| Citation: | CHEN Chao, ZHANG Zhe, CENG Qing-cheng. Integrated scheduling model of mixed cross-operation for container terminal[J]. Journal of Traffic and Transportation Engineering, 2012, 12(3): 92-100. doi: 10.19818/j.cnki.1671-1637.2012.03.014 |
| [1] |
YAN Wei, HUANG You-fang, CHANG Dao-fang, et al. An investigation into knowledge-based yard crane scheduling for container terminals[J]. Advanced Engineering Informat-ics, 2011, 25(3): 462-471. doi: 10.1016/j.aei.2011.03.001
|
| [2] |
GUO Xi, HUANG S Y, HSU W J, et al. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information[J]. Advanced Engineering Informatics, 2011, 25(3): 472-484. doi: 10.1016/j.aei.2011.02.002
|
| [3] |
SALIDO M A, RODRIGUEZ-MOLINS M, BARBER F. A decision support system for managing combinatorial problems in container terminals[J]. Knowledge-Based Systems, 2012, 29(5): 63-74. https://www.sciencedirect.com/science/article/pii/S0950705111001377
|
| [4] |
JIN Zhi-hong, LI Na. Optimazation of quay crane dynamic scheduling based on berth schedules in container terminal[J]. Journal of Transportation Systems Engineering and Informa-tion Technology, 2011, 11(3): 58-64. (in Chinese). doi: 10.3969/j.issn.1009-6744.2011.03.009
|
| [5] |
CAO Jin-xin, SHI Qi-xin, LEE D H. Integrated quay crane and yard truck schedule problem in container terminals[J]. Tsinghua Science and Technology, 2010, 15(4): 467-474. doi: 10.1016/S1007-0214(10)70089-4
|
| [6] |
CHEN Chao, WANG Hai-yan. An optimal model of container quay berth production operation[J]. Journal of Dalian Mari-time University, 2009, 35(4): 52-54, 58. (in Chinese). doi: 10.3969/j.issn.1671-7031.2009.04.012
|
| [7] |
JI Ming-jun, JIN Zhi-hong. A united optimization of crane scheduling and yard trailer routing in a container terminal[J]. Journal of Fudan University: Natural Science, 2007, 46(4): 476-480, 488. (in Chinese). doi: 10.3969/j.issn.0427-7104.2007.04.011
|
| [8] |
ZENG Qing-cheng, YANG Zhong-zhen. Integrating simula-tion and optimization to schedule loading operations in con-tainer terminals[J]. Computers and Operations Research, 2009, 36(6): 1935-1944. doi: 10.1016/j.cor.2008.06.010
|
| [9] |
ZENG Qing-cheng, YANG Zhong-zhen. Two-phase tabu search algorithm of unloading operation scheduling project incontainer wharf[J]. Journal of Traffic and Transportation Engineering, 2007, 7(2): 109-112, 122. (in Chinese). doi: 10.3321/j.issn:1671-1637.2007.02.023
|
| [10] |
ZHOU Peng-fei, KANG Hai-gui. Study on berth and quay-crane allocation under stochastic environments in container terminal[J]. Systems Engineering-Theory and Practice, 2008, 28(1): 161-169. (in Chinese). doi: 10.3321/j.issn:1000-6788.2008.01.024
|
| [11] |
KIM K H, PARK Y M. A crane scheduling method for port container terminals[J]. European Journal of Operational Research, 2004, 156(3): 752-768. doi: 10.1016/S0377-2217(03)00133-4
|
| [12] |
BISH E K. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003, 144(1): 83-107. doi: 10.1016/S0377-2217(01)00382-4
|
| [13] |
ZENG Qing-cheng, HU Xiang-pei, YANG Zhong-zhen. Model for disruption management of berth allocation and quay crane scheduling in container terminals[J]. Systems Engin-eering-Theory and Practice, 2010, 30(11): 2026-2035. (in Chinese). doi: 10.12011/1000-6788(2010)11-2026
|
| [14] |
NISHIMURA E, IMAI A, PAPADIMITRIOU S. Yard trailer routing at a maritime container terminal[J]. Transportation Research Part E: Logistics and Transportation Review, 2005, 41(1): 53-76. doi: 10.1016/j.tre.2003.12.002
|
| [15] |
GOODCHILD A V, DAGANZO C F. Double-cycling strat-egies for container ships and their effect on ship loading and unloading operations[J]. Transportation Science, 2006, 40(4): 473-483. doi: 10.1287/trsc.1060.0148
|
| [16] |
GOODCHILD A V, DAGANZO C F. Crane double cycling in container ports: planning methods and evaluation[J]. Transportation Research Part B: Methodological, 2007, 41(8): 875-891. doi: 10.1016/j.trb.2007.02.006
|
| [17] |
ZENG Qing-cheng, YANG Zhong-zhen, LU Jing. Sched-uling model and algorithm of integrating loading and unloading operations in same ship-bay at container terminal[J]. Journal of Traffic and Transportation Engineering, 2010, 10(1): 88-93. (in Chinese). http://transport.chd.edu.cn/article/id/201001016
|
| [18] |
ZENG Qing-cheng, YANG Zhong-zhen, LAI Lu-yuan. Models and algorithms for multi-crane oriented scheduling method in container terminals[J]. Transport Policy, 2009, 16(5): 271-278. doi: 10.1016/j.tranpol.2009.08.006
|
| [19] |
LI Na. The combined scheduling of coutinuous berth and quay crane at container terminal[D]. Dalian: Dalian Maritime Uni-versity, 2011. (in Chinese).
|
| [20] |
JIAO YU, KANG YU-tao, YIN Xiao-bei, et al. Forecasting and early-warning model of port traffic resource carrying capacity[J]. Journal of Traffic and Transportation Engineer-ing, 2012, 12(2): 84-92. (in Chinese). http://transport.chd.edu.cn/article/id/201202012
|