| Citation: | ZHANG Tian-wei, GAO Gui-feng, LUO Yu-ping, NIE Lei. Calculation model of maximum number for gathering passenger at railway passenger station[J]. Journal of Traffic and Transportation Engineering, 2011, 11(2): 79-83. doi: 10.19818/j.cnki.1671-1637.2011.02.013 |
| [1] |
MA Wei-wu, LIU Xiao-yan, Li Li-qing, et al. Research of waiting time of passengers at railway stations[J]. Journal of the China Railway Society, 2009, 31 (5): 104-107. (in Chinese) doi: 10.3969/j.issn.1001-8360.2009.05.017
|
| [2] |
HE Yu-qiang, MAO Bao-hua, CHEN Shao-kuan, et al. Research onthe methods of calculating the maximum assembling at railway passenger stations[J]. Journal of the China Railway Society, 2006, 28 (1): 6-11. (in Chinese) doi: 10.3321/j.issn:1001-8360.2006.01.002
|
| [3] |
ZHANG Tian-wei. Research on the assembling rule of passengers at railway passenger stations[J]. Journal of the China Railway Society, 2009, 31 (1): 31-34. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB200901008.htm
|
| [4] |
ZHANG Tian-wei, YAN Yue-xia, WANG Yang, et al. Research on the calculation models of area and number of waiting rooms at super-scale railway passenger stations[J]. Journal of the China Railway Society, 2010, 32 (2): 105-108. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201002020.htm
|
| [5] |
TANG Bo, LEI Ding-you, ZHANG Ying-gui, et al. Calculating method of carrying capacity for railway station bottleneck[J]. Journal of Traffic and Transportation Engineering, 2010, 10 (6): 69-74. (in Chinese) doi: 10.3969/j.issn.1671-1637.2010.06.012
|
| [6] |
SHI Feng, CHEN Yan, QIN Jin, et al. Comprehensive optimization of arrival-departure track utilization and inboundoutbound route assignment in railway passenger station[J]. China Railway Science, 2009, 30 (6): 108-113. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK200906019.htm
|
| [7] |
NIE Lei, HUBi-song, FU Hui-ling, et al. Interaction analysis between night train operation and maintenance time on passenger dedicated railway line[J]. Journal of Transportation System Engineering and Information Technology, 2010, 10 (5): 66-72. doi: 10.1016/S1570-6672(09)60064-7
|
| [8] |
LIEBCHEN C, SCHACHTEBECK M, SCHOBEL A, et al. Computing delay resistant railway timetables[J]. Computers and Operations Research, 2010, 37 (5): 857-868. doi: 10.1016/j.cor.2009.03.022
|
| [9] |
DELORME X, GANDIBLEUX X, RODRIGUEZJ. Stability evaluation of a railway timetable at a station level[J]. European Journal of Operation Research, 2009, 195 (3): 780-790.
|
| [10] |
VANSTEENWEGEN P, VAN OUDHEUSDEN D. Developing railway timetable which guarantee a better service[J]. European Journal of Operation Research, 2006, 173 (1): 337-350.
|
| [11] |
GOVERDE R M P. Adelay propagation algorithm for largescale railway traffic networks[J]. Transportation Research Part C: Emerging Technologies, 2010, 18 (3): 269-287.
|
| [12] |
BURDETT R L, KOZAN E. A disjunctive graph model and framework for constructing new train schedules[J]. European Journal of Operation Research, 2010, 200 (1): 85-98.
|
| [13] |
BURDETT R L, KOZAN E. Techniques for inserting additional trains into existing timetable[J]. Transportation Research Part B: Methodological, 2009, 43 (8/9): 821-836.
|
| [14] |
CASTILLO E, GALLEGO I, URENA G J, et al. Timetabling optimization of a mixed double-and single-tracked railway network[J]. Applied Mathematical Modelling, 2011, 35 (2): 859-878.
|
| [15] |
CORMAN F, D'ARIANO A, PACCIARELLI D, et al. A tabu search algorithm for rerouting trains during rail operations[J]. Transportation Research Part B: Methodological, 2010, 44 (1): 175-192.
|