LI Yan-hui, CHEN Kuan-min, MA Jing, LI Yan, WANG Yu-ping. Optimization of tram operation network based on considering traffic demand characteristics[J]. Journal of Traffic and Transportation Engineering, 2017, 17(6): 64-75.
Citation: LI Yan-hui, CHEN Kuan-min, MA Jing, LI Yan, WANG Yu-ping. Optimization of tram operation network based on considering traffic demand characteristics[J]. Journal of Traffic and Transportation Engineering, 2017, 17(6): 64-75.

Optimization of tram operation network based on considering traffic demand characteristics

More Information
  • Author Bio:

    LI Yan-hui(1988-), male, doctoral student, liyanhuisatan@163.com

    CHEN Kuan-min(1957-), male, professor, PhD, chenkm@yeah.net

  • Received Date: 2017-06-13
  • Publish Date: 2017-12-25
  • In order to improve the scientificity and operation efficiency of tram network planning, the characteristics and indicators of tram operation network were studied, and the operation network searching method based on the characteristics of passenger flow demand was established.The separation characteristics of tram network and operation was considered, and the passenger flow demand-operation benefit was used to establish the node-edge network.Based on the section passenger flow volume, the initial selection threshhold was determined by Chebyshev law.The optimal operating beneficial model of time benefit-ticket price-operation cost was established bycomputing importance degrees and node-passerger volume matrix.The tram operation network was selected, and the overall scale of operation network was controlled by the genetic algorithm.Based on the tram network planning project in Xixian New Area, 14 operation lines were selected, the optimization of tram operation newtork was simulated by MATLAB softwore.Analysis result shows that the optimization operation line length of the tram is between 24-25 km, and the total scale of operation network is 339.5 km.The final operational network is well matched with the optimization benefit, the distribution of section passenger flow, the layout of tram network, the characteristics of passenger demand and the important distribution points of passenger flow, and most of the lines' lengths are less than 30 km, which meets the general tram operation network requirements.The optimization method takes into account many practical factors in the planning and operation of tram.Through the integration and quantification of searching process, the optimization result and the demand characteristics are more consistent.

     

  • loading
  • [1]
    ZHU Jun-gong, LONG Bing, HU Xing-hua. Signal priority strategy for modern tram in the environment of vehicle/road cooperation[J]. Urban Mass Transit, 2017, 23 (4): 107-112. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GDJT201704023.htm
    [2]
    ZHOU Yang-fan, JIA Shun-ping, CHEN Shao-kuan, et al. Optimization model signal priority time threshold of tram[J]. Journal of Traffic and Transportation Engineering, 2016, 16 (5): 151-158. (in Chinese). http://transport.chd.edu.cn/article/id/201605017
    [3]
    CHEN Fu-gui, TAN Xiao-tu. Research on the crossing priority parameters of modern trams[J]. Journal of Railway Engineering Society, 2016, 8 (5): 116-120. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-TDGC201608023.htm
    [4]
    JIANG Zhi-bin, XU Rui-hua. Scheduling optimization of tram operation diagram under signal passive priority condition[J]. Journal of Traffic and Transportation Engineering, 2016, 16 (3): 100-107. (in Chinese). doi: 10.3969/j.issn.1671-1637.2016.03.012
    [5]
    FONTAINE L, NOVALES M, BERTRAND D, et al. Safety and operation of tramways in interaction with public space[J]. Transportation Research Procedia, 2016, 14: 1114-1123. doi: 10.1016/j.trpro.2016.05.182
    [6]
    LI Yan, ZHAO Zhi-hong, LI Peng-fei, et al. Review of traffic signal control methods under over-saturated condition[J]. Journal of Traffic and Transportation Engineering, 2013, 13 (4): 116-126. doi: 10.3969/j.issn.1671-1637.2013.04.017
    [7]
    NAZNIN F, CURRIE G, LOGAN D, et al. Application of a random effects negative binomial model to examine traminvolved crash frequency on route sections in Melbourne, Australia[J]. Accident Analysis and Prevention, 2016, 92: 15-21. doi: 10.1016/j.aap.2016.03.012
    [8]
    LI Yan, ZHOU Wen-hui, NAN Si-rui, et al. Reliability based optimization of construction arrangement for single rail transit work zone[J]. Journal of Transportation Systems Engineering and Information Technology, 2017, 17 (5): 250-256. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-YSXT201705036.htm
    [9]
    SHALABY A, ABDULHAI B, LEE J. Assessment of streetcar transit priority options using microsimulation modelling[J]. Canadian Journal of Civil Engineering, 2003, 30 (6): 1000-1009.
    [10]
    HUANG You-neng, GONG Shao-feng, CAO Yuan, et al. Optimization model of energy-efficient driving for train in urban rail transit based on particle swarm algorithm[J]. Journal of Traffic and Transportation Engineering, 2016, 16 (2): 118-124, 142. (in Chinese). http://transport.chd.edu.cn/article/id/201602014
    [11]
    JEONG Y, KIM Y. Tram passive signal priority strategy based on the MAXBAND model[J]. KSCE Journal of Civil Engineering, 2014, 18 (5): 1518-1527.
    [12]
    ZHANG Yi. Conventional bus route network optimization and application under the impact of urban rail transit[D]. Chengdu: Southwest Jiaotong University, 2014. (in Chinese).
    [13]
    YANG Ming, GONG Xi-zhen. A low carbon bi-level optimization model for public transport network[J]. Journal of Highway and Transportation Research and Development, 2015, 32 (11): 143-147. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK201511023.htm
    [14]
    YU Li-jun, LIANG Ming-ping. Urban routine bus transit network optimizing design based on integer nonlinear programming model[J]. China Journal of Highway and Transport, 2016, 29 (2): 108-115. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL201602014.htm
    [15]
    DAI Cun-jie, LI Yin-zhen, MA Chang-xi, et al. Optimization of departure frequency for bus rapid transit with multi-type vehicles under time-dependent demand[J]. Journal of Traffic and Transportation Engineering, 2017, 17 (1): 129-139. (in Chinese). http://transport.chd.edu.cn/article/id/201701015
    [16]
    XU Guang-ming, SHI Feng, LUO Xiang, et al. Method of public transit network planning based on strategy equilibrium transit assignment[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15 (3): 140-145. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-YSXT201503022.htm
    [17]
    BAAJ M H, MAHMASSANI H S. An AI-based approach for transit route system planning and design[J]. Journal of Advanced Transportation, 1991, 25 (2): 187-209.
    [18]
    HERBON A, HADAS Y. Determining optimal frequency and vehicle capacity for public transit routes: A generalized newsvendor model[J]. Transportation Research Part B: Methodological, 2015, 71 (1): 85-99.
    [19]
    VERBAS I O, MAHMASSANI H S. Optimal allocation of service frequencies over transit network routes and time periods: formulation, solution, and implementation using bus route patterns[J]. Tranportation Research Record, 2013 (2334): 50-59.
    [20]
    HADAS Y, SHNAIDERMAN M. Public-transit frequency setting using minimum-cost approach with stochastic demand and travel time[J]. Transportation Research Part B: Methodological, 2012, 46 (8): 1068-1084.
    [21]
    SIVAKUMARAN K, LI Yu-wei, CASSIDY M J, et al. Costsaving properties of schedule coordination in a simple trunkand-feeder transit system[J]. Transportation Research Part A: Policy and Practice, 2012, 46 (1): 131-139.
    [22]
    ZHAO Zhi-ming, GUAN Hong-zhi, HAN Yan. A method for determining main skeleton of intercity rail transit network based on bi-level optimization model[J]. Journal of Highway and Transportation Research and Development, 2015, 32 (10): 102-107. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK201510017.htm
    [23]
    CURRENT J R, SCHILLING D A. The median tour and maximal covering tour problems: formulations and heurstics[J]. European Journal of Operational Research, 1994, 73 (1): 114-126.
    [24]
    TAN Jian-mei, LIU Jin-cheng, XU Yun-hui. A method for planning intercity rail transit network layout based on traffic location[J]. Journal of Highway and Transportation Research and Development, 2016, 33 (10): 131-136. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK201610020.htm
    [25]
    MA Chao-qun, WANG Yu-ping. Method ot optimize urban rail transit network based on maximizing the passenger flow[J]. Journal of Chang'an University: Natural Science Edition, 2010, 30 (1): 76-79. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XAGL201001017.htm
    [26]
    LIU Hua-sheng. Study on key methods of coordinate optimization between rail and bus[D]. Changchun: Jilin University, 2015. (in Chinese).
    [27]
    YUAN Chang-wei, WU Qun-qi, YUAN Hua-zhi, et al. Optimization of urban public transport network considering rail transit interaction effect[J]. Journal of Highway and Transportation Research and Development, 2014, 31 (8): 119-125. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-GLJK201408020.htm
    [28]
    CHEN Dan, XU Wen-yuan. Optimization scheme of rail transportation and conventional bus lines based on genetic algorithm[J]. Journal of Northwest University: Natural Science Edition, 2016, 46 (3): 364-370. (in Chinese). https://www.cnki.com.cn/Article/CJFDTOTAL-XBDZ201603011.htm

Catalog

    Article Metrics

    Article views (787) PDF downloads(498) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return