Citation: | XUE Feng, CHEN Chong-shuang, YANG Yun-gui. 3D measure method of space-time unbalance for arrival and departure wagon flows at railway technical station[J]. Journal of Traffic and Transportation Engineering, 2013, 13(5): 67-75. |
[1] |
郝立光, 张星臣. 列车流到发车站的均衡性评价方法研究[J]. 铁道学报, 2000, 22 (5): 13-16. doi: 10.3321/j.issn:1001-8360.2000.05.003
HAO Li-guang, ZHANG Xing-chen. Study on equilibrium evaluation of train flow arrived at and departure from a station[J]. Journal of the China Railway Society, 2000, 22 (5): 13-16. (in Chinese). doi: 10.3321/j.issn:1001-8360.2000.05.003
|
[2] |
梁明珠, 赵华. 路网、区域性编组站现状评价及对策研究[J]. 中国铁道科学, 2001, 22 (3): 21-26. doi: 10.3321/j.issn:1001-4632.2001.03.004
LIANG Ming-zhu, ZHAO Hua. Study on railway network and regional marshalling yard assessment and countermeasure[J]. China Railway Science, 2001, 22 (3): 21-26. (in Chinese). doi: 10.3321/j.issn:1001-4632.2001.03.004
|
[3] |
王万平, 谢海红. 非均衡运输条件下技术站能力计算方法的初步探讨[J]. 北方交通大学学报, 2002, 26 (1): 98-102. https://www.cnki.com.cn/Article/CJFDTOTAL-BFJT200201021.htm
WANG Wan-ping, XIE Hai-hong. Primary study on calculation methods of technological station capacity under unbalanced transportation conditions[J]. Journal of Northern Jiaotong University, 2002, 26 (1): 98-102. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-BFJT200201021.htm
|
[4] |
李海鹰, 杨肇夏. 基于不均衡运输的编组站能力计算方法探讨[J]. 北京交通大学学报, 2005, 29 (6): 9-12. doi: 10.3969/j.issn.1673-0291.2005.06.003
LI Hai-ying, YANG Zhao-xia. Computation of capacity at marshalling yard based on imbalanced transport circumstances[J]. Journal of Beijing Jiaotong University, 2005, 29 (6): 9-12. (in Chinese). doi: 10.3969/j.issn.1673-0291.2005.06.003
|
[5] |
李海鹰, 张超. 编组站到解系统通过能力计算方法[J]. 中国铁道科学, 2010, 31 (3): 120-125. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201003023.htm
LI Hai-ying, ZHANG Chao. Calculation method for the carrying capacity of the arriving and breaking up system in marshalling yard[J]. China Railway Science, 2010, 31 (3): 120-125. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK201003023.htm
|
[6] |
王焱. 提速后不均衡运输对大型编组站能力的影响分析[D]. 北京: 北京交通大学, 2007.
WANG Yan. Analysis of influence of unbalanced transport on the capacity of large marshalling yard after speedingup[D]. Beijing: Beijing Jiaotong University, 2007. (in Chinese).
|
[7] |
熊坚, 漆昕, 刘正喜. 车流不均衡条件下编组站作业组织研究[J]. 铁道运输与经济, 2011, 33 (8): 5-9. doi: 10.3969/j.issn.1003-1421.2011.08.002
XIONG Jian, QI Xin, LIU Zheng-xi. Operation organization of marshalling yard under unbalanced traffic flow[J]. Railway Transport and Economy, 2011, 33 (8): 5-9. (in Chinese). doi: 10.3969/j.issn.1003-1421.2011.08.002
|
[8] |
MORLOK E K, CHANG D J. Measuring capacity flexibility of a transportation system[J]. Transportation Research Part A: Policy and Practice, 2004, 38 (6): 405-420. doi: 10.1016/j.tra.2004.03.001
|
[9] |
YUAN Jia-xin, HANSEN I A. Optimizing capacity utilization of stations by estimating knock-on train delays[J]. Transportation Research Part B: Methodological, 2007, 41 (2): 202-217. doi: 10.1016/j.trb.2006.02.004
|
[10] |
D'ARIANO A, PACCIARELLI D, PRANZO M. A branch and bound algorithm for scheduling trains in a railway network[J]. European Journal of Operational Research, 2007, 183 (2): 643-657. doi: 10.1016/j.ejor.2006.10.034
|
[11] |
D'ARIANO A, CORMAN F, PACCIARELLI D, et al. Reordering and local rerouting strategies to manage train traffic in real-time[J]. Transportation Science, 2008, 42 (4): 405-419. doi: 10.1287/trsc.1080.0247
|
[12] |
CORMAN F, D'ARIANO A, PACCIARELLI D, et al. A tabu search algorithm for rerouting trains during rail operations[J]. Transportation Research Part B: Methodological, 2010, 44 (1): 175-192. doi: 10.1016/j.trb.2009.05.004
|
[13] |
曲思源, 徐行方. 既有繁忙干线时段性通过能力规划模型及算法[J]. 交通运输工程学报, 2010, 10 (1): 77-81. http://transport.chd.edu.cn/article/id/201001014
QU Si-yuan, XU Xing-fang. Planning model and calculating method of period carrying capacity on busy existed railway main-lines[J]. Journal of Traffic and Transportation Engineering, 2010, 10 (1): 77-81. (in Chinese). http://transport.chd.edu.cn/article/id/201001014
|
[14] |
汤波, 雷定猷, 张英贵, 等. 铁路车站咽喉通过能力计算方法[J]. 交通运输工程学报, 2010, 10 (6): 69-74. http://transport.chd.edu.cn/article/id/201006012
TANG Bo, LEI Ding-you, ZHANG Ying-gui, et al. Calculating method of carrying capacity for railway station bottleneck[J]. Journal of Traffic and Transportation Engineering, 2010, 10 (6): 69-74. (in Chinese). http://transport.chd.edu.cn/article/id/201006012
|
[15] |
刘敏, 韩宝明, 李得伟. 高速铁路车站通过能力计算和评估[J]. 铁道学报, 2012, 34 (4): 9-15. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201204005.htm
LIU Min, HAN Bao-ming, LI De-wei. Calculation and evaluation of carrying capacities at high-speed railway stations[J]. Journal of the China Railway Society, 2012, 34 (4): 9-15. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201204005.htm
|
[16] |
田亚明. 铁路网编组站改变能力配置优化模型[J]. 铁道学报, 2013, 35 (6): 6-12. https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201306003.htm
TIAN Ya-ming. Railway marshalling yards reclassification capacity configuration optimization model[J]. Journal of the China Railway Society, 2013, 35 (6): 6-12. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDXB201306003.htm
|
[17] |
曲思源. 不均衡运输条件下车流调整的优化[J]. 铁道运输与经济, 2007, 29 (2): 41-43, 52. https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS200702006.htm
QU Si-yuan. Optimization for wagon-flow adjustment under unbalanced transportation conditions[J]. Railway Transport and Economy, 2007, 29 (2): 41-43, 52. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS200702006.htm
|
[18] |
杨运贵. 铁路车站能力的计算方法与查定技术研究[D]. 成都: 西南交通大学, 2010.
YANG Yun-gui. Study on calculating methods and investigating-determining technologies of railway station capacity[D]. Chengdu: Southwest Jiaotong University, 2010. (in Chinese).
|
[19] |
孟令云, 杨肇夏, 李海鹰. 单线铁路区间能力失效条件下列车运行调整模型[J]. 系统工程理论与实践, 2012, 32 (4): 885-894. https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201204028.htm
MENG Ling-yun, YANG Zhao-xia, LI Hai-ying. Train dispatching models under field capacity breakdowns on singletrack railway lines[J]. Systems Engineering—Theory and Practice, 2012, 32 (4): 885-894. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XTLL201204028.htm
|
[20] |
郑建东. 成都北站组号数量对驼峰解体能力的影响分析[J]. 铁道运输与经济, 2013, 35 (6): 43-45, 70. https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS201306013.htm
ZHENG Jian-dong. Analysis on influence of group indication number in Chengdu North Station on hump uncoupling capacity[J]. Railway Transport and Economy, 2013, 35 (6): 43-45, 70. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDYS201306013.htm
|
[21] |
端嘉盈, 何世伟, 申永生. 客运专线建成后既有繁忙干线铁路新增货运通过能力研究[J]. 武汉理工大学学报: 交通科学与工程版, 2012, 36 (2): 378-381. https://www.cnki.com.cn/Article/CJFDTOTAL-JTKJ201202036.htm
DUAN Jia-ying, HE Shi-wei, SHEN Yong-sheng. Study on the railway increasing freight carrying capacity of the existing busy main-line after the completion of passenger-only line[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2012, 36 (2): 378-381. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-JTKJ201202036.htm
|
[22] |
LUKASZEWICZ P. Energy consumption and running time for trains: modelling of running resistance and driver behavior based on full scale testing[D]. Stockholm: KTH Royal Institute of Technology, 2001.
|