Citation: | WANG Xiao-ping, QI Huan, XIAO Heng-hui, ZHANG Xiao-pan, HU Yang, FENG Xiao-jian. Co-scheduling model of Three Gorges-Gezhou Dam based on series queuing network[J]. Journal of Traffic and Transportation Engineering, 2006, 6(3): 82-86. |
[1] |
Zhang Wei, Liao Peng, Wu Ling-li, et al. Main parameters of waterway lock capacity[J]. Journal of Traffic and Transportation Engineering, 2004, 4 (3): 108-110. (in Chinese) http://transport.chd.edu.cn/article/id/200403025
|
[2] |
Du Jing-nong, Yu Shao-ming. Dynamic programming model and algorithmof ship lock scheduling problem[J]. Computer and Digital Engineering, 2003, 31 (3): 47-50. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSSG200303011.htm
|
[3] |
Lu Fang-yong, Qi Huan, Cao Jie. The computer application and research of permanent ship lock navigation lock chamber scheduling arrangement[J]. Application Research of Computers, 2000, 17 (6): 65-67. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSYJ200006023.htm
|
[4] |
Liu Yun-feng, Qi Huan. Application of DFS algorithmin the arranging of Three-Gorges permanent lock chamber[J]. Computer Engineering, 2002, 28 (8): 224-226. (in Chinese) doi: 10.3969/j.issn.1000-3428.2002.08.087
|
[5] |
Liu Yun-feng, Qi Huan. The two-dimension optimization arranging heuristic algorithmandits applicationin the Yangtse Gorges permanent shiplock decision system[J]. Computer and Modernization, 2002, 18 (1): 1-3. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JYXH200201000.htm
|
[6] |
Lai Wei, Qi Huan. The MADM of Three Gorges ship gates running[J]. Control and Decision, 2002, 17 (2): 163-166. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-KZYC200202008.htm
|
[7] |
Zhang Run-tong, Zhu Xiao-min. Fuzzy control of arrivals to two queues in series[J]. Acta Automatica Sinica, 2000, 26 (2): 192-198. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-MOTO200002006.htm
|
[8] |
Ma Rong-guo, Liu Yan-ni. Weight value determination method of highway construction comprehensive evaluation[J]. Journal of Traffic and Transportation Engineering, 2005, 5 (2): 110-112. (in Chinese) http://transport.chd.edu.cn/article/id/200502026
|