Citation: | YU Jing, ZHANG Wei. Multilevel-fuzziness-comprehensiveness evaluation model of waterway net planning[J]. Journal of Traffic and Transportation Engineering, 2005, 5(4): 96-100. |
[1] |
Jiang Ye, Chu Zhi-yu. Application of AHP-entropy evaluation and decision model for comprehensive evaluation of waterway net planning[J]. Port and Waterway Engineering, 2001, 25(6): 30—34. (in Chinese) doi: 10.3969/j.issn.1002-4972.2001.06.009
|
[2] |
Huang Xian-yong, Mao Ming-hai. The quantitative evaluation of the tourismresources of water conservancy by using analytical hierarchy process[J]. Journal of Zhejiang University(Science Edition), 2001, 28(3): 327—332. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HZDX200103016.htm
|
[3] |
Yan Qi-peng, Wang Zhong-qiang. Application of AHP to the general planning of yard and station of highway main hub[J]. Journal of Southwest Jiaotong University, 1999, 34(2): 223—227. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XNJT902.018.htm
|
[4] |
Wang Jian-jun, Zhao Hui-li, Dou Hui-juan. Study on the basic of AHP in choosing traffic and transportation means[J]. Journal of Shijiazhuang Railway Institute, 2004, 17(2): 45—48. (in Chinese) doi: 10.3969/j.issn.2095-0373.2004.02.011
|
[5] |
Li Tie-zhu, Liu Yong, Lu Can, et al. Comprehensive evaluation on original and terminal stations of urban public transport[J]. Journal of Traffic and Transportation Engineering, 2005, 5(1): 86—91. (in Chinese) http://transport.chd.edu.cn/article/id/200501021
|
[6] |
Liang Jun, Jiang Wei, Li Xu-hong. An improvement on fuzzy comprehensive evaluation method and its use in urban traffic planning[J]. Journal of Traffic and Transportation Engineering, 2002, 2(4): 68—72. (in Chinese) http://transport.chd.edu.cn/article/id/200204015
|
[7] | 黄健元. 模糊集及其应用[M]. 宁夏: 宁夏人民教育出版社, 1999. |
[8] | 王众托. 系统工程引论[M]. 北京: 电子工业出版社, 1991. |
[9] | 江苏省交通规划设计院, 苏州市交通局. 苏州市航道网规划报告[R]. 南京: 江苏省交通规划设计院, 2004. |