilevel invest ments using dynamic programming based on fuzzy cash flows[J]. Fuzzy Optimization and Decision Making, 2003, 2(2): 101-122.
|